PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 t>S(~(i Nuclear LLC ASME Code Case N-532-5 LR-N 16-0238 JAN 1 1;2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 Docket No. 50-354

Subject:

IN-SERVICE INSPECTION ACTIVITIES - 90 DAY REPORT TWENTIETH REFUELING OUTAGE This letter submits the Owner's Activity Report (Attachment 1) for In-service Inspection (lSI) activities conducted at the Hope Creek Generating Station during the twentieth refueling outage.

This report is submitted in accordance with Code Case N-532-5, "Repair/Replacement Activity Documentation Requirements and In-Service Summary Report Preparation and Submission Section XI, Division1 ,"and within its ninety day reporting requirement.

There are no regulatory commitments in this correspondence.

If you have any questions regarding this correspondence, please contact Ms. Alysse K. Ochoa at (856) 339-2742.

Sincerely, Edward T Casulli Plant Manager - Hope Creek ako : Form OAR-1, Owner's Activity Report

LR-N16-0238 Document Control Desk Page 2 cc: Mr. Daniel H. Dorman, Regional Adminis trator- USNRC Region I Ms. Carleen Parker, USNRC Project Manager - Hope Creek Mr. Justin Hawkins, USNRC Senior Resident Inspect or- Hope Creek (X24)

Mr. Patrick Mulligan, Manager IV, NJ Bureau of Nuclear Engineering Mr. Thomas MacEwen, Hope Creek Commitment Coordinator (H02)

Mr. Lee Marabella, Corporate Commitment Coordinator (N21)

LR-N16-0238 Attachment 1 Form OAR-1 Owner's Activity Report

FORM OAR-1 OWNER'S ACTIVITY REPORT ReportNumber H~1~R~2~0 2 ____________ ____________ ____________ ____________ ____________ _____

Plant Hope Creek Generating Station Unit No. _1,_________ Commercial service date December 20, 1986 Refueling outage no. -=2""'0'---- ---

(lt applicable)

Current inspection interval lSI -Third (3rd), CISI -Second (2nd)

(1st, 2nd, 3rd, 4th, other)

Current inspection period lSI -Third (3rd), CISI -Third (3rd)

(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition, 2003 Addenda Date and revision of inspection plans Revision 3, September- 2016 Edition and Addenda of Section XI applicable to repair/replacemen t activities, if different than the inspection plans _ _ __

Same as lSI Plans Code Cases used for inspection and evaluation: N-460 N-532-5 N-613-1 & N-648-1 (If applicable, Including cases modified by Case N~532 and later revisions)

CERTIFICATE OF CONFORMANCE 1certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of ...:.H..:...1,_,Rc.:.2=0_____

(refueling outage number)

Edle T Giles I lSI Pro ram Owner Date 12/L't/Jk CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any perso~~Fel::left mage or a loss of any kind arising from or connected with this inspection.

Christo her M Miski NB 15537 A N I Inspector's Signature (National Board Number and Endorsement)

Date P-( t'-f(20l cP FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Exam Item Item Description Evaluation Description Category Number R-A R1.14 Reactor Vessel Reactor Vessel Recirculation Inlet Nozzle N2G (RPV-Recirculation Inlet Nozzle N2GSE) UT examination revealed embedded flaw that N2G 12" Safe End to exceeds IWB-3500. Evaluation was performed (order Nozzle Weld number 70190293) in accordance with IWB-3600 and found acceptable for continued use. Examination results were compared to results from previous outages {H1R15 and H1R18). Review concluded no change or growth in identified flaw.

TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Item Description of Work Repair/Replacement Code Class Description Date Plan Number Complete MC Drywell Closure Head Bolting {Item Replaced degraded Drywell Closure 11/22/16 30286093 No E1.11)- Bolting found with Head Bolting.

damaged threads and surface corrosion.

F-A Station Service Water Pump Support Replaced Station Service Water 11/11/16 60132081

{Item No. F1.40)- Baseplate anchor Pump Baseplate Anchor Bolting.

bolting was found severely corroded.