L-2022-167, Submittal of Periodic Reports

From kanterella
(Redirected from L-2022-167)
Jump to navigation Jump to search
Submittal of Periodic Reports
ML22286A052
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/13/2022
From: Dean Curtland
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2022-167
Download: ML22286A052 (2)


Text

Florida Power & Light Company 15430 Endeavor Drive, Jupiter, Florida 33478 October 13, 2022 L-2022-167 10CFR 52.3 10CFR 50.59 10 CFR 52.97(c) 10CFR 52 Appendix D, X.B U.S. Nuclear Regulatory Commission Attention: Document Control Desk 11545 Rockville Pike One White Flint North Rockville, MD 20852-2746 Turkey Point Units 6 and 7 Dockets52-040 and 52-041 Combined License Nos. NPF-104 and NPF-105 SUBMISSION OF PERIODIC REPORTS

References:

1. FPL Letter L-2022-053 dated April 13, 2022, Submission of Periodic Reports (ADAMS Accession No. ML22103A033)
2. FPL Letter L-2019-074 dated April 9, 2019, License Conditions 2.D.(11) Schedules - Initial Submittal
3. FPL Letter L-2019-176 dated September 25, 2019, Tier 1 and Updated Final Safety Analysis Report Annual Submittal The purpose of this letter is to submit periodic reports for Turkey Point Units 6 & 7 (PTN 6 & 7) as required by NRC regulations and/or license conditions as a Part 52 combined license (COL) holder. The following reports are addressed by this letter, updated from the previous reporting period (References 1 and 3):

Semi-Annual Departures Report Semi-Annual Changes, Tests, and Experiments Report Semi-Annual Update of the Operational Programs Implementation Schedule Annual Update of the Tier 1 Material and Updated Final Safety Analysis Report (UFSAR)

Semi-Annual Departures Report and Semi-Annual Changes, Tests, and Experiments Report - For PTN 6 & 7, in accordance with the requirements of 10 CFR 50.59(d)(2) and 10 CFR 52, Appendix D, paragraphs X.B.1 and X.B.3.b, during the period April 1, 2022 through September 30, 2022:

No changes, tests or experiments were implemented pursuant to 10 CFR 50.59(c).

No plant-specific departures were implemented under 10 CFR 52, Appendix D, Section VIII.

Semi-Annual Update of the Operational Programs Implementation Schedule - Pursuant to the PTN 6

& 7 COLs Section 2.D.(11), the schedule for implementation of operational programs is to be updated every

Document Control Desk L-2022-167 Page 2 six months. Because there are no changes to FPLs construction decision, the schedule provided in Reference 2 is reaffirmed.

Annual Update of the Tier 1 Material and UFSAR - For PTN 6 & 7, in accordance with the requirements of 10 CFR 52, Appendix D, paragraphs X.B.2 and X.B.3.b, during the period of September 1, 2021 through August 31, 2022:

No changes were implemented to the Tier 1 Material and UFSAR.

Therefore, the previously submitted Tier 1 Material and UFSAR (Enclosures 1 and 2 of Reference 3) remain applicable.

If you have any questions, or need additional information, please contact me at 561-803-7900.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the 13th day of October 2022.

Sincerely, Dean Curtland Vice President, Nuclear Florida Power & Light Company cc:

USNRC Regional Administrator, Region II USNRC PTN 6 & 7 Project Manager, NRR/DNRL USNRC Senior Resident Inspector, Turkey Point Nuclear Plant