MONTHYEARL-2024-044, Revised Steam Generator Tube Inspection Reports2024-03-19019 March 2024 Revised Steam Generator Tube Inspection Reports L-2024-007, Inservice Inspection Program Owners Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-115, Inservice Inspection Program Owners Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owners Activity Report (OAR-1) L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owners Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owners Activity Report (OAR-1) L-2022-035, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II2022-03-10010 March 2022 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II L-2022-027, Inservice Inspection Program Owners Activity Report (OAR-1)2022-02-17017 February 2022 Inservice Inspection Program Owners Activity Report (OAR-1) L-2021-183, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 102021-09-30030 September 2021 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 L-2021-042, Inservice Inspection Program Owner'S Activity Report (OAR-1)2021-02-15015 February 2021 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2020-126, ln-Service Inspection Program Owner'S Activity Report (OAR-1)2020-07-24024 July 2020 ln-Service Inspection Program Owner'S Activity Report (OAR-1) L-2020-074, Response to Request for Additional Information for Relief Request No. 62020-04-15015 April 2020 Response to Request for Additional Information for Relief Request No. 6 L-2020-056, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 62020-03-30030 March 2020 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 6 L-2019-175, Steam Generator Tube Inspection Report2019-09-25025 September 2019 Steam Generator Tube Inspection Report ML19189A3532019-07-0808 July 2019 Inservice Inspection Program: Owner'S Activity Report (OAR-1) L-2019-018, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-1)2019-02-0707 February 2019 Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2018-232, Metamic Inservice Surveillance Campaign Summary Report2018-12-13013 December 2018 Metamic Inservice Surveillance Campaign Summary Report L-2017-132, Inservice Inspection Program Owner'S Activity Reports2017-07-20020 July 2017 Inservice Inspection Program Owner'S Activity Reports L-2016-138, Inservice Inspection Program Owner'S Activity Report for Fifth Inservice Inspection Interval2016-07-12012 July 2016 Inservice Inspection Program Owner'S Activity Report for Fifth Inservice Inspection Interval L-2016-139, Fifth 10-Year Interval Inservice Testing Program Plan2016-07-0606 July 2016 Fifth 10-Year Interval Inservice Testing Program Plan L-2016-044, Inservice Inspection Program Owner'S Activity Report2016-02-26026 February 2016 Inservice Inspection Program Owner'S Activity Report L-2015-223, Fifth Ten-Year Interval Inservice Testing (IST) Program Relief Request No. PR-01-Resubmittal2015-09-25025 September 2015 Fifth Ten-Year Interval Inservice Testing (IST) Program Relief Request No. PR-01-Resubmittal L-2015-101, Submittal of Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 32015-06-0808 June 2015 Submittal of Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 3 L-2015-098, Fifth Ten-Year Interval Inservice Testing (IST) Program, Relief Request No. PR-012015-05-12012 May 2015 Fifth Ten-Year Interval Inservice Testing (IST) Program, Relief Request No. PR-01 L-2015-040, Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan2015-03-11011 March 2015 Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan ML15077A2142015-03-0202 March 2015 Inservice Inspection Plan - Fifth Inspection Interval, Relief Request No. 1, Revision 1 L-2015-020, Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 172015-02-13013 February 2015 Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 17 L-2015-012, Inservice Inspection Program Owner'S Activity Report (OAR-1)2015-01-16016 January 2015 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2014-105, Inservice Inspection Plan - Fifth Inspection Interval, Unit 3 Relief Request No. 1 - Response to Follow-up Request for Additional Information2014-04-14014 April 2014 Inservice Inspection Plan - Fifth Inspection Interval, Unit 3 Relief Request No. 1 - Response to Follow-up Request for Additional Information L-2014-096, Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 12014-04-0404 April 2014 Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 1 L-2014-040, Letter Regarding Inservice Testing Program-Extension of Interval for Turkey Point, Units 3 and 42014-02-13013 February 2014 Letter Regarding Inservice Testing Program-Extension of Interval for Turkey Point, Units 3 and 4 L-2013-113, Inservice Inspection Plan Submittal of Relief Request No. 122013-05-24024 May 2013 Inservice Inspection Plan Submittal of Relief Request No. 12 L-2012-435, Inservice Inspection Program Fourth Interval-Third Period-First Refueling Outage Owner'S Activity Report (OAR-1)2012-12-0303 December 2012 Inservice Inspection Program Fourth Interval-Third Period-First Refueling Outage Owner'S Activity Report (OAR-1) L-2012-214, License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program2012-05-16016 May 2012 License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program ML11361A3812012-01-27027 January 2012 Summary of the Staff'S Review of the Steam Generator Tube Inservice Inspection Refueling Outage 25 L-2011-254, Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1)2011-08-0505 August 2011 Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1) L-2011-119, Submittal of Steam Generator Tube Inspection Report2011-04-19019 April 2011 Submittal of Steam Generator Tube Inspection Report L-2011-042, Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1)2011-02-0707 February 2011 Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1) L-2010-250, Fourth Inservice Inspection Interval, Relief Request No. 9, Visual Examination of Containment Liner Repair2010-10-27027 October 2010 Fourth Inservice Inspection Interval, Relief Request No. 9, Visual Examination of Containment Liner Repair L-2010-042, Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1)2010-02-26026 February 2010 Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1) L-2009-167, Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1)2009-08-0606 August 2009 Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1) L-2008-003, Inservice Inspection Report2008-01-10010 January 2008 Inservice Inspection Report L-2007-036, Inservice Inspection Report2007-03-0808 March 2007 Inservice Inspection Report L-2006-158, Inservice Inspection Record2006-06-28028 June 2006 Inservice Inspection Record L-2006-062, Response to Request for Additional Information Regarding Steam Generator Tube Plugging Inservice Inspection Report2006-02-27027 February 2006 Response to Request for Additional Information Regarding Steam Generator Tube Plugging Inservice Inspection Report L-2005-190, 2005 Inservice Inspection Report2005-09-0808 September 2005 2005 Inservice Inspection Report L-2005-137, Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report2005-06-17017 June 2005 Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report L-2005-046, Refueling Outage Summary of Inservice Inspection Examinations.2005-02-15015 February 2005 Refueling Outage Summary of Inservice Inspection Examinations. L-2004-217, Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report2004-10-12012 October 2004 Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report L-2004-046, Inservice Inspection (ISI) Program Missing Pages from Fpl'S Letter L-2004-046, Dated March 11, 20042004-04-29029 April 2004 Inservice Inspection (ISI) Program Missing Pages from Fpl'S Letter L-2004-046, Dated March 11, 2004 L-2004-043, Submittal of Fourth 10-year Testing Interval IST Program, Revision 0, Beginning February 22, 2004 for Turkey Point Unit 3 and April 15, 2004 for Turkey Point Unit 42004-03-11011 March 2004 Submittal of Fourth 10-year Testing Interval IST Program, Revision 0, Beginning February 22, 2004 for Turkey Point Unit 3 and April 15, 2004 for Turkey Point Unit 4 2024-03-19
[Table view] Category:Letter type:L
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-044, Revised Steam Generator Tube Inspection Reports2024-03-19019 March 2024 Revised Steam Generator Tube Inspection Reports L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-014, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-025, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-02-22022 February 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-008, Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2024-02-0909 February 2024 Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owners Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owners Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update 2024-09-25
[Table view] |
Text
March 30, 2020 L-2020-056 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Re: Turkey Point Unit 3 Docket Nos. 50-250 Subsequent Renewed License No. DPR-31 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 6 Pursuant to 10 CFR 50.55a(z)(2), Florida Power & Light Company (FPL) requests the Nuclear Regulatory Commission (NRC) for relief from the applicable American Society of Mechanical EngineersSection XI Code (ASME Code) requirements for the repair/replacement activity identified in this request. This relief requests to repair certain sections of the degraded Unit 3 Component Cooling Water supply and return piping by installing a welded proprietary repair device, PMCap Restoration Method - US Patent 6,860,297to these moderate energy Class 3 pressure boundary piping with new pressure boundary material without removing the sections of degraded piping. The basis for the relief is that compliance with the specified ASME Code repairs would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The details of the Turkey Point Unit 3 Relief Request No. 6 are enclosed herein.
As discussed during the March 24, 2020 telephone with NRCs Ms. Eva Brown, the extent of degradation due to corrosion is unknown at this time. The degraded area of piping will be characterized using NDE techniques during the Turkey Point Unit 3 refueling outage, which started on March 30, 2020. The attached relief request includes two potential options that represent the worst possible degraded piping conditions classified as:
- 1. Option 1: If a through-wall leak is discovered.
- 2. Option 2: If a thinning beyond code allowable minimum is discovered.
In addition, per our discussion on March 24, 2020, due to the unknown circumstances surrounding this relief request, FPL is requesting approval of these options, as applicable and as needed, prior to Mode 2, after the Unit 3 refueling outage.
It should be noted, that upon discovery of the actual conditions of the degraded piping, FPL will promptly provide supplemental information with sufficient details to support NRCs review and approval of this relief request.
Florida Power & Light Company 9760 S.W. 344th Street Homestead, FL 33035
L-2020-056 Page 2 If you have any questions or require additional information, please contact Robert J. Hess, Licensing Manager, at (305) 246-4112.
Sincerely,
/Signature on file/
Robert J. Hess Licensing Manager Turkey Point Nuclear Plant Enclosure Attachment cc: USNRC Regional Administrator, Region II, USNRC USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant USNRC Project Manager, Turkey Point Nuclear Plant
L-2020-056 Enclosure TURKEY POINT UNIT 3 RELIEF REQUEST No. 6
Turkey Point, Unit 3 Fifth 10-Year Interval Relief Request No. 6 Component Cooling Water Welded Repairs for External Corrosion In Accordance with 10 CFR 50.55a(z)(2)
--Hardship or Unusual difficulty without a compensating increase in the level of quality and Safety--
1.0 ASME CODE COMPONENT(S) AFFECTED The affected components are the Turkey Point Unit 3 Component Cooling Water (CCW) Train B supply piping and Train A & B return piping.
The 18-inch carbon steel supply and return piping are located outside of the Turkey Point Unit 3 containment. The locations of interest are in the vicinity of the floor penetration in the CCW heat exchanger room.
The supply and return CCW piping was constructed to construction code for pressure piping USAS B31.1-1955 and was later reconciled to code of record ANSI B31.1 1973 Edition through Winter 1976 Addenda. For the purpose of this relief request, the safety significance and quality class of the code of record ANSI B31.1 1973, is considered equivalent to ASME Code Section III, Class 3 piping (References 4 and 5).
Accordingly, this piping is subject to repair/replacement requirements of ASME Code,Section XI, IWA 4000.
The following design data pertains to these moderate energy Class 3 CCW supply and return pressure boundary piping:
- Pipe Schedule: 18-inch Sch. STD (tnom = 0.375-inch)
- Design Pressure: 150 psig
- Design Temperature: 200°F
- Material Specification: Carbon Steel, ASME SA-53 Grade A welded The CCW System loop is the heat sink for the residual heat removal System, the Chemical and Volume Control System, the spent fuel cooling loop and various Reactor Coolant System components. The design basis of the CCW System is to provide sufficient heat removal from the Engineered Safety Features to the ultimate heat sink, post-accident. The system, which is normally operated in an open configuration, is designed with sufficient capability to accommodate the failure of any single, active component without resulting in undue risk to the health and safety of the public following a Maximum Hypothetical Accident.
2.0 APPLICABLE CODE EDITION AND ADDENDA The Turkey Point, Unit 3 applicable Code for the fifth 10-year Inservice inspection (ISI) Interval is the ASME Code Section XI 2007 Edition with 2008 Addenda (Reference 1). The Turkey Point Unit 3 Fifth ISI 10-Year interval started on February 22, 2014 and ends on February 21, 2024.
Turkey Point, Unit 3 Fifth 10-Year Interval Relief Request No. 6 Component Cooling Water Welded Repairs for External Corrosion 3.0 APPLICABLE CODE REQUIREMENTS The applicable Code sections for which the relief is requested are ASME Code,Section XI, 2007 Edition, with 2008 Addenda. Article IWA-4421, General requirements, of Section XI of the ASME Code, requires that defects be removed in accordance with IWA-4340, IWA-4411, IWA-4412, IWA-4461 or IWA-4462.
It should be noted that use of IWA-4340 is prohibited by 10 CFR 50.55a(b)(2)(xxv),
which it states: The use of the provisions of IWA-4340, Mitigation of Defects by Modification,Section XI, 2001 Edition through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section are prohibited.
4.0 REASON FOR REQUEST The subject piping degradation has not yet been characterized using ISI non-destructive examination (NDE) techniques. Upon discovery of the actual degraded piping conditions during the Turkey Point Unit 3 refueling outage, which started March 30, 2020, additional evaluation will be performed and additional information will be provided to NRC to supplement this relief request. Hence, this relief request contains two potential options which are deemed to be the two worst possible degraded piping conditions. These options are:
- 1. Option 1: A through-wall leak.
- 2. Option 2: Thinning beyond code allowable minimum.
10 CFR 50.55a(z) authorizes the Director, Office of Nuclear Reactor Regulation, to approve alternatives to the requirements of paragraphs (b) through (h) of 10 CFR 50.55a, including relief from the prohibition on IWA-4340 specified in 10 CFR 50.55a(b)(2)(xxv).
Relief is requested from the requirements of IWA-4421 to remove defects in accordance with IWA-4411, IWA-4461, or IWA-4462 on the subject piping identified in this request, prior to performing repair/replacement activities.
Relief is also requested from the prohibition of IWA-4340 in 10 CFR 50.55a(b)(2)(xxv).
This request is submitted to allow the installation of pressure retaining parts that will be used to restore areas with unacceptable wall thickness loss or through wall leakage caused by corrosion. Installation of replacement pressure retaining parts without first removing the degraded portions of the subject CCW supply and return piping does not comply with the requirements of IWA-4421.
Turkey Point, Unit 3 Fifth 10-Year Interval Relief Request No. 6 Component Cooling Water Welded Repairs for External Corrosion The proposed alternative has been developed because other repair/replacement options that would fully comply with IWA-4421 create a hardship or unusual difficulty without a compensating increase in the level of quality and safety for reasons detailed in this request.
5.0 PROPOSED ALTERNATIVE AND BASIS FOR USE Proposed Alternative In lieu of the requirement of IWA-4421 to remove the defective portion of the component prior to performing repair/replacement activities by welding, unacceptable wall thickness loss or through-wall leakage caused by localized general or pitting corrosion shall be corrected by installation of replacement pressure retaining parts that fully restore the degraded piping. Accordingly,
- In the case of a through-wall leakage in the subject components, an IWA-4340 modification/repair is needed to be installed around the circumference of the degraded piping without removal of the degraded area. The through-wall leak is to be first sealed using a housekeeping repair, to enable additional welding activities on a dry surface. ASME Code Case N-513-3 will be used to justify the structural stability of the CCW piping for past operability, as well as continued operation during the outage, prior to installation of the IWA-4340 modification /repair.
- In the case of localized thinning that results in stresses that exceed the Code allowable stresses in the subject components, an IWA-4340 modification/repair is to be installed around the circumference of the degraded piping without removal or local repair of the degraded area.
- The modification/repair is a welded proprietary repair device, PMCap Restoration Method - US Patent 6,860,297, hereafter referred to as PMCap, installed on the outside of the pipe, and is designed in accordance with ASME B31.1, 1973 edition w/Addenda through Winter 1976, to replace the pressure boundary and to maintain the structural integrity of the degraded piping. The proposed repair is to restore the entire sections of 18-inch CCW piping containing the degradation (pipe/elbow external wall loss due to corrosion) with 20 OD PMCaps. The modification shall provide for the structural integrity of the pipe, such that it no longer relies on the defective area, including projected growth.
o The PMCaps are ASME Code compliant components that replace existing Code pressure boundary components with new Code pressure boundary components.
Turkey Point, Unit 3 Fifth 10-Year Interval Relief Request No. 6 Component Cooling Water Welded Repairs for External Corrosion o The PMCaps are constructed of carbon steel and will be protected from future external corrosion by coating the PMCaps per FPL Protective Coatings for Areas Outside the Reactor Containment requirements and use of a redesigned boot seal to prevent exposure to corrosive environments and/or flood water.
o The PMCaps are constructed with all welds being full penetration and are configured to be full penetration to the existing 18 piping. Existing piping locations where PMCaps are to be attached will be examined to assure adequate soundness and material thickness.
o The PMCap weld designs are per the requirements of ANSI B31.1-1973, the piping code of construction for the CCW system at Turkey Point Nuclear Units 3 and 4 (Reference 6).
o The fabrication/assembly of the PMCap follows the welding guidelines for Code Class 3 components.
o All welding for the installation of the PMCap is accomplished per requirements of the FPL Welding Control Manual and vendor drawings and qualified as pressure boundary welds.
- The PMCap complies with the NRC proposed conditions for use of IWA-4340 of Section XI, 2011 Addenda through 2017 Edition in the Federal Register (Reference 3), with three conditions.
- 1) Cannot be used for crack-leak defects or those associated with flow accelerated corrosion.
- 2) Have to include a rate of degradation equal to either two times the actual measured corrosion rate at the location, or four times the estimated maximum corrosion rate for the piping system.
- 3) Wall thickness measurements to be taken in the vicinity of the modification and relevant base metal during at least the next two refueling outages.
The proposed alternative is the installation of PMCap in accordance with IWA-4340 of the 2013 Edition of Section XI (Reference 2), except as noted herein regarding flaw growth and future examinations, with the repair being for extended acceptance. The subject CCW pipe degradation is caused by external corrosion (not cracking), and since the component will be metallized and coated, the degradation mechanism is mitigated. Because external corrosion is no longer a valid degradation mechanism, future wall thickness examinations are not required.
- Applicable only for the case that a through-wall leak is discovered, prior to installation of the modification/repair, the through-wall leakage will be stopped with a seal. Stopping the leakage is only necessary to enable installation of the PMCap. This repair is anticipated to involve covering the through-wall hole with Turkey Point, Unit 3 Fifth 10-Year Interval Relief Request No. 6 Component Cooling Water Welded Repairs for External Corrosion epoxy pipe repair tape. Once the PMCap is installed, the seal is no longer needed, but will be left in place. At some point, the seal provided by the pipe repair tape is expected to no longer hold and the PMCap will become the pressure boundary.
During plant operation, even when the pipe repair tape is preventing leakage, the PMCap will be the credited pressure boundary. Finally, if leakage is such that a seal other than pipe repair tape is required, additional information will be provided to facilitate the review of this relief request.
- The PMCap is to be installed around the circumference of the degraded piping without removal of the degraded area. The localized flaw appears to be due to external corrosion caused by drainage water in a salt air environment contacting the outside surface of the piping. The localized wall thickness in the degraded area of piping will be further characterized using ultrasonic (UT) examination techniques, and a PMCap will be applied which covers the degraded area and accounts for any future wall loss.
- Where the PMCap is to be welded to the 18-inch pipe, a UT thickness measurement shall also be performed to confirm that material thickness is adequate for the repair design.
- The locations where the PMCap is to be welded to the system pressure boundary shall be located sufficiently far from locations of identified wall thinning to preclude the growth of identified corrosion from challenging the integrity of the repair for the remaining life of the component to which the PMCap is welded.
- The PMCap repair is designed such that it shall not rely on the existing pipe wall.
After installation, an aluminum coating will be applied to the outer surface of the component in order to prevent any future external degradation. Therefore, future external wall loss will not be considered.
- Restoration of the defective or locally thinned area(s) at each location shall be performed only once.
- The PMCaps will include ports to perform post-installation pressure testing.
- Future NDE will be in accordance with ASME Code,Section XI, Table IWD-2500-1 for Examination Category D-A. The piping internal to the PMCap boundary is inaccessible and will not be examined in the future because credit will no longer be taken for its pressure retaining function, thus, it will be outside the Inservice examination requirements of Section XI of the ASME Code. Since the outer surface is being coated external corrosion will not recur.
Turkey Point, Unit 3 Fifth 10-Year Interval Relief Request No. 6 Component Cooling Water Welded Repairs for External Corrosion Basis for the Request Complying with IWA-4421 requirements to remove degraded portions of this piping prior to performing a repair/replacement activity represents a hardship or unusual difficulty without a compensating increase in the level of quality and safety for the following reasons:
Removal of defective portions of this piping would require that the piping be isolated and depressurized. The 18-inch piping cannot be isolated for the following reasons:
- The Turkey Point Unit 3 isolation valves that are needed to close are:
o CCW A Train Return Piping - Valves 3-835A, 3-835B; o CCW B Train Supply Piping - Valves 3-787H, 3-713C; o CCW B Train Return Piping - Valves 3-835B, MOV-3-749B.
Previous attempts to close these isolation valves (upstream of the PMCap locations) have not provided adequate isolation of the CCW piping to be able to perform piping repair work. These isolation butterfly valves are leaking by preventing a moisture free environment to allow welding. The proposed weld area for the pipe butt-welds must be dry as required by the FPL Welding Control Manual.
- CCW system isolation to allow maintenance work on the leaking upstream valves, is operationally not possible due to requirements of the CCW system to remain operational at all plant modes (Operable for Modes 1, 2, 3 and 4 per Technical Specification 3.7.2; and functional for Modes 5 and 6 as heat sink for the Spent Fuel pool heat exchangers).
- Installation of a mechanical stop in the 18 inch piping for system isolation is potentially possible. However, installation of a line stop will result in a permanent branch connection on the CCW piping that may require the design of a new support/restraint in an otherwise congested piping area. Also, installation of the new branch line is not entirely desirable because this activity could result in metal shavings due to the boring process and the removed portion of the pipe wall dislodging, entering the system, and becoming debris that could hinder system operation and make it difficult to retrieve the loose FME.
- Use of a freeze seal to isolate the 18-inch CCW pipes in order to replace the degraded piping section presents some complications in establishing a freeze plug on this large bore vertical piping with fluid flow in the pipe. The size of Turkey Point, Unit 3 Fifth 10-Year Interval Relief Request No. 6 Component Cooling Water Welded Repairs for External Corrosion the pipe presents some problem with this method and situating the freeze seal equipment in the CCW Heat Exchanger Room is a challenge in the congested piping area. The installed freeze seal equipment on the piping will impose new added design loads on the piping and will require the provision of new or temporary pipe supports and re-analysis of the affected piping portion of the CCW system.
In conclusion, the ASME B & PV Code Section XI requirement, IWD-3120(b), is to correct a component containing a flaw(s). The proposed alternative is to relocate the pressure boundary by restoring the area, with a twenty (20) inch diameter PMCap with a full penetration weld at locations previously confirmed to have adequate material thickness and not correct the piping containing the flaw(s) but show by qualitative assessment that the material and the presence of the postulated worst case flaw(s) will not be detrimental to the pressure retaining function of the component cooling water piping system. For these reasons, Turkey Point believes that the proposed alternative discussed herein will provide reasonable assurance of continued structural integrity of the subject CCW components.
6.0 DURATION OF PROPOSED ALTERNATIVE The licensee requests approval of the proposed alternative for the remaining life of the plant, as supported by the PMCap design documentation, or until such time that further repair/replacement activities are required for the affected portions of the CCW system piping, whichever occurs first.
7.0 PRECENDENT
- 1. Duke Energy Carolinas, LLC, Oconee Nuclear Station, Units 1 and 2, Relief Request Serial #15-ON-001, ADAMS Accession No. ML15349A453.
8.0 REFERENCES
- 1) American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code,Section XI, 2007 Edition, 2008 Addenda.
- 2) American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2013 Edition.
- 3) Federal Register, Volume 83, Number 218, November 9, 2018, Proposed Rules.
- 4) Regulatory Guide 1.26, Quality Group Classifications and Standards for Water-Steam-, and Radioactive-waste-containing Components of Nuclear Power Plants.
- 5) NextEra Energy Engineering Design Standard, STD-M-027, Rev. 6, ASME Section XI Repair and Replacement.
- 6) ASME/ANSI B31.1, 1973 Edition w/Addenda through Winter 1976