L-2023-054, Submittal of Periodic Reports

From kanterella
(Redirected from L-2023-054)
Jump to navigation Jump to search
Submittal of Periodic Reports
ML23102A150
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/12/2023
From: Strand D
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-2023-054
Download: ML23102A150 (1)


Text

cc: Florida General Dianne Sincerely, Executed I declare Manager, If you AOR the transient, impact As (Reference 50.46 performed Certification Annual 3 is reaffirmed. six & Semi-Annual 10 described months. 7 COLs USNRC USNRC USNRC have PCT CFR peak annual Power Manager, Strand on under at the 10 12 319-851-any margin 50.46(6)(1) Best cladding in 4). report by Document CFR Because Section Senior PTN Regional & th penalty questions, the Westinghouse Update Llght Regulatory day allocations Estimate 50.46 2.D.(11),

Resident 6 & of 7032. temperature Reference for there 7 Project Administrator, Company April of acceptance the (DCD) Report of perjury or Large AP1000 are the Inspector, Affairs 2023. need and 4 letter, Electric no the Operational Manager, that their Break (PCT) Revision -The changes schedule additional criterion Corporation Region the bases there Design PTN Turkey foregoing Loss-of-Coolant for 19, to for NRR/DNRL information, is provided of the are Certification and 6 & FPL's implementation Programs II 2200°F. 2022 no Point new (\\v'EC). thus 7 COLs construction is true model also Nuclear The emergency Implementation and please in Accident, Analysis Accordingly, the incorporate Attachment summary year. of Plant correct. peak decision, operational contact The core of of remains Record fuel by Michael 1 of the estimated cooling the cladding reference Schedule

\\v'EC the programs the AP1000 at (AOR) schedule Reference 2010°F PCT system Davis, 2022 temperature AP1000 -Pursuant Design and for applies provided is Licensing the model Model to 4 letter. Certification does to Design be limiting changes PTN Year calculations updated to not in the Projects exceed 6 & 10 Reference PTN Page L-2023-054 that CFR every 2 of2 7 6