MONTHYEARLR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds2022-03-21021 March 2022 Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0013, In-Service Inspection Activities - 90-Day Report2022-02-10010 February 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0061, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2021-12-0909 December 2021 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N21-0083, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion2021-11-24024 November 2021 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0066, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2021-11-10010 November 2021 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations 2023-09-08
[Table view] |
Text
PSEG P.O. Box 236, Hancocks Bridge, NJ 08038-0236 OPSEG Nuclear LLC 10 CFR 50.55a LR-N12-0043 February 7,2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311
Subject:
1ST Relief Request to Implement OMN-18 for the Fourth Ten-Year Inservice Testing Interval for Salem Units 1 and 2 In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (a)(3), PSEG Nuclear, LLC (PSEG) hereby requests NRC approval for a proposed alternative to requirements associated with the In-Service Testing Program for Salem Units 1 and 2. The attachment identifies the affected components, applicable code requirements, reasons for the request, proposed alternative, basis for use and duration.
The proposed alternative would be implemented during the fourth ten-year interval. PSEG requests approval of this request by February 7,2013.
There are no regulatory commitments contained in this submittal. If you have any questions or require additional information, please contact Lee Marabella at (856) 339-1208.
Respectfully, Q1JLfl-i Paul R. Duke' v - \
Manager, Licensing Attachments: 10 CFR 50.55a Request Number P-03
ATTN: Document Control Desk February 7,2012 LR-N12-0043 Page 2 cc: Regional Administrator - NRC Region 1 NRC Senior Resident Inspector - Salem NRC Project Manager NJBNE Salem Commitment Coordinator Corporate Commitment Coordinator
Attachment LR-N12-0043 10 CFR 50.55a Request Number P-03 Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(i):
Alternative Provides Acceptable level of Quality and Safety
- 1. ASME Code ComQonent{s} Affected Pump Description Class Category Unit 81 CVC-1 CVE4 11 Boric Acid Transfer Pump 3 Group A 1 81 CVC-1 CVE5 12 Boric Acid Transfer Pump 3 Group A 1 82CVC-2CVE4 21 Boric Acid Transfer Pump 3 Group A 2 82CVC-2CVE5 22 Boric Acid Transfer Pump 3 Group A 2 S1CC -1CCE2 11 Component Cooling Pump 3 Group A 1 S1CC -1CCE4 12 Component Cooling Pump 3 Group A 1 S1CC -1CCE3 13 Component Cooling Pump 3 Group A 1 82CC -2CCE2 21 Component Cooling Pump 3 Group A 2 S2CC -2CCE4 22 Component Cooling Pump 3 Group A 2 S2CC -2CCE3 23 Component Cooling Pump 3 Group A 2 81CH -1CHE5 11 Chilled Water Pump 3 Group A 1 S1CH -1CHE6 12 Chilled Water Pump 3 Group A 1 82CH -2CHE6 21 Chilled Water Pump 3 Group A 2 82CH -2CHE7 22 Chilled Water Pump 3 Group A 2 S18F -1SFE5 11 8pent Fuel Cooling Pump 3 Group A 1 S1SF -18FE6 128pent Fuel Cooling Pump 3 Group A 1 S28F-28FE5 21 Spent Fuel Cooling Pump 3 Group A 2 S28F-2SFE6 22 8pent Fuel Cooling Pump 3 Group A 2
- 2. AQQlicable Code Edition and Addenda A8ME OM Code-2001, with Addenda through OMb-2003
- 3. AQQlicable Code Requirements Table 18TB-3400-1, "Inservice Test Frequency" Table 18TB-3500-1, "Required Instrument Accuracy" Table ISTB-51 00-1, "Centrifugal Pump Test Acceptance Criteria" ISTB-5123, "Comprehensive Test Procedure" - for centrifugal pumps (except vertical line shaft) 1
Attachment LR-N12-0043
4. Reason for Request
Pursuant to 10 CFR SO.SSa, "Codes and Standards," paragraph (a)(3), relief is requested from the requirements of ASME OM Code ISTB-S123, Table ISTB-3400-1 and Table ISTB-S100-1. The basis for the relief request is that the proposed alternative would provide an acceptable level of quality and safety.
The ASME OM Code Committee has approved Code Case OMN-18, "Alternative Testing Requirements for Pumps Tested Quarterly within +/- 20% of Design Flow," which allows owners to perform a Group A test in lieu of the Comprehensive Pump Test (CPT) if the Group A test is conducted at +/- 20% of the design flow rate and uses pressure instruments that meet the CPT accuracy requirements (+/-1/2%). This Code Case was not reviewed for approval in Regulatory Guide 1.192, "Operation and Maintenance Code Case Acceptability, ASME OM Code", June 2003.
The basis for this change is that a quarterly Group A pump test, performed at the CPT flow rate provides more consistent data for trending than a Group A test in conjunction with a biennial CPT.
The increased requirements imposed by the proposed alternative on the parameters to be monitored during every quarterly pump test and the more accurate instruments that must consistently be used during quarterly testing of pumps classified as Group A, allow PSEG to perform better trending of pump performance data due to the more consistent requirements for each of the quarterly tests.
Due to the increased requirements on the parameters imposed by the proposed alternative during all quarterly tests there is no added value in performing the biennial Comprehensive Test.
- 5. Proposed Alternative and Basis for Use PSEG proposes that in lieu of the CPT requirements of Table ISTB-3400-1, Group A tests will be performed quarterly within +/- 20 percent of the pump design flow rate, with pressure measuring instrumentation meeting the (+/-1/2%) instrument accuracy requirements of Table ISTB-3S00-1 specified for the biennial Comprehensive Test. In addition, PSEG has elected to restrict the upper limit for differential pressure to 6%, which is more conservative than the 10% upper limit established in Table ISTB-S100-1 for Group A tests as this limit provides needed margin while maintaining an acceptable level of quality and safety, and is consistent with the limit authorized by NRC in similar relief requests. This proposed change to the acceptance range is more restrictive than specified in the current Code Case (OMN-18).
Vibration testing will continue to be performed under the proposed modified Group A test and the acceptance criteria for vibration will be the same as required for Group A tests as shown in Table ISTB-S100-1.
2
Attachment LR-N12-0043 Using the provisions of this relief request as an alternative to those specified in ISTB-5123 will provide adequate indication of pump performance, permit consistent detection of component degradation, and continue to provide an acceptable level of quality and safety.
Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), PSEG requests relief from the specific ISTB reqUirements identified in this request.
- 6. Duration of Proposed Alternative The proposed alternative will be used for the remainder of the Fourth Ten-Year Inservice Testing Interval for Salem Units 1 and 2.
- 7. Precedents Similar requests have been authorized at other facilities including;
- PERRY NUCLEAR POWER PLANT, UNIT NO.1 -RELIEF REQUEST PR-3 FOR THIRD 10-YEAR PUMP AND VALVE INSERVICE TESTING PROGRAM (TAC NO.
ME0820) (ML092640690)
- ST. LUCIE UNIT NOS. 1 AND 2 -RELIEF FROM THE REQUIREMENTS OF THE ASME CODE, RELIEF REQUEST NO.9 (TAC NOS. ME5190 AND ME5191)
(ML11143A077)
- SOUTH TEXAS PROJECT, UNITS 1 AND 2 -RELIEF REQUEST NOS. VRR-01, PRR-01, PRR-02, AND PRR-03 FOR THE THIRD 10-YEAR INSERVICE TESTING PROGRAM INTERVAL (TAC NOS. ME3515, ME3516, ME3517, ME3518, ME3519, ME3520, ME3521, AND ME3522) (ML102150077)
- 8. References ASME OM Code, 2001 Edition with Addenda through OMb-2003, Subsection ISTB Code case OMN-18, "Alternative Testing Requirements for Pumps Tested Quarterly within +/- 20%
of Design Flow" 3