|
---|
Category:Letter type:L
MONTHYEARL-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-11-10010 November 2022 Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan2022-09-0606 September 2022 Sixth Interval Inservice Testing (1ST) Plan L-MT-22-037, Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-08-29029 August 2022 Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007)2022-07-22022 July 2022 Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) L-MT-22-026, Changes to the Emergency Plan2022-07-19019 July 2022 Changes to the Emergency Plan L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies2022-06-0606 June 2022 Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies L-MT-22-022, Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-05-25025 May 2022 Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-017, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report L-MT-22-018, 2021 Annual Radioactive Effluent Release Report2022-05-11011 May 2022 2021 Annual Radioactive Effluent Release Report L-MT-22-016, 2021 Annual Report of Individual Monitoring2022-04-28028 April 2022 2021 Annual Report of Individual Monitoring L-MT-22-019, Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-04-18018 April 2022 Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-22-012, Special Report for the Bypass of the Offgas Treatment Storage System2022-03-15015 March 2022 Special Report for the Bypass of the Offgas Treatment Storage System L-MT-22-008, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008)2022-03-0707 March 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008) L-MT-22-006, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006)2022-02-18018 February 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) 2024-01-11
[Table view] |
Text
Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC December 18, 2003 L-MT-03-089 10 CFR 74.13(a)
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ATTN: Mr. Larry Harris ATTN: Document Control Desk Mail Stop T-4-D-8 Washington, DC 20555 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Monticello Nuclear Generating Plant Docket 50-263 License No. DPR-22 Reporting Identification Symbol: RIS-YND Response to NRC Bulletin 2003-04: Rebaselining of Data in the Nuclear Materials Management and Safeguards System Reference 1: NRC Letter to NMC, NRC Bulletin 2003-04: Rebaselining of Data in the Nuclear Materials Management and Safeguards System, dated October 8, 2003 Reference 2: Mr. Daniel Wegener, NMC - Monticello Nuclear Generating Plant (MNGP), to Nuclear Assurance Corporation (NAC) International, Ref -
Monticello Material Status Reports, April 10, 2003, (electronic submittal via mailed diskette)
Reference 3: NMC e-mail from Mr. Brian Huxtable to Mr. Ron Bonifay, NAC International, Inventory Inquiry to Support NRC Bulletin 2003-04 for NMC Fleet, dated November 4, 2003 Reference 4 NMMSS News Special Edition NRC BULLETIN 2003-04:
Rebaselining of Data in the Nuclear Materials Management and Safeguards System, dated October 2003 Reference 5: Fax from Mr. Daniel Wegener, NMC - MNGP, to Mr. Jay Riggins, NAC International, Signed 741 revisions for Monticello Depleted U,
[Transaction Nos.: YND-YEB-000005-D, YND-YND-850300-1, and YND-YND-008509-1], dated November 17, 2003 On October 8, 2003, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2003-04 (Reference 1) to inform licensees of performance concerns associated with the reporting of data to and the resulting materials balances contained in the Nuclear Materials Management and Safeguards System (NMMSS) database. Bulletin 2003-04 2807 West County Road 75
- Monticello, Minnesota 55362-9637 Telephone: 763.295.5151
USNRC Nuclear Management Company, LLC Page 1 requested licensees perform a one-time reporting, within 90 days of the date of the bulletin, of inventory holdings of special nuclear material (SNM) and/or foreign obligated source material in their possession as well as other Government-owned materials as specified in the bulletin. The Bulletin requested licensees to submit the results of this one-time reporting of the balances of the requested material types directly to NMMSS and to coordinate with NMMSS staff resolution of any discrepancies. Subsequently, additional guidance was provided in the NMMSS News Special Edition dated October 2003 (Reference 4) and via an e-mail from Donna Hinton of NAC International to bulletin recipients, dated December 9, 2003. This letter is consistent with this guidance.
Nuclear Management Company, LLC (NMC) reported the last annual inventory for the Monticello Nuclear Generating Plant (MNGP), reporting identification symbol (RIS)-YND, on April 10, 2003, (Reference 2) as required by 10 CFR 74.13(a). NMC contacted NMMSS on November 4, 2003, (Reference 3) to validate the reported quantities of SNM, foreign obligated source material, and other types of Government-owned materials as specified in Bulletin 2003-04 in accordance with the additional guidance of NMMSS News Special Edition (Reference 4). Phone conversations and e-mails between NMC - MNGP and NMMSS clarified the discrepancy between the reported inventory values and the values recorded in the NMMSS database. Three Material Transaction Reports resolving this discrepancy were faxed between NMMSS and NMC - MNGP, signed, and returned to NMMSS on November 17, 2003, (Reference 5) reconciling the reported MNGP inventory values and the NMMSS database. Additionally, as requested, NMC is stating that MNGP has no holdings of Government-owned curium, neptunium, tritium, deuterium, americium, enriched lithium, californium or berkelium. Therefore, NMC has satisfied the intent of the Bulletin 2003-04 for the MNGP, and additional one-time reporting of inventory holdings is not required.
This letter makes no new commitments. If you have any questions please contact Mr.
Daniel Wegener, Principal Engineer (MNGP SNM Custodian), at 763-295-1267 or Mr.
Rick Loeffler, Senior Regulatory Affairs Engineer, at 763-295-1247.
Thomas J. Palmisano Site Vice President, Monticello Nuclear Generating Plant Nuclear Management Company, LLC cc: Administrator, Region III, USNRC Senior Project Manager, Monticello, USNRC Senior Resident Inspector, Monticello, USNRC NMMSS Program Administrator, Nuclear Assurance Corporation International
Text
Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC December 18, 2003 L-MT-03-089 10 CFR 74.13(a)
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ATTN: Mr. Larry Harris ATTN: Document Control Desk Mail Stop T-4-D-8 Washington, DC 20555 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Monticello Nuclear Generating Plant Docket 50-263 License No. DPR-22 Reporting Identification Symbol: RIS-YND Response to NRC Bulletin 2003-04: Rebaselining of Data in the Nuclear Materials Management and Safeguards System Reference 1: NRC Letter to NMC, NRC Bulletin 2003-04: Rebaselining of Data in the Nuclear Materials Management and Safeguards System, dated October 8, 2003 Reference 2: Mr. Daniel Wegener, NMC - Monticello Nuclear Generating Plant (MNGP), to Nuclear Assurance Corporation (NAC) International, Ref -
Monticello Material Status Reports, April 10, 2003, (electronic submittal via mailed diskette)
Reference 3: NMC e-mail from Mr. Brian Huxtable to Mr. Ron Bonifay, NAC International, Inventory Inquiry to Support NRC Bulletin 2003-04 for NMC Fleet, dated November 4, 2003 Reference 4 NMMSS News Special Edition NRC BULLETIN 2003-04:
Rebaselining of Data in the Nuclear Materials Management and Safeguards System, dated October 2003 Reference 5: Fax from Mr. Daniel Wegener, NMC - MNGP, to Mr. Jay Riggins, NAC International, Signed 741 revisions for Monticello Depleted U,
[Transaction Nos.: YND-YEB-000005-D, YND-YND-850300-1, and YND-YND-008509-1], dated November 17, 2003 On October 8, 2003, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2003-04 (Reference 1) to inform licensees of performance concerns associated with the reporting of data to and the resulting materials balances contained in the Nuclear Materials Management and Safeguards System (NMMSS) database. Bulletin 2003-04 2807 West County Road 75
- Monticello, Minnesota 55362-9637 Telephone: 763.295.5151
USNRC Nuclear Management Company, LLC Page 1 requested licensees perform a one-time reporting, within 90 days of the date of the bulletin, of inventory holdings of special nuclear material (SNM) and/or foreign obligated source material in their possession as well as other Government-owned materials as specified in the bulletin. The Bulletin requested licensees to submit the results of this one-time reporting of the balances of the requested material types directly to NMMSS and to coordinate with NMMSS staff resolution of any discrepancies. Subsequently, additional guidance was provided in the NMMSS News Special Edition dated October 2003 (Reference 4) and via an e-mail from Donna Hinton of NAC International to bulletin recipients, dated December 9, 2003. This letter is consistent with this guidance.
Nuclear Management Company, LLC (NMC) reported the last annual inventory for the Monticello Nuclear Generating Plant (MNGP), reporting identification symbol (RIS)-YND, on April 10, 2003, (Reference 2) as required by 10 CFR 74.13(a). NMC contacted NMMSS on November 4, 2003, (Reference 3) to validate the reported quantities of SNM, foreign obligated source material, and other types of Government-owned materials as specified in Bulletin 2003-04 in accordance with the additional guidance of NMMSS News Special Edition (Reference 4). Phone conversations and e-mails between NMC - MNGP and NMMSS clarified the discrepancy between the reported inventory values and the values recorded in the NMMSS database. Three Material Transaction Reports resolving this discrepancy were faxed between NMMSS and NMC - MNGP, signed, and returned to NMMSS on November 17, 2003, (Reference 5) reconciling the reported MNGP inventory values and the NMMSS database. Additionally, as requested, NMC is stating that MNGP has no holdings of Government-owned curium, neptunium, tritium, deuterium, americium, enriched lithium, californium or berkelium. Therefore, NMC has satisfied the intent of the Bulletin 2003-04 for the MNGP, and additional one-time reporting of inventory holdings is not required.
This letter makes no new commitments. If you have any questions please contact Mr.
Daniel Wegener, Principal Engineer (MNGP SNM Custodian), at 763-295-1267 or Mr.
Rick Loeffler, Senior Regulatory Affairs Engineer, at 763-295-1247.
Thomas J. Palmisano Site Vice President, Monticello Nuclear Generating Plant Nuclear Management Company, LLC cc: Administrator, Region III, USNRC Senior Project Manager, Monticello, USNRC Senior Resident Inspector, Monticello, USNRC NMMSS Program Administrator, Nuclear Assurance Corporation International