L-2025-031, Inservice Inspection Program Owners Activity Report (OAR-1)
| ML25052A092 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/21/2025 |
| From: | Mack K Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| L-2025-031 | |
| Download: ML25052A092 (1) | |
Text
February 21, 2025 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555-00001 RE:
Turkey Point Unit 3 Docket No. 50-250 Renewed Facility Operating Licenses DPR-31 and DPR-41 lnservice Inspection Program Owner's Activity Report (OAR-1)
L-2025-031 10 CFR 50.55a Attached find the Owner's Activity Report (Form OAR-1), for Turkey Point Unit 3 (PTN 3R34) Fifth lnservice Inspection Interval Extended, Third Period, Second Refueling Outage, Sixth lnservice Inspection Interval, First Period, First Outage (PTN 3-34) and IWE Third Interval, Second Period, Third Outage. The Form OAR-1, Owner's Activity Report, implements Code Cases N-532-5, N-722-1 and N-892.
This letter contains no new or revised regulatory commitments.
Should you have any questions regarding this submission, please contact Ms. Maribel Valdez, Fleet Licensing Manager, at 561-904-5164.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the 21th day of February 2025, Sincerely, Director, Licensing and Regulatory Compliance Florida Power & Light Company Enclosure cc:
USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant, Units 3 and 4 USNRC Senior Resident Inspector, Turkey Point Nuclear Plant, Units 3 and 4 Mr. Clark Eldredge, Florida Department of Health Florida Power & Light Company 9760 S.W. 344 t Street Homestead, FL 33035
Turkey Point Nuclear Plant, Unit 3 Docket No. 50-250 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISi PTN3R34 Fall 2024 Plant:
Turkey Point Nuclear Power Plant Unit 3 9760 SW 344th Street Homestead, Florida 33035 L-2025-031 Enclosure Page 1 of 9 Unit No: -2_
Commercial Service Date: December 14, 1972 Refueling Outage No.: PTN3R34 Applicable Inspection Interval: ISi Sixth Interval February 22, 2024, to February 21, 2034 ISi Fifth Interval February 22, 2014, to February 21, 2024 (extended to 2025)
IWE Third Interval July15, 2018, to July 14, 2028 Applicable Current Inspection Period: ISi First Period February 22, 2024, to February 21, 2027 ISi Third Period February 22, 2021, to February 21, 2024 (extended to 2025)
IWE Second Period July 15, 2021, to July 14, 2025 Edition and Addenda of Section XI applicable to the inspection plans: ISi Sixth Interval 2019 Edition, Fifth lnterval-2007 Edition through the 2008 Addenda and IWE Third lnterval-2007 Edition through the 2008 Addenda.
Date and Revision of Inspection Plans: ISi Sixth Interval (February 22, 2024, Rev.O)
ISi Fifth Interval (July 28, 2023, Rev.3)
IWE Third Interval (July 15, 2018. Rev.O)
Edition and Addenda of Section XI applicable to repair and replacement activities. if different than the inspection plans: Same Code Cases Used for Inspection and Evaluation: N-532-5, N-722-1. N-892
Turkey Point Nuclear Plant, Unit 3 Docket No. 50-250 FORM OAR-1 OWNER'S ACTIVITY REPORT CERTIFICATE OF CONFORMANCE L-2025-031 Enclosure Page 2 of 9 I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of PTN3-34 conform to the requirements of Section XI.
Signed~,~
Site Program Manager Owner or Owner's Designee, Title Date t:,n... h "* f.U>?./S i,
I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut, have inspected the items described in this Owner's Activity Report and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage, or loss of any kind arising from or connected with this inspection.
~--~&-.,,,.~~~--------- Commissions -----'--N=B~1~5~6~4=8.... 1,_N'-'-'-R....__ ____ _
Inspector's Signature National Board Number and Endorsement Date 2/19/2025
Turkey Point Nuclear Plant, Unit 3 Docket No. 50-250 L-2025-031 Enclosure Page 3 of 9 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number E-A E1.11 Item Description Liner Evaluation Description AR02500998 Description Identified Boric acid was observed on the Reactor Sump liner walls.
The conditions observed, while rejectable, did not appear as fresh active boric acid and exhibited no apparent significant change from the previous observation.
Evaluation The quarter-inch thick plate had no signs of pitting or wastage, the liner has maintained complete integrity as per the original design.
These areas are a source of borated water in the reactor pit area from the upper past cavity seal ring and floor when the cavity is flooded.
There are currently no indications /conditions that would appear to challenge the containment structural integrity of the structural integrity/leak tightness of the containment liner boundary during Modes 1-4 Conclusion WO 40801001-01 has been created to clean and coat deficient locations as required. This shall be implemented during PTN3-35 Refueling Outage.
Turkey Point Nuclear Plant, Unit 3 Docket No. 50-250 L-2025-031 Enclosure Page 4 of 9 F-A FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description F1.10 Evaluation Description AR02499979 Description Identified While performing a scheduled ASME Section XI examination on eves support 422-A, gap clearances were observed to be out of tolerance. The maximum as-found Lateral Combined Gap was measured at O" on one side and 1/8" on the opposite side. The design drawing specifies 1 /16" gap on both sides.
Evaluation Support 422-A allows for movement in the Z (South-North) direction. The configuration of the piping system allows for sufficient flexibility to minimize stresses resulting from thermal movement and is therefore acceptable.
Conclusion Support 422-A is acceptable as-is.
Support drawing 5613-H-644 Sht. 13B will to be revised to match the as-found field conditions.
RWA 02499979-02 has been generated to track the completion of an EC that tracks the update of support drawings including Support Drawing 5613-H-644 Sht. 13B for Support 422-A.
Turkey Point Nuclear Plant, Unit 3 Docket No. 50-250 L-2025-031 Enclosure Page 5 of 9 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number 1/A RV-3-551A Replace Relief Valve 12/05/2024 RR40880611-01 1/A RV-3-551B Replace Relief Valve 12/05/2024 RR40880612-01 1/A RV-3-551C Replace Relief Valve 11/25/2024 RR40880613-01 1/A 3E202 Plugging Hx Tube 10/30/2024 RR408657 40-07 1/A RV-3-304 Overhaul Spare Relief 10/30/2024 RR40880469-02 Valve Remove Relief Valve 1/A R0-3-304 and add a bypass flow 02/13/2025 RR40697523-01/02 path Overhaul valve and 1/A PCV-3-456 replace bonnet 01/30/2025 RR40881872-01 bolting/nuts Replace RCP pump 1/A 3P200A rotating assembly and 01/30/2025 RR40966512-01 studs and nuts
Turkey Point Nuclear Plant, Unit 3 Docket No. 50-250 L-2025-031 Enclosure Page 6 of 9 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number Repair of gasket 1/A 3P200A sealing surface 01/30/2025 RR40966512-17 between the Thermal Barrier to Pump Casing 1/A SN-3-1069 Replace snubber 11/06/2024 RR40880608-15 1/A 3P200A Install supports for 3A 11/09/2024 RR40966512-20 (IWF) support lines RCP interference lines 2/B MOV-3-856B Replace valve's bolting 02/05/2025 RR40975133-01 Replace nuts on 2/B 3S10 Equipment Hatch Door 01/30/2025 RR40887929-01 (PEN-40) 2/B RV-3-1406 Replace Relief Valve 12/05/2024 RR40881069-20 2/B RV-3-1407 Replace Relief Valve 11/25/2024 RR40858299-01 2/B RV-3-1408 Replace Relief Valve 11/21/2024 RR40858317-01 2/B RV-3-1410 Replace Relief Valve 11/21/2024 RR40881069-23
Turkey Point Nuclear Plant, Unit 3 Docket No. 50-250 L-2025-031 Enclosure Page 7 of 9 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number 2/B RV-3-1411 Replace Relief Valve 11/21/2024 RR40881069-26 2/B RV-3-1412 Replace Relief Valve 11/21/2024 RR40858294-01 2/B SN-3-1015 Replace snubber and 11/06/2024 RR40880608-05 load pins 2/B SN-3-1016 Re~acesnubberand 11/06/2024 RR40880608-06 load pins 2/B SN-3-1017 Replace snubber and 11/06/2024 RR40880608-07 load pins 2/B SN-3-1021 Replace snubber 11/06/2024 RR40880608-08 2/B SN-3-1022 Replace snubber and 11/06/2024 RR40880608-09 load pins 2/B SN-3-1023 Replace snubber and 11/06/2024 RR40880608-1 0 load pins 2/B SN-3-1035 Replace snubber 11/06/2024 RR40880608-11
Turkey Point Nuclear Plant, Unit 3 Docket No. 50-250 L-2025-031 Enclosure Page 8 of 9 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number 2/B SN-3-1038 Replace snubber and 11/06/2024 RR40880608-12 load pins 2/B SN-3-1079 Replace snubber and 11/06/2024 RR40880608-16 load pins 2/B SGB-3-074 Replace modified (78101 B-H-02/10/2025 RR40997094-08 (IWF) 322-02) support per EC300202 3/C POV-3-4882 Replace bolting on 01/16/2024 RR40954658-10 valve flange 3/C 3P9C Replace 3C (3P9C) 02/05/2024 RR40792866-09 ICWPump 3/C 3P9C Upgrade Pump Base 07/22/2024 RR40882468-01 and Hold Down Bolts 3/C 3P9A Replace 3A (3P9A) 08/22/2024 RR40905595-09 ICWPump Replace 3-50-311 3/C 3-50-311 Expansion Joint for 08/22/2024 RR40905595-13 (3P9A) ICW Pump 3/C 3P9B Upgrade Pump Base 08/27/2024 RR408824 76-01 and Hold Down Bolts
Turkey Point Nuclear Plant, Unit 3 Docket No. 50-250 L-2025-031 Enclosure Page 9 of 9 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number 3/C 3P9B Replace 38 (3P9B) 08/27/2024 RR40969572-01 ICWPump 3/C P254 Replace CCW 11/25/2024 RR40997148-01 supplemental cooling pump 3/C 3-50-307 Replace Valve and 01/30/2025 RR40820855-01 Bolting 3/C 3-30-313 Replace pipe strap 02/06/2025 RR40880325-01 saddle (bottom side) upstream valve 3/C SN-3-1013 Replace snubber and 11/06/2024 RR40880608-04 load pins 3/C SN-3-1105 Replace snubber 11/06/2024 RR40880608-17 MC PEN 39 Replace studs to the (IWE)
Transfer Canal transfer canal flange 11/21/2024 RR40880599-04 Flange (S209) at PEN 39