Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 ML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 ML21285A1082021-10-12012 October 2021 Enclosure 1: St. Lucie Nuclear Plant, Units 1 and 2, Subsequent Licensee Renewal Application, Revision 1 ML21285A1112021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary ML21215A3192021-08-0303 August 2021 Appendix E - Applicant'S Environmental Report for St. Lucie L-2021-192, Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-05-26026 May 2021 Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 L-2020-164, License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2020-12-21021 December 2020 License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2020-020, License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years2020-02-18018 February 2020 License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years L-2019-091, License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2019-10-0909 October 2019 License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2018-161, License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2018-12-20020 December 2018 License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2018-182, License Amendment Request Iodine Removal System Elimination2018-11-0909 November 2018 License Amendment Request Iodine Removal System Elimination L-2018-201, Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-0909 November 2018 Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-147, Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications2018-08-0202 August 2018 Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications L-2018-121, License Amendment Request to Reduce the Number of Control Element Assemblies2018-06-29029 June 2018 License Amendment Request to Reduce the Number of Control Element Assemblies L-2018-120, License Amendment Request to Remove the Site Area Map from the Technical Specifications2018-06-25025 June 2018 License Amendment Request to Remove the Site Area Map from the Technical Specifications L-2018-111, Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-06-0707 June 2018 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-031, License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme2018-01-31031 January 2018 License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme L-2017-155, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2017-12-19019 December 2017 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors L-2017-139, License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply2017-09-14014 September 2017 License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply 2023-06-14
[Table view] Category:Safety Evaluation
MONTHYEARML23219A0032023-09-0101 September 2023 SLRA SER Rev 1 ML23200A1462023-07-21021 July 2023 Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1 and 2 ML22255A1022022-09-21021 September 2022 Authorization and Safety Evaluation for Alternative Relief Request No. 10 - Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality or Safety ML22038A1872022-02-0909 February 2022 Authorization and Safety Evaluation for Relief Request No. 19 (RR19) - the Use of an Alternative to ASME Code Case N-729-6 for Replacement Reactor Vessel Closure Head Penetration Nozzle 85 ML21342A2092022-01-14014 January 2022 Issuance of Amendment Nos. 252 and 207 to Allow Risk-Informed Completion Times (RICT) for the 120-Volt Alternating Current (AC) Instrument Bus Requirements ML21236A1312021-09-30030 September 2021 Authorization of RR 15 Regarding Extension of ASME Requirements Related to Reactor Pressure Vessel Weld Examinations from 10 to 20 Years ML21022A2192021-02-26026 February 2021 Issuance of Amendment No. 206 to Replace the Current Time-Limited Reactor Coolant System Pressure/Temperature Limit Curves and LTOP Setpoints with Curves and Setpoints That Will Remain Effective for 55 Effective Full Power Years ML21027A2262021-02-17017 February 2021 Approval of Alternative to ASME Code, Section XI to Use an Alternative Inservice Inspection Schedule for the Reaction Vessel Closure Head Bolting ML20329A4022021-02-0303 February 2021 Approval of Alternative to Use ASME Code Case N-513-4 for Alternative Repair of Intake Cooling Water System ML20259A2982020-11-18018 November 2020 Issuance of Amendment No. 205 Regarding Modification of the Reactor Coolant Pump Flywheel Inspection Program ML20237F2572020-10-30030 October 2020 Issuance of Amendment Nos. 251 and 204 Regarding Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 Development of Emergency Action Levels for Non-Passive Reactors ML20099A3482020-06-25025 June 2020 Safety Evaluation for Relief Request for Fifth Ten-Year Inservice Inspection (ISI) Interval - Alternative Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds ML20023B3782020-02-19019 February 2020 Safety Evaluation for Relief Request RR-16, Alternate Repair of 2B Boric Acid Makeup Pump Revision for the Fourth 10-Year Inservice Inspection Interval ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19266A0722020-01-27027 January 2020 Issuance of Amendment Nos. 250 and 202 Regarding Technical Specification Changes to Allow the Performance of Selected Emergency Diesel Generator Surveillance Requirements During Power Operation ML19254B5332019-09-30030 September 2019 Safety Evaluation for Relief Request RR#15, Revision 0, Regarding Limited Piping Examinations ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19203A1662019-07-26026 July 2019 Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator ML19115A2812019-05-31031 May 2019 Safety Evaluation for Relief Request No. 6 for the Fifth 10 Year Inservice Inspection Interval ML19058A4922019-04-23023 April 2019 Issuance of Amendment 198 Regarding Technical Specification Changes to Reduce the Number of Control Element Assemblies ML18274A2242018-11-0202 November 2018 Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map ML18256A0982018-10-30030 October 2018 Safety Evaluation for Relief Request No.5 for the Fifth 10-Year Inservice Inspection Interval ML18129A1492018-07-0909 July 2018 Issuance of Amendments Regarding Technical Specification Changes Related to the Auxiliary Feedwater System (CAC Nos. MG0237 and MG0238; EPID L-2017-LLA-0296) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18046A7122018-03-26026 March 2018 Issuance of Amendments Regarding the Unusual Event Fire Related Emergency Action Level Scheme ML18018A0332018-01-26026 January 2018 Safety Evaluation of Relief Requests for the Fifth 10-Year Inservice Testing Program (EPID L-2017-LLR-0113; L-2017-LLR-0017, L-2017-LLR-0018, L-2017-LLR-0119, L-2017-LLR-0120, L-2017-LLR-0121, and L-2017-LLR-0122) ML17334A9362018-01-0404 January 2018 Relief from the Requirements of the ASME Code Regarding Relief Request No. 17, Revision 0, for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9826; EPID L-2017-LLR-0043) ML17341A4422018-01-0404 January 2018 Relief from the Requirements of the ASME Code Relief Request No. 3 for the Fifth 10-Year Inservice Inspection Interval (CAC No. MF9288; EPID L-2017-LLR-0003) ML17257A0152017-10-31031 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to the Reactor Protection System and Limiting Condition for Operation 3.0.5 ML17263A1202017-10-27027 October 2017 Inservice Inspection Plan Fourth 10-Year Interval Relief Request No. 16 (CAC No. MF9827; EPID L-2017-LLR-0044) ML17248A3792017-10-23023 October 2017 Issuance of Amendments to Revise the Renewed Facility Operating Licenses Fire Protection License Conditions (CAC Nos. MF9681 and MF9682; EPID L-2017-LLA-0230) ML17235A5652017-10-0505 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to Component Cyclic or Transient Limits ML17219A1742017-08-31031 August 2017 Relief from the Requirements of the ASME Code Regarding Relief Request 12 for the Fourth 10-Year Inservice Inspection Interval ML17195A2912017-08-14014 August 2017 Issuance of Amendments Regarding Relocation of Radiation Monitor Requirements from Technical Specifications to Licensee-Controlled Documents ML17132A1672017-07-10010 July 2017 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 13 ML17110A2702017-05-10010 May 2017 Inservice Inspection Plan Fourth 10-year Interval Relief Request No. 14 Rev 0 - ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17038A2252017-03-29029 March 2017 Issuance of Amendment No. 188 Regarding Emergency Diesel Generator Day Tank Volume ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16251A1282016-12-0505 December 2016 Issuance of Amendments to Update Appendix B to the Renewed Facility Operating License to Incorporate the 2016 Biological Opinion ML16292A7612016-11-0202 November 2016 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 11 ML16166A4242016-10-0505 October 2016 St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses ML16183A1382016-09-19019 September 2016 Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle ML16210A3742016-08-30030 August 2016 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2 ML16103A3972016-07-28028 July 2016 Issuance of Amendments Regarding Removal of Technical Specification for Cleaning Fuel Oil Storage Tank Sediment and Relocating Procedures to Licensee Controlled Documents ML16167A4732016-07-0505 July 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16139A5882016-05-27027 May 2016 Inservice Inspection Plan Fourth 10-Year Interval Relief Request No. 10, Revision 0 ML16124A3832016-05-25025 May 2016 St. Lucie Plant, Unit No. 1 - Issuance of Amendment Regarding Changes to the Snubber Surveillance Requirements (CAC No. MF6490) ML16063A1212016-04-19019 April 2016 Redacted - Issuance of Amendment Regarding License Amendment Request for the Transitioning to Areva Fuel ML15344A3462016-03-31031 March 2016 Issuance of Amendments Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) (CAC Nos. MF1373 & MF1374) 2023-09-01
[Table view] Category:Technical Specification
MONTHYEARL-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2022-017, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42022-03-0707 March 2022 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-076, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42019-03-28028 March 2019 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-215, Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-30030 November 2018 Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-178, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42018-10-0202 October 2018 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML18096B4482018-04-0606 April 2018 Proposed Technical Specifications L-2017-166, Submittal of Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42017-09-20020 September 2017 Submittal of Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2017-077, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42017-05-0404 May 2017 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2017-041, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process2017-03-30030 March 2017 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process L-2016-227, License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability2016-12-22022 December 2016 License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability L-2016-087, Florida Power & Light Company, on Periodic Report of Changes to the St. Lucie Unit 2 Technical Specification Base2016-04-15015 April 2016 Florida Power & Light Company, on Periodic Report of Changes to the St. Lucie Unit 2 Technical Specification Base L-2016-008, Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle2016-01-19019 January 2016 Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle ML15280A3922015-10-19019 October 2015 Correction to Amendment Nos. 226 and 176 Change to Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program. L-2015-222, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.42015-10-15015 October 2015 Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 L-2015-180, Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR2015-06-30030 June 2015 Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR ML15198A0302015-06-30030 June 2015 St. Lucie, Units 1 and 2 - Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR L-2015-091, St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel2015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel ML15084A0112015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel L-2015-030, Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents2015-03-10010 March 2015 Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents L-2014-230, License Amendment Request Application for Technical Specifications Change to Permanently Extend the Integrated Leak Rate Test (ILRT) Frequency to 15 Years2014-08-26026 August 2014 License Amendment Request Application for Technical Specifications Change to Permanently Extend the Integrated Leak Rate Test (ILRT) Frequency to 15 Years L-2014-205, Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents2014-08-0808 August 2014 Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents L-2014-160, Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C, Using the Consolidated Line Item Improvement Process2014-08-0707 August 2014 Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C, Using the Consolidated Line Item Improvement Process L-2014-124, Technical Specification Bases Control Program Periodic Report of Bases Change TS 6.8.4.j.42014-05-0707 May 2014 Technical Specification Bases Control Program Periodic Report of Bases Change TS 6.8.4.j.4 L-2013-233, Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2014-02-26026 February 2014 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process L-2014-015, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2014-02-20020 February 2014 Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2012-362, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.42012-10-0101 October 2012 Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 L-2012-048, License Amendment Request, Station Battery Surveillance Requirement Changes2012-08-10010 August 2012 License Amendment Request, Station Battery Surveillance Requirement Changes L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups ML1107302982011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups ML1107302842011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages ML1035604272010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups ML1035604282010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups ML1011601922010-04-16016 April 2010 Attachment 4, St. Lucie License Amendment Request Extended Power Uprate, Technical Specifications Bases Markups (for Information Only) L-2010-078, Attachment 4, St. Lucie License Amendment Request Extended Power Uprate, Technical Specifications Bases Markups (for Information Only)2010-04-16016 April 2010 Attachment 4, St. Lucie License Amendment Request Extended Power Uprate, Technical Specifications Bases Markups (for Information Only) L-2009-099, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.42009-04-21021 April 2009 Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 L-2008-120, Proposed License Amendments Diesel Fuel Oil Test Program TSTF-3742008-07-10010 July 2008 Proposed License Amendments Diesel Fuel Oil Test Program TSTF-374 L-2008-149, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42008-06-26026 June 2008 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2007-198, Proposed License Amendment Update PT Curve and LTOP for 55 EFPY2008-01-23023 January 2008 Proposed License Amendment Update PT Curve and LTOP for 55 EFPY L-2007-168, Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42007-10-29029 October 2007 Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML0729808602007-10-22022 October 2007 Tech Spec Pages for Amendments 202 and 149 Regarding Minor Changes and Corrections to the Technical Specifications L-2007-087, Proposed License Amendment, Alternative Source Term and Conforming Amendment2007-07-16016 July 2007 Proposed License Amendment, Alternative Source Term and Conforming Amendment L-2007-028, Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications2007-06-0404 June 2007 Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications L-2006-264, Technical Specification Bases Control Program Periodic Record of Bases Changes TS 6.8.4.j.42006-12-0505 December 2006 Technical Specification Bases Control Program Periodic Record of Bases Changes TS 6.8.4.j.4 2023-09-06
[Table view] Category:Amendment
MONTHYEARL-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-215, Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-30030 November 2018 Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML18096B4482018-04-0606 April 2018 Proposed Technical Specifications L-2016-227, License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability2016-12-22022 December 2016 License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability ML15280A3922015-10-19019 October 2015 Correction to Amendment Nos. 226 and 176 Change to Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program. L-2015-180, Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR2015-06-30030 June 2015 Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR ML15198A0302015-06-30030 June 2015 St. Lucie, Units 1 and 2 - Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR L-2015-091, St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel2015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel ML15084A0112015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel L-2015-030, Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents2015-03-10010 March 2015 Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents L-2014-205, Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents2014-08-0808 August 2014 Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2012-048, License Amendment Request, Station Battery Surveillance Requirement Changes2012-08-10010 August 2012 License Amendment Request, Station Battery Surveillance Requirement Changes ML1107302842011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages ML1035604272010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2008-120, Proposed License Amendments Diesel Fuel Oil Test Program TSTF-3742008-07-10010 July 2008 Proposed License Amendments Diesel Fuel Oil Test Program TSTF-374 L-2007-198, Proposed License Amendment Update PT Curve and LTOP for 55 EFPY2008-01-23023 January 2008 Proposed License Amendment Update PT Curve and LTOP for 55 EFPY ML0729808602007-10-22022 October 2007 Tech Spec Pages for Amendments 202 and 149 Regarding Minor Changes and Corrections to the Technical Specifications L-2007-028, Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications2007-06-0404 June 2007 Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications L-2006-094, Proposed License Amendment Steam Generator Tube Integrity Pursuant to 10 CFR 50.902006-05-25025 May 2006 Proposed License Amendment Steam Generator Tube Integrity Pursuant to 10 CFR 50.90 ML0535703302005-12-23023 December 2005 Tech Spec Pages for Amendment 140 One-Time Type a Test Interval Extension L-2005-029, Proposed License Amendment Containment Leakage Rate Program One-Time Type a Test Interval Extension2005-03-31031 March 2005 Proposed License Amendment Containment Leakage Rate Program One-Time Type a Test Interval Extension L-2004-244, Proposed License Amendment Extension of the Reactor Coolant System Pressure/Temperature Curve Limits and LTOP to 35 EFPY2004-12-20020 December 2004 Proposed License Amendment Extension of the Reactor Coolant System Pressure/Temperature Curve Limits and LTOP to 35 EFPY L-2004-091, Proposed License Amendments Supplement 1 - Request for Additional Information Response Elimination of RPS, Afas and ESFAS Pressure Sensor Response Time Testing Requirements2004-05-18018 May 2004 Proposed License Amendments Supplement 1 - Request for Additional Information Response Elimination of RPS, Afas and ESFAS Pressure Sensor Response Time Testing Requirements ML0407603452004-03-11011 March 2004 Technical Specification Amendment 133 ML0407603392004-03-11011 March 2004 Technical Specification Amendment 189 L-2003-276, Proposed License Amendment, WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit2003-12-0202 December 2003 Proposed License Amendment, WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit L-2003-265, Proposed License Amendments Regarding Elimination of RPS, Afas, and ESFAS Pressure Sensor Response Time Testing Requirements2003-11-21021 November 2003 Proposed License Amendments Regarding Elimination of RPS, Afas, and ESFAS Pressure Sensor Response Time Testing Requirements L-2003-217, Proposed License Amendments Relocation of Pump Technical Specification Surveillance Requirements2003-10-29029 October 2003 Proposed License Amendments Relocation of Pump Technical Specification Surveillance Requirements L-2003-224, Proposed License Amendments Regarding Alternate Source Term and Conforming Amendments2003-09-18018 September 2003 Proposed License Amendments Regarding Alternate Source Term and Conforming Amendments L-2003-136, Application for Amendment to License NPF-16, by Incorporating Technical Specification Revision2003-05-22022 May 2003 Application for Amendment to License NPF-16, by Incorporating Technical Specification Revision L-2002-113, Proposed License Amendments, Engineered Safety Features Actuation Signal (ESFAS) Trip/Bypass Single Failure Vulnerabilities2002-07-18018 July 2002 Proposed License Amendments, Engineered Safety Features Actuation Signal (ESFAS) Trip/Bypass Single Failure Vulnerabilities ML0215505292002-05-30030 May 2002 Tech Spec Pages for Amd Nos. 182 and 125 Relief Value Allowed Outage Time L-2002-003, Proposed Amendments Regarding Relocation of Specific Working Hour Limits and Controls2002-01-18018 January 2002 Proposed Amendments Regarding Relocation of Specific Working Hour Limits and Controls L-76-191, Proposed Amendment to Facility Operating License DPR-67. Proposed Deletion of Applicability of Specification 3.2.3 to Mode 21978-05-11011 May 1978 Proposed Amendment to Facility Operating License DPR-67. Proposed Deletion of Applicability of Specification 3.2.3 to Mode 2 L-78-129, Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Operability and Surveillance of Subject Facility Overpressure Mitigating System1978-04-13013 April 1978 Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Operability and Surveillance of Subject Facility Overpressure Mitigating System ML18088B2741978-04-12012 April 1978 License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Deleting Requirements for Part Length Control Element Assemblies from Unit 1 Technical Specifications L-78-121, License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Supporting Operation of the Containment Spray Additive System Scheduled to Be Installed at Facility1978-04-0505 April 1978 License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Supporting Operation of the Containment Spray Additive System Scheduled to Be Installed at Facility L-78-119, Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Revision to Surveillance Requirement 4.6.6.1.A to Include Testing of Sbvs Auxiliary Heaters1978-04-0404 April 1978 Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Revision to Surveillance Requirement 4.6.6.1.A to Include Testing of Sbvs Auxiliary Heaters L-78-110, License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Revision to Specification on Decay Time for Fuel Assemblies Stored in Modules Nearest the Fuel Cask Compartment1978-04-0404 April 1978 License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Revision to Specification on Decay Time for Fuel Assemblies Stored in Modules Nearest the Fuel Cask Compartment ML18088B2641978-03-20020 March 1978 Proposed Amendment for Operating License DPR-67 to Support the Replacement of Selected Safety-Related Hydraulic During Upcoming Refueling Outage ML18088B2851978-01-0404 January 1978 Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Repositioning Cea'S About Three Inches Different from Their Present Position to Minimize Potential Guide Tube Wear at Single Location L-77-386, Proposed Amendment to Facility Operating License No. DPR-67. Technical Specifications Proposed Change Concerning Modification of Incore Monitoring Alarm Setpoints & Excore Monitoring Power Scaling Factor to Be More Conservative1977-12-19019 December 1977 Proposed Amendment to Facility Operating License No. DPR-67. Technical Specifications Proposed Change Concerning Modification of Incore Monitoring Alarm Setpoints & Excore Monitoring Power Scaling Factor to Be More Conservative L-77-339, Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Deletion of the Requirement for Annual Operating Report1977-11-0101 November 1977 Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Deletion of the Requirement for Annual Operating Report ML18088B3051977-09-16016 September 1977 Attachment C to L-77-291 Proposed Technical Specification Changes L-77-214, Proposed Amendment to Facility Operating License. Relationship Between Linear Heat Rate & Thermal Power in Specification 4.2.1.3.c Is Revised & Rod Bow Penalty Factor in Specification 4.2.1.4.b Is Deleted1977-07-0707 July 1977 Proposed Amendment to Facility Operating License. Relationship Between Linear Heat Rate & Thermal Power in Specification 4.2.1.3.c Is Revised & Rod Bow Penalty Factor in Specification 4.2.1.4.b Is Deleted 2023-12-12
[Table view] |
Text
U.S. NUCLEAA ALGULaTOAY COMMissiON DOCKET NUMBER NRQ FOAM 195 I2.7G)
FILE NUMBER NRC DISTRIBUTION FOB PART 50 DOCI(ET MATERIAL TO: FROM: DATE OF DOCUMENT Mr Stello Florida Power & Light Co 5-20-76 Miami, Fla DATE RECEIVED R E Uhrig
&LETTER jN O TO R IZE D PROP INPUT FORM NUMBER OF. COPIES RECEIVED NORIGINnL NUNCLnssIFiED 3 signed
. OCOPV VESCRIPTIO)V ENCLOSU BE I
Ltr notarized 5-20-76.....tranb the following: Aindt to OL/Change to Tech Specs: 'Consisting of revision to Appendix A Tech Specs with rega'r to safety related hydraulic snubbers...........
(40 cys encl rec'd)
PLANl NAME: St Lucie 0'1 FOR ACTION/INFORMATION 6-7-76 ehf ASSIGNED AD: AQSIGlKD AD:
BRANCH CHTrT': BRANCH CHIEF:
-PRO7ZT hIAIFAGER: Sl v~s PROJECT h'ANAGER:
LlC.--ASST.; LIC. ASST.:
INTERNAL D IST R I BUTTON KG~LE SYSTEhS SAFETY PLA?"r SYST~~IS PIVTFO NRC PDR HEI? Pi IA? l TEDESCO SCHROEDER BE??AROYA OMD QT GOSSICK 8: STAMr ENGI?'IEERING IPPOLITO hlIPC SITE TECH CASE KNIGHT OPERATE?a; ~CARS GA? ":"IILL SIEEHE STELLO STEPP JARLESS PAIFLICKI HUL'IAN OPERATING TECEI T t'JQFAGEhIENT REACTOR SAFETY EISENEIUT SIT" A?IALYSIS ROSS SHAO VOLLIPR P COLLINS NOVAK BUNCH HOUSTON ROSKTOCKY SCH! FENCER J. COLLINS PETERSON GRIhiES hiI'LTZ EIEL'I'E KS AT Ec I SITi SAFETY 5, ENVIRO SKOVHOLT SALTZhIAN ANAIiiiHIS RUTBERG Dl'l't'10' MULLER EXTE RNAL DISTR I 8UTI ON CONTROL NUIKIBER LPDR Ice N '1'L IAB FROOKHAVEiV NATL LAB REG. V-IE . ULR LKSON ORNL LA PDR AQI 13 CONSULTAN'rS ACRS g %68&%88 SENT Nric FORM>>55 I2.7i'I
oD drfgiJ h zowoq sbiaol'< ollo58 'rM sly ,irasiH
()7-V-c) gi alU 3 )f bofI l . C
- grrilaiarrnD
- .ooqB rfooT oI ogrrsrlD5JO oa aber:grriwolla3t orfa aasvs.....dV-OR-P. bozixsaon xaJ ivsgox rid ~w aooqB rioo'f' xibrroqqA oa rrol'aivoz Ro
........... avoddurra oiluswbyrf bodslox yNo%sa a1 (b'oow lono ago 06)
~ P.O. BOX 013100, MIAMI, FLORIDA 33101 gg FLORIDA POWER 5 LIGHT COMPANY
~O g4 ~G.
0gb I May 20, 1976 Oi L-76-207 Qe Ci /
Director of Nuclear Reactor Regulat'ion 10 Attention: Mr. Victor Stello, Directo Division of. Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Stello:
1976~
Re: St. Lucie Unit 1 "' H0qggg REGOLAI0@
COWuSSI011 ggI 5edlo5 Docket No. 50-335.
Proposed Amendment to Facilit 0 eratin License DPR-67 In accordance with 10 CFR 50.30, Florida Power and Light Company submits herewith three (3) signed originals and forty (40) con-formed copies of a request to amend Appendix A of Facility Operating License DPR-67.
This submittal proposes Technical Specification changes relating to the surveillance of safety related hydraulic snubbers at St.
Lucie Unit 1. The proposed changes are as described below and as shown on the accompanying Technical Specification pages bearing the date of this letter in the lower right hand corner.
Pa es 3/4 7-31 throu h 3/4 7-38 (Table 3.7-2)
Table 3.7-2 is revised to include the FPL location number for each snubber listed.
On page 7-33, one Mark No. is corrected by changing MS-548-16A to MS-649-304A (FPL No. 039).
it from On page 7-34, three Mark Nos. are corrected by changing them from:
BF-661-4020 to BF-549-17 (FPL No. 052)
SI-969-6198 to MS-549-11 (FPL No. 061)
SI-970-1248 to MS-549-11 (FPL No. 066)
On page 7-36, four Mark Nos. are corrected by changing them from:
5653 HELPING BUILD FLORIDA
II Director of Nuclear Reactor Regulation Attention: Mr. Victor Stello, Director Page Two May 20, 1976 SI-676-250 to SI-676-2481 (FPL No. 087)
SI-676-2475 to SI-676-247 (FPL No. 110)
SI-V-1 to SI-971-6236 (FPL No. 113)
SI-V-1 to SI-972-6240 (FPL No. 114)
On page 7-37, under the column entitled "ESPECIALLY DIFFICULT TO REMOVE," "No" is changed to "Yes" for FPL No. 095. Also, two Mark Nos. are corrected by changing them from:
CC-14-2 to MS-649-313 (FPL No. 102)
CC-21-5 to BF-549-7 (FPL No. 103)
In addition, Mark Nos. CH-3-54 and CH-3-54A are deleted from the Table because they have been replaced with mechanical snubbers.
On page 7-38, the note at the bottom of the page is revised to permit changes to Table 3.7-2 without prior License Amendment provided the conditions of 10 CFR 50.59 are met and the Table is eventually revised by some future amendment.
The proposed amendment has been reviewed and the conclusion reached that it does not involve a significant hazards consideration, therefore, prenoticing pursuant to 10 CFR 2.105 should not be required. A written safety evaluation is attached.
Very truly yours, Robert E. Uhrig Vice President, REU/
Attachment cc: Mr. Norman C. Moseley Jack R. Newman, Esquire
(6 %PI>P,,"~"..
1
STATE OF FLORXDA )
) ss.
COUNTY OF DADE )
Robert E. Uhrig, being first duly sworn, deposes and says:
That he is a Vice President of Florida Power 6 Light Company, the Licensee herein; That he has executed the foregoing document; that the state-ments made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
Robert E. Uhrig Subscribed and sworn to before me this ~O day of 1976 otary Public, in d for the County of Dade, State of FloridELQTARY PUELIc oF FLoRIDA AT 5TA'fE LAR(jc MY COMMISSION EXPIRES NOV. 30 1979 My commission expires: BONDED THRU GTNERAL INS, UNDERWRITERS
.I r f h C
TABLE 3.7-2 SAFETY RELATED HYDRAULIC SNUBBERS*
FPL LOCATION MARK SNUBBER INSTALLED ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NUMBER NUMBER ON LOCATION AND ELEVATIOH INACCESSIBLE ZONE TO REMOVE
~Aor I7 es or No Yes or Ho
~
001 SS-1 1A MS, Steam Gen. lA, Elev, I Ho Yes 62'A, 002 SS-2 1A MS, Steam Gen. Elev. Yes 62'A, 003 SS-3 1A MS, Steam Gen. Elev. I No 62'A, 004 SS-4 1A MS, Steam Gen. Elev. 62'. I Ho Yes 005 SS-5 1A MS, Steam Gen. 1A, Elev. 62'YSTEM I Ho Yes 62'A, 006 SS-6 1A MS, Steam Gen. Elev. I No Yes 62'A, 007 SS-7 1A MS, Steam Gen. Elev. I Ho Yes 62'A, 008 SS-8 1A MS, Steam Gen. Elev. I No Yes 62'8; 009 SS-1 18 MS, Steam Gen. Elev. I Ho Yes No'es 62'8, 010 SS-2 18 Steam Gen. Elev. I Ho Yes MS, 0
~
62'8, 011 SS-3 18 MS, Steam Gen. Elev. I No res 62'8, 012 . SS-4 18 MS, Steam Gen. Elev. I Ho Yes 62'8, 013 SS-5 18 MS, Steam Gen. Elev. I No Yes 62'8, 014 SS-6 18 MS, Steam Gen. Elev. I No Yes-62'8, 015 SS-7 18. MS, Steam Gen. Elev. I No Yes 62'8, 016 . SS-8 18 MS. Steam Gen; Elev. I Yes
4 CQ-.
I C':
TABLE 3.7-2 SAFETY RELATED HYDRAULIC SNUBBERS" FPL LOCATION SYSTEM SNUBBER INSTALLED ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NUMBER OH LOCATION AHD ELEYATION , INACCESSIBLE ZONE TO REMOVE 017 lhl RC, RCP Motor lhl, Elev. ~
I or I Yes or No Ho Yes or No No
~
57'C, 018 1A2 RCP Motor 1N, Elev. I I No Ho 57'C, 019 1Bl RCP Motor 1B1, Elev. I Ho Ho 57'C,
~ ~
020'21 lB2 RCP Motor 182, Elev. I Ho No 57'C, RC 005-34A Reactor Bldg, Elev. A Ho No 022 RC 005-34B Bldg, Elev. 60'C,-Reactor A Ho No 60'C, 023 RC 005-36 Reactor Bldg, Elev. A No No 60'C, 025 RC 005-12B Reactor Bldg, Elev. Ho Ho 00'C, 02( . RC 005-12B Reactor Bldg, Elev. 80' No Ho 024 RC 005-12A RC, Reactor Bldg, Elev. A No. Ho 80'C, 028 RC 005-55C Reactor Bldg, Elev. A No No 00'RC, 027 RC 005-55B Reactor Bldg, Elev. ~
A ~
No No 00'C,
'29 RC 005-62A Reactor Bldg, Elev. No No 80'C, 030 RC 005-89 ~
Reactor. Bldg, Elev. A No
'C 80'C, 031 005-90 Reactor Bldg, Elev. A No Ho 80'C, 032 RC 005-98 Reactor Bldg, Elev, 80' Ho No
~ TABLE 3.7-2 SAFETY RELATED HYDRAULIC SNUBBERS*
FPL LOCATION MARK SNUBBER INSTALLED ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NUMBER NUMBER OH, LOCATION AHD ELEVATIOH INACCESSIBLE ZONE TO REMOVE A or I Yes or No Yes or Ho 033 034 AS HS 649-319 548-5 HS, Reactor HS, Bldg, Elev.
Elev. 82'eactor=Bldg, 82'.S.
.'. A No No No No
~
035 HS 1076-3164 HS, Trestle; Elev. No No Bldg, Elev. 55'. I No 62'eactor 036 HS 649-314 HS, No 037 HS 649-314 HS, Reactor Bldg, Elev. No No 038 HS 649-310 HS, Bldg, Elev.
40'YSTEM 55'eactor I- No No Bldg, Elev. Yes 50'eactor 039 )MS 649-30%A HS, A Ho
'S Bldg, Elev. I Yes 30'eactor 040 548-9 HS, Ho 041 HS 548-9 Bldg, Elev.
50'eactor
,I No Yes Bldg, Elev. I No 50'eactor 042, BF 549-7 No 043 BF 549-7 BF, Bldg, Elev.
40'eactor I Ho No 044 BF 549-8 BF, Bldg, Elev.
40'eactor I Ho Yes 045 BF 549-11 Bldg, Elev.
40'eactor I No No Bldg, Elev. I Ho 50'eactor 046 BF 549-11 BF, No 047 Bf 549-17 BF, Bldg, Elev.
50'eactor A H4 Yes
'F Bf, Bldg, Elev. I No 36'eactor 048 661-407 No 049 BF 661-407 : BF, Bldg, Elev.
40'eactor I No No
TABLE 3.7-2 SAFETY RELATED HYDRAULIC SNUBBERS*
FPL LOCATION MARK . SYSTEM SNUBBER INSTALLED ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFFICULT NUMBER NUMBER OH, LOCATION AND ELEYATIOH. INACCESSIBLE ZONE TO REMOVE A or I Yes or No Yes or Ho 050 BF 661-416 BF, Reactor Bldg, Elev, 50'. No 051 BF 661-416 BF, Reactor Bldg, Elev, No Ho 50'lev.
052 BF 549-17 BF, Reactor Bldg, No Ho 36'lev.
SI 968-210 SI, Reactor Bldg, Ho Ho 053 16'l 054 SI 968-565 SI, Reactor Bldg, ev. Ho
~ .
25'lev.
055 SI 968-1205 SI, Reactor Bldg, Ho No 30'lev.
056 SI 968-1207 SI, Reactor Bldg, No Ho 18'lev.
057 SI 969-1190 SI, Reactor Bldg, No Ho 20'lev.
058 SI 969-1216 SI, Reactor Bldg, Ho Ho 20'o 18'lev.
, SI 969-6193 SI, Reactor Bldg, No No 059'60 18'lev.
SI 969-6195 SI, Reactor Bldg, No Ho 18'lev.
549-11 SI, Reactor Bldg, No No 061 062 MS SI 969-6201 SI, Reactor Bldg, 18'lev.
'o No 18'lev.
063 SI 969-6217 SI, Reactor Bldg, Ho No 18'lev.
SI 969-6217 SI, Reactor Bldg, Hd Ho 064 065 SI 970-1210 SI, Reactor Bldg, 18'lev.
No No.
."O i ~
33'lev.
066 VMS 549-11 SI, Reactor Bldg, No Ho 1.
CQ 0
TABLE 3.7-2 SAFETY RELATED HYDRAULIC SHUBBERS*
H FPL LOCATION MARK SNUBBER INSTALLED ACCESSIBLE OR 'SPECIALLY HIGH RADIATION DIFFICULT'O NUMBER NUMBER ON LOCATION AND ELEVATION INACCESSIBLE ZONE REMOVE Aor I Yes or No Yes or No 067 SI 970-1251 SI, Reactor Bldg, Elev.
068'69 SI 971-6 SI, Reactor Bldg, 20'lev.
'I Ho Ho No No
~
SI 97l-1229 SI, Reactor'ldg, I 20'lev.
18'YSTEM No 070 SI 971-6229 SI, I 20'lev.
Reactor Bldg, Ho SI 971-6236 SI; I 20'lev.
071 Reactor Bldg, Ho C
072 SI, 20'lev.
SI 972-1243 Reactor Bldg, No Ho 073 SI 972-6240 SI, 25'lev.
I Reactor Bldg, Ho Ho Ln SI 973-240 SI, 16'lev.
074 Reactor Bldg, No SI 973-6219 SI, 18'lev.
075 Reactor Bldg, Ho SI 973-6224 SI, 36'lev.
076'77 Reactor Bldg, A No No SI 868-64 SI, RAB, Elev. No 078 SI 868-111 RAB, Elev. 4' 4'I, A No No ~/
079 S I 868-l 63 I, RM, El ev. A =
Ho Ho 4'I, 080 SI 868-410 RAB, El ev. No Ho 4'I, I~
081 SI,676-67 RM, Elev. Ho No 4'I, 082 SI 676-67 RAB, El ev. -A .No No RAB, Elev. 4' 4'i, 083 SI 676-105 Ho. No
~ ll~
TABLE 3.7-2 SAFETY RELATED HYDRAULIC SNUBBERS*
FPL LOCATION MARK SYSTEM SNUBBER INSTALLED OR HIGH RADIATION ESPECIALLY DIFFICULT NUMBER NUMBER ON LOCATION AHD ELEVATIOH INACCESSIBLE ZOHE TO REMOVE Aor I Yes or No Yes or Ho 084 SI 676-105 SI, RM, Elev. A No . Ho 4'I, l
085 SI 676-127 RAB, Elev. A Ho Ho 4'I, 086 SI 676-129 RM, Elev. A Ho No 4'I, 087 SI 676-2481 RAB, Elev. 24' 125'CCESSIBLE A No No 110 'SI 676-247 I, RAB, El ev. A Ho Ho 30'I, 111 SI 676-2475A RAB, El ev. A No No 30'I, 112 SI 676-4505 RAB, Elev. A No No 7'I, 113 SI 971-6236 RAB, Elev. A . No Ho sI 'No 4'I, 114 972-6240 RAB, Elev. A No 091 SPS-417 Spray, Reactor 4'ressurizer Bldg, Elev, No 090 SPS-27 Spray, Reactor 50'ressurizer Bldg, Elev, No No 092 SPS 467 Spray, Reactor 50'ressurizer Bldg, Elev. Ho 093 SPS-777 Spray, Reactor 80'ressurizer Cn Bldg, Elev. A No No 80'S,
~O 094 CS-832-118 Reactor Bldg, Elev. A No Yes
,U' 1.
~ y
- r CQ . ~
r A
H TABLE 3.7-2 aH SAFETY RELATED HYDRAULIC SHUBBERS*
i FPL LOCATION MARK SYSTEM SHUBBER INSTALLED ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFF I CULT NUMBER NUMBER ON, LOCATIOH AND ELEVATION INACCESSIBLE ZONE TO REMOVE
~o or I es or o Yes or No 095 CS-878-115 CS, Reactor Bldg, Elev. 18'C, A Yes 096 CC-1865-9 Reactor Bldg, Elev. A No No 25'C, 088 CC-1899-48 Reactor Bldg, Elev. A No 25'C, 098. CC-1899-2208 Reactor Bldg, Elev. Ho Ho 59'C, P ~ 089 CC-1852-6241 Reactor Bldg, Elev. 25' A No V 4~
100 CC-1865-2207 CC, Reactor Bldg, Elev. 59' A No 101 CC-17-1 CC, RAB, Elev. A Ho Ho
, I,
- MS-649-313 20'.'CC, 102 RAB, Elev. A No No 26'C, 104 CC-21-1 RAB, Elev. A Ho Ho 20'CC, 103 'BF-549-7 RAB, Elev. A Ho 26'C, 105 CC-23-2 RAB, Elev. A Ho-26'CH,
~ t 106 CH-3-40 RAB, Elev. 34' A Ho Ho 107 CH-3-75 CH, RAB, E)ev. 23' No Ho P
4 C
i 1
TABLE 3.7-2 SAFETY RELATED HYDRAULIC SNUBBERS*
FPL LOCATION MARK : SYSTEM SNUBBER INSTAI LED ACCESSIBLE OR HIGH RADIATION ESPECIALLY DIFF NUMBER NUMBER ON LOCATION AND ELEVATION INACCESSIBLE ZONE TO REMOVE A or I Yes or No Yes or o 108 MS-649-3l3 ,MS, Reactor Bldg, Elev. I No No 80'MS, 109 MS-649-313 Reactor Bldg, Elev.'0'S, I No No 097 MS-649-314 Reactor Bldg, Elev.
80'S, I No No 099 MS-649'-314 Reactor Bldg, Elev. 80' No No
- Changes to Table 3.7-2 may b'e made without prior License Amendment provided that safety evaluations, documentation, .and reporting- are provided in accordance with 10 CFR 50.59 add that a revision .to Table 3.7-2 is included with a subsequent License Amendment request.
4
~'
SAFETY EVALUATION Introduction This evaluation supports a proposed amendment to Table 3.7-2, "Safety Related Hydraulic Snubbers," such that changes to the table may be made without prior License Amendment provided safety evaluations, documentation, and reporting are performed in accordance with 10 CFR 50.59.
Discussion The present St. Lucie Unit 1 Technical Specifications allow hydraulic snubbers to be added to safety related systems without prior License Amendment. but say nothing about the possibility of replacing safety related hydraulic snubbers with some other type of seismic restraint.
Florida Power and Light Company (FPL) proposes that the specifica-tions be amended as described in the Introduction to this Safety Evaluation so that mechanical snubbers may be used on safety related systems to replace defective hydraulic snubbers without.
first having to obtain permission to do so via a change to Table 3.7-2. Any replacement mechanical snubber will be properly qualified. Safety evaluations, documentation, and reporting will be provided in accordance with 10 CFR 50.59.
The proposed change will provide increased flexibility in ordering spare parts for seismic restraints. It will also permit correction of deficiencies more quickly by authorizing the use of qualified replacement snubbers without having to go through the, more time-consuming license amendment, process.
Conclusion Based on these considerations, (1) the proposed change does not increase the probability or consequences of accidents or mal-functions of equipment important to safety and does not reduce the margin of safety as defined in the basis for any technical specification, therefore, the change does not. involve a significant hazards consideration, (2) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (3) such activities will be conducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.