Supplement to License Amendment Request S09-03, LAR to Correct Technical Specification and Facility Operating License Editorial Items
ML101100469
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/12/2010
From: Fricker C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N10-0121
Download: ML101100469 (2)


Text

PSEG P.O. Box 236, Hancocks Bridge, NJ 08038-0236 0 PSEG Nuclear LLC APR 1ii 2010 10 CFR 50.90 LR-N10-0121 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Salem Generating Station - Unit 1 and Unit 2 Facility Operating License Nos. DPR-70 and DPR 75 NRC Docket Nos. 50-272 AND 50-311

Subject:

Supplement to License Amendment Request (LAR) S09-03, LAR to Correct Technical Specification and Facility Operating License Editorial Items

References:

(1) Letter from PSEG to NRC, "License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items," dated September 14, 2009 In Reference 1, PSEG Nuclear LLC (PSEG) submitted a license amendment request for the facility operating licenses listed above. The request would correct editorial items in the Technical Specifications (TS) and Facility Operating License (FOL) for both Salem Units 1 and 2. These items were either historical in nature, or were errors inadvertently created during the submittal of other license amendment requests and subsequent license amendments. The proposed changes were administrative in nature and fell into one of four categories: (1) correct typographical errors, (2) correct format errors, (3) correct administrative differences between Units, or (4) delete historical requirements that have expired.

Subsequent to submittal of Reference 1, PSEG discovered a potential conflict with one of the Unit 2 pages submitted as part of Reference 1, and an Amendment already issued, but pending implementation (Amendment 276). Specifically, Unit 2 page 3/4 1-18 is pending implementation as part of Amendment 276, which is not scheduled to be implemented until prior to entering Mode 2 following refueling outage 2R18 (currently scheduled for spring 2011). The same page was included in Reference 1 with additional proposed changes. To avoid a potential implementation conflict, PSEG is requesting that Salem Unit 2 page 3/4 1-18 be withdrawn from the Reference 1 License Amendment Request.

PSEG has reviewed the information supporting a finding of no significant hazards consideration that was provided to the NRC in Reference 1. The additional information provided in this letter does not affect the conclusion that the proposed license amendment does not involve a significant hazards consideration. No regulatory commitments are contained in this submittal.

/cc 7(A-).

1Iocument Control Desk 2 APR 1l2j0t LR-N10-0121 If you have any questions or require additional information, please do not hesitate to contact Mr.

Jeff Keenan at (856) 339-5429.