Category:Letter type:L
MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-038, Submittal of Revised Pressure and Temperature Limits Report2019-09-19019 September 2019 Submittal of Revised Pressure and Temperature Limits Report L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-025, Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP)2019-08-27027 August 2019 Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 22019-06-13013 June 2019 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-19-003, Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP)2019-02-0404 February 2019 Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-19-005, Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.692019-01-15015 January 2019 Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.69 L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 2024-01-02
[Table view] Category:Report
MONTHYEARML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23075A3512022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 6 of 7) ML23075A3482022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 3 of 7) ML23075A3472022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 2 of 7) L-PI-23-002, WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 7 of 7)2022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 7 of 7) ML23075A3462022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 1 of 7) ML23075A3502022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 5 of 7) ML23075A3492022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 4 of 7) ML22003A1832022-01-0303 January 2022 Refueling Outage Unit 2 R32 Owner'S Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML21285A2812021-10-12012 October 2021 Revised Pressure and Temperature Limits Report ML20272A2932020-09-28028 September 2020 (PINGP) Unit 1 and 2 Revised Pressure and Temperature Limits Report ML20265A0892020-09-15015 September 2020 Draft License Conversation Record L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency ML17279A1242017-09-30030 September 2017 Enclosure 5 to L-PI-17-041, Westinghouse WCAP-17400-NP, Supplemental 1, Revision 2, Spent Fuel Pool Criticality Safety Analysis Supplemental Analysis Including the Storage of Ifba Bearing Fuel L-PI-16-058, Special Report: Timely Restoration of Operability of Explosive Gas Monitoring Instrumentation2016-07-22022 July 2016 Special Report: Timely Restoration of Operability of Explosive Gas Monitoring Instrumentation L-PI-16-054, Pressure and Temperature Limits Report, Revision 52016-06-22022 June 2016 Pressure and Temperature Limits Report, Revision 5 L-PI-16-051, 10 CFR 50.46 Emergency Core Cooling System Annual Report2016-06-22022 June 2016 10 CFR 50.46 Emergency Core Cooling System Annual Report L-PI-15-034, Pressure and Temperature Limits Report (PTLR) Revision 42015-05-14014 May 2015 Pressure and Temperature Limits Report (PTLR) Revision 4 ML15037A4582015-03-0606 March 2015 Staff Assessment of the Aging Management Program for Reactor Vessel Internal Components L-PI-14-131, Fifth Ten-Year Interval Snubbers Testing Program2014-12-18018 December 2014 Fifth Ten-Year Interval Snubbers Testing Program ML17297A3232014-11-14014 November 2014 Enclosure 2 (Redacted): Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal for Prairie Island Unit 1 ML16005A1102014-09-25025 September 2014 Redacted 2014 Decommissioning Cost Analysis for the Prairie Island Nuclear Generating Plant ML14148A4772014-06-17017 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14120A1622014-05-0909 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident L-PI-14-045, Enclosure to L-PI-14-045, Transition Report, Revision 12014-04-30030 April 2014 Enclosure to L-PI-14-045, Transition Report, Revision 1 L-PI-14-028, PINGP Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2014-03-27027 March 2014 PINGP Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML14030A5402014-02-27027 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14041A2042014-02-26026 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Prairie Island Nuclear Generating Plant, Units 1 and 2, TAC Nos.: MF0834 and MF0835 L-PI-13-080, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-26026 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-PI-12-108, Final Response to NRC Request for Information, Per 10CFR50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-26026 November 2012 Final Response to NRC Request for Information, Per 10CFR50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident L-PI-12-103, Final Response to NRC Request for Lnformation Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Lnsiqhts from the Fukushima Dai-ichi Accident2012-11-26026 November 2012 Final Response to NRC Request for Lnformation Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Lnsiqhts from the Fukushima Dai-ichi Accident ML12278A4052012-09-28028 September 2012 Prairie Island, Units 1 and 2, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors ML13133A0632012-06-27027 June 2012 H4, Rev. 27, Offsite Dose Calculation Manual (Odcm). ML12159A2562012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Daiichi Nuclear Power Plant Accident L-PI-10-076, Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 52010-07-23023 July 2010 Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 5 ML1021002592010-06-30030 June 2010 Seismic Fragilities for Unit #1 and Unit #2 Turbine Building Piping and Equipment ML1016901712010-06-11011 June 2010 Enclosure 6, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16275, Effects of Pipe Whip Interactions for Various Pipe Combinations for Internal Flooding Sdp. ML1016901702010-06-11011 June 2010 Enclosure 5, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16270, Screening of Pipe Whip Interactions for Sdp. ML1016901682010-06-11011 June 2010 Enclosure 3, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16090, Turbine Building Flooding SDP: Cl Turbine Building Pipe Break Analysis. ML1016901692010-06-10010 June 2010 Enclosure 4, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16154, Turbine Building Flooding SDP: Cl Turbine Building Seismic Pipe Break Analysis. L-PI-10-005, Ninety-Day 1R26 Post-Outage Report Pursuant to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal & Containment Spray Systems2010-02-18018 February 2010 Ninety-Day 1R26 Post-Outage Report Pursuant to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal & Containment Spray Systems ML1019703862009-12-31031 December 2009 Ground Water Investigation: an Improved Flow Net to Evaluate Pathways for a Potential Ground Water Release ML1002001312009-12-21021 December 2009 Report No. 0900634.401, Revision 2, Updated Leak-Before-Break Evaluation for Several RCS Piping at Prairie Island Nuclear Generating Plant, Units 1 & 2. ML1002001322009-12-18018 December 2009 Report 0900634.402, Revision 2, Updated Leak-Before-Break Report for Prairie Island Nuclear Generating Plant Unit 2 Pressurizer Surge Line Nozzle. L-PI-09-115, Radtrad and ARCON96 Input and Output Files in Support of License Amendment Request (LAR) to Adopt the Alternative Source Term Methodology2009-10-27027 October 2009 Radtrad and ARCON96 Input and Output Files in Support of License Amendment Request (LAR) to Adopt the Alternative Source Term Methodology ML1008406402009-09-11011 September 2009 Advisory Brief of Prairie Island Nuclear Generating Plant Study Group to State of Minnesota, Office of Administrative Hearings for the Public Utilities Commission, Sept. 11, 2009. Submitted with Comments on Draft Generic Environmental Impac L-PI-09-021, 2008 Unit 2 180-Day Steam Generator Tube Inspection Report2009-04-27027 April 2009 2008 Unit 2 180-Day Steam Generator Tube Inspection Report ML1020302362008-12-31031 December 2008 State of Wisconsin Prairie Island Environmental Radioactivity Survey ML0834701962008-11-21021 November 2008 PINGP - License Renewal; Radon Health Risks 2023-09-29
[Table view] Category:Miscellaneous
MONTHYEARML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML22003A1832022-01-0303 January 2022 Refueling Outage Unit 2 R32 Owner'S Activity Report for Class 1, 2, 3 and Mc Inservice Inspections L-PI-16-058, Special Report: Timely Restoration of Operability of Explosive Gas Monitoring Instrumentation2016-07-22022 July 2016 Special Report: Timely Restoration of Operability of Explosive Gas Monitoring Instrumentation L-PI-16-051, 10 CFR 50.46 Emergency Core Cooling System Annual Report2016-06-22022 June 2016 10 CFR 50.46 Emergency Core Cooling System Annual Report ML15037A4582015-03-0606 March 2015 Staff Assessment of the Aging Management Program for Reactor Vessel Internal Components L-PI-14-131, Fifth Ten-Year Interval Snubbers Testing Program2014-12-18018 December 2014 Fifth Ten-Year Interval Snubbers Testing Program ML14148A4772014-06-17017 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14120A1622014-05-0909 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident L-PI-14-028, PINGP Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2014-03-27027 March 2014 PINGP Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident L-PI-13-080, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-26026 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-PI-12-103, Final Response to NRC Request for Lnformation Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Lnsiqhts from the Fukushima Dai-ichi Accident2012-11-26026 November 2012 Final Response to NRC Request for Lnformation Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Lnsiqhts from the Fukushima Dai-ichi Accident L-PI-12-108, Final Response to NRC Request for Information, Per 10CFR50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-26026 November 2012 Final Response to NRC Request for Information, Per 10CFR50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12278A4052012-09-28028 September 2012 Prairie Island, Units 1 and 2, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors ML12159A2562012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Daiichi Nuclear Power Plant Accident ML1016901682010-06-11011 June 2010 Enclosure 3, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16090, Turbine Building Flooding SDP: Cl Turbine Building Pipe Break Analysis. ML1016901702010-06-11011 June 2010 Enclosure 5, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16270, Screening of Pipe Whip Interactions for Sdp. ML1016901712010-06-11011 June 2010 Enclosure 6, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16275, Effects of Pipe Whip Interactions for Various Pipe Combinations for Internal Flooding Sdp. ML1016901692010-06-10010 June 2010 Enclosure 4, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16154, Turbine Building Flooding SDP: Cl Turbine Building Seismic Pipe Break Analysis. L-PI-10-005, Ninety-Day 1R26 Post-Outage Report Pursuant to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal & Containment Spray Systems2010-02-18018 February 2010 Ninety-Day 1R26 Post-Outage Report Pursuant to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal & Containment Spray Systems ML1019703862009-12-31031 December 2009 Ground Water Investigation: an Improved Flow Net to Evaluate Pathways for a Potential Ground Water Release ML1002001312009-12-21021 December 2009 Report No. 0900634.401, Revision 2, Updated Leak-Before-Break Evaluation for Several RCS Piping at Prairie Island Nuclear Generating Plant, Units 1 & 2. ML1002001322009-12-18018 December 2009 Report 0900634.402, Revision 2, Updated Leak-Before-Break Report for Prairie Island Nuclear Generating Plant Unit 2 Pressurizer Surge Line Nozzle. L-PI-09-115, Radtrad and ARCON96 Input and Output Files in Support of License Amendment Request (LAR) to Adopt the Alternative Source Term Methodology2009-10-27027 October 2009 Radtrad and ARCON96 Input and Output Files in Support of License Amendment Request (LAR) to Adopt the Alternative Source Term Methodology ML1008406402009-09-11011 September 2009 Advisory Brief of Prairie Island Nuclear Generating Plant Study Group to State of Minnesota, Office of Administrative Hearings for the Public Utilities Commission, Sept. 11, 2009. Submitted with Comments on Draft Generic Environmental Impac L-PI-09-021, 2008 Unit 2 180-Day Steam Generator Tube Inspection Report2009-04-27027 April 2009 2008 Unit 2 180-Day Steam Generator Tube Inspection Report ML1020302362008-12-31031 December 2008 State of Wisconsin Prairie Island Environmental Radioactivity Survey ML0834701962008-11-21021 November 2008 PINGP - License Renewal; Radon Health Risks ML0834000702008-10-24024 October 2008 PINGP License Renewal: Wisconsin Department of Health Prairie Island Environmental Survey 2006. Reference 2008c L-PI-07-057, Corrections to Emergency Core Cooling System (ECCS) Evaluation Models2007-08-23023 August 2007 Corrections to Emergency Core Cooling System (ECCS) Evaluation Models IR 05000282/20053012005-09-30030 September 2005 Er 50-282-05-301 (DRS) and 50-306-05-301 (Drs), on 08/09-19/05, Nuclear Management Company, LLC, Prairie Island Nuclear Generating Plant. Initial License Examination Report ML0520901582005-08-0202 August 2005 2004 External Stakeholder Response; 2004 Reactor Oversight Process External Survey - Attachment L-HU-05-012, Report of Unsatisfactory Blind Performance Testing Results, Monticello Nuclear Generating Plant & Prarie Island Nuclear Generating Plant, Units 1 and 22005-06-0303 June 2005 Report of Unsatisfactory Blind Performance Testing Results, Monticello Nuclear Generating Plant & Prarie Island Nuclear Generating Plant, Units 1 and 2 ML0522700732005-04-18018 April 2005 Event Notification Report for April 18, 2005 ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement ML0514604942004-04-0909 April 2004 Licensee Root Cause Report, CAP55527, Industrial Safety Issues and Poor Work Practices During Nozzle Dam Installation, with R. Alexander'S (Riii) Notes ML0318909462003-07-10010 July 2003 Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Duane Arnold, K ML0310401092003-04-0404 April 2003 Steam Generator (#22) & Pressurizer Flaw Evaluations ML0205206392002-01-25025 January 2002 Fqa Methodology & Shutdown Margin During Physics Tests Methodology 2023-09-29
[Table view] |