L-MT-10-058, Follow-Up Regarding Notice of Withdrawal of Letter of Intent to Transition to 10 CFR 50.48(c)

From kanterella
Jump to navigation Jump to search

Follow-Up Regarding Notice of Withdrawal of Letter of Intent to Transition to 10 CFR 50.48(c)
ML102520079
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/08/2010
From: O'Connor T
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-10-058
Download: ML102520079 (1)


Text

Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 September 8, 2010 L-MT-10-058 10 CFR 50.48 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22 Follow-Up Reqardinq Notice of Withdrawal of Letter of Intent to Transition to 10 CFR 50.48(c)

References:

1) Letter from NSPM to NRC, "Notice of Withdrawal of Letter of Intent to Transition to 10 CFR 50.48(c)," dated July 16, 2010 (ADAMS Accession MLI 02000433)

By Reference 1, Northern States Power Company, a Minnesota corporation (NSPM), submitted a letter notifying the NRC that NSPM is withdrawing the letter of intent to transition the fire protection licensing basis for Monticello Nuclear Generating Plant (MNGP) to 10 CFR 50.48(c) for MNGP.

By this letter, NSPM confirms that no formal commitments have been made as part of the transition to 10 CFR 50.48(c).

Summaw of Commitments commitments and no revisions to existing commitments.

~ o n k e l l oNuclear Generating Plant Northern States Power Company-Minnesota cc: Regional Administrator, Region Ill, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC