LR-N17-0055, Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 20

From kanterella
Jump to navigation Jump to search
Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 20
ML17052A151
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 02/16/2017
From: Mannai D
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N17-0055
Download: ML17052A151 (6)


Text

SAFEGUARDS INFORMATION When separated from Security-R~lated Information in Enclosure 1 and Safeguards.

Information in Enclosure 2, this document is decontrolled provided the transmitt~.1 document does not otherwise warrant protection from unauthorized disclosure.

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0PSE:G Nucler1T !JC LR-N17-0055 10 CFR 50.54(p) .

10 CFR 73.21 FEB 16 2017 10 CFR 2.390 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0Q01 Salem Nuclear Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No: 50-354

Subject:

Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 20 Pursuant to the requirements of 10 CFR 50.54(p)(2), PSEG Nuclear, LLC (PSEG),

  • hereby submits Revision 20 to the Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent .

Spent Fuel Storage Installation Security Program. Enclosure 1 contains Form 2 -

10 CFR 50.54(p) Evaluation Form for the Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 20, implemented on December 23, 2016, that eliminates the Security checkpoint from the Physical Security

.Plan and moved body armor from the lfst of equipment that may be available to the required equipment list in Section 9.

  • Enclosure 1 also contains the NEI security plan change template from NEI 11-08, Guidance on Submitting Security Plan Changes.
  • PSEG requests that Enclosure 1, which contains security-related information, be withheld from public disclosure in accordance wittl 10 CFR 2.390.

SAFEGUARDS INFORMATION When separated from Security-Related Information in Enclosure1 and Safeguards Information in Enclosure 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

SAFEGUARDS. INFORMATION When separated from Security-Related Information in Enclosure 1 and Safeguards Information in Enclosure 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

FEB i 6 2017 Page 2 10 CFR 50.54(p)

LR-N 17-0055 10 CFR 73.21 10 CFR 2.390 A copy of the revised Salem-Hope Creek Generating Stations Security-Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program document in its entirety is included in Enclosure 2.

This revision contains the nomenclature from NEI 03-.12 Revision 7, "Template for the Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program." The document included in Enclosure 2 has been determined to contain safeguards information. PSEG requests that this information be withheld from public disclosure in accordance with 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," paragraph (a)(1 ).

.There are no regulatory commitments contained in this letter. In accordance with the requirements of 10 CFR 50.54(p )(2), the signed original is being sent to the Document Control Desk and one copy is being sent to .Region I.

If you have any questions or require additional information, please do not hesitate to contact me at (856) 339-2061.

  • Sincerely,
  • Davi J. Mannai Sr. Director Regulatory Operations Enclosures - (1) - contains Security-Related Information (2) - contains Safeguards Information

. cc (with Enclosures)

D. Dorman, Administrator - Region 1 NRC U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 SAFEGUARDS INFORMATION When separated from Security-Related Information in Enclosure 1 and Safeguards Information in Enclosure 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION When separated from Security-Related Information in Enclosure 1 and Safeguards Information in Enclosure 2, this document is decontrolled provided the transmittal

. document does not otherwise warrant protection from unauthorized disclosure.

FEB i 6 2017 Page 3 10 CFR 50.54(p)

LR-N17-0055 10 CFR 73.21 10 CFR 2.390 cc (all w/o Enclosures)

  • Carleen Parker, Project Manager, US NRC NRC Senior Resident Inspector, Salem NRC Senior Resident Inspector, Hope Creek .

P. Mulligan, Chief, NJBNE T. Cachaza, Commitment Tracking Coordinator, Salem T. MacEwen, Commitment Tracking Coordinator, Hope Creek L. Marabella, Corporate Commitment Tracking Coordinator SAFEGUARDS INFORMATION When separated from Security-Related Information in Enclosure 1 and Safeguards Information in Enclosure 2, this document is decontrolled provided the transmittal document does not otherwisewarrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION When separated from Security-Related Information in Enclosure 1 and Safeguards Information in Enclosure 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Page 4 10 CFR 50.54(p)

LR-N 17-0055 10 CFR 73.21 10 CFR 2.390 bee: (all w/o Enclosures)

Director, Security Manager, Licensing Records Management SAFEGUARDS INFORMATION .

When separated from Security-Related Information in Enclosure 1 and Safeguards Information in Enclos_ure 2, this document is decontrolled provided the. transmittal document does not otherwise warrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION When separated from Security-Related Information in Enclosure 1 and Safeguards Information in Enclosure 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

LR-N17-0055 Enclosure 1 Form 2 - 10 CFR 50.54(p) Evaluation Form and NEI Security Plan Change Template from NEI 11-08 SAFEGUARDS INFORMATION .

When separated from Security-Related Information in Enclosure 1 and Safeguards Information in Enclosure 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

SAFEGUARDS INFORMATION When separated from Security-Related Information in Enclosure 1 and Safeguards Information in Enclosure 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

LR-N1.7-0055 Enclosure 2 Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation

. Security Program, Revision 20 SAFEGUARDS INFORMATION Wheri separated from Security-Related Information in Enclosure 1 and Safeguards Information in Enclosure 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.