MONTHYEARDCL-2019-521, Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant2019-08-20020 August 2019 Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant ML16048A2182015-11-10010 November 2015 Compress Air Energy Storage (Caes) ML15160A2362015-07-0101 July 2015 Enclosures Drawing/Map for All DCPP (2015) Environmental Report ML16048A2052015-06-30030 June 2015 Storm Water Pollution Prevention Plan DCL-2015-525, Marine Mammal Stranding Report (Sea Lion)2015-05-27027 May 2015 Marine Mammal Stranding Report (Sea Lion) ML14364A2652014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 1 of 4 ML14364A2662014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 2 of 4 ML14364A2692014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 3 of 4 DCL-14-103, License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 42014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4 DCL-2014-523, Submittal of NOAA Form 89-864 Marine Mammal Stranding Report (Sea Lion)2014-06-17017 June 2014 Submittal of NOAA Form 89-864 Marine Mammal Stranding Report (Sea Lion) DCL-2014-517, Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant2014-04-17017 April 2014 Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant ML16048A2862013-12-31031 December 2013 CEC-1304 Schedule 3 Part a (Page 1), Year 2013. Part 2 of 2 DCL-13-045, Annual Nonradiological Environmental Operating Report2013-04-30030 April 2013 Annual Nonradiological Environmental Operating Report DCL-12-042, 2011 Annual Nonradiological Environmental Operating Report2012-04-30030 April 2012 2011 Annual Nonradiological Environmental Operating Report ML16048A2142011-03-0707 March 2011 2010 Air Emission Inventory Report DCL-2010-505, 2010 Annual Sea Turtle Report for Diablo Canyon Power Plant2011-01-28028 January 2011 2010 Annual Sea Turtle Report for Diablo Canyon Power Plant DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-32011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-3 DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization DCL-11-005, Report on the Analysis of the Shoreline Fault Zone, Appendix C, Seismicity Reviews Through Appendix D, Potential Field Data - Magnetic Surveys2011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix C, Seismicity Reviews Through Appendix D, Potential Field Data - Magnetic Surveys ML1101404142011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area ML1101404122011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys ML1101404202011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-3 ML1101404082011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area ML1101404252011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization ML16048A2842010-12-31031 December 2010 CEC-1304 Schedule 3 Part a (Page 1), Year 2010. Part 1 of 2 DCL-10-124, Information to Support NRC Review of DCPP License Renewal Application (LRA) Environmental Report - Operating License Renewal Stage2010-10-27027 October 2010 Information to Support NRC Review of DCPP License Renewal Application (LRA) Environmental Report - Operating License Renewal Stage DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish2009-12-31031 December 2009 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish ML11166A1532009-12-31031 December 2009 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock2008-12-31031 December 2008 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock ML11166A1512008-12-31031 December 2008 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock ML16050A2922008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 2 of 2 ML16050A2912008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 1 of 2 DCL-2008-508, Marine Mammal and Marine Turtle Stranding Report for a Dead California Sea Lion (Zalophus Californianus) Discovered in the Power Plant Intake Structure2008-02-15015 February 2008 Marine Mammal and Marine Turtle Stranding Report for a Dead California Sea Lion (Zalophus Californianus) Discovered in the Power Plant Intake Structure DCL-2008-504, 2007 Annual Sea Turtle Report2008-01-29029 January 2008 2007 Annual Sea Turtle Report DCL-2007-535, National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure2007-08-0909 August 2007 National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure DCL-07-049, Annual Nonradiological Environmental Operating Report2007-04-26026 April 2007 Annual Nonradiological Environmental Operating Report DCL-2006-511, Annual Summary Report on Discharge Monitoring at the Diablo Canyon Power Plant for 20052006-02-27027 February 2006 Annual Summary Report on Discharge Monitoring at the Diablo Canyon Power Plant for 2005 DCL-05-002, Appendix a, Rupture Process of the 2003 San Simeon Earthquake.2004-11-30030 November 2004 Appendix a, Rupture Process of the 2003 San Simeon Earthquake. DCL-04-071, Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake2004-06-0707 June 2004 Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake ML0312500752003-04-25025 April 2003 Annual Nonradiological Environmental Operating Report ML0229503042002-10-15015 October 2002 ISFSI Safety Analysis Report - Amendment 1 to Diablo Canyon Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1, Table 4.3-1 - Section 8.2.2 DCL-02-051, 2001 Annual Radiological Environmental Operating Report2002-04-30030 April 2002 2001 Annual Radiological Environmental Operating Report ML0203003982001-12-21021 December 2001 Part 1 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports ML0203004112001-12-21021 December 2001 Part 2 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports, Photographs of Core Boxes ML0203004332001-12-21021 December 2001 Part 3 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports. Attachment 1: Field Boring Logs in ISFSI Study Area ML0203004422001-12-17017 December 2001 Part 4 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports. Data Report D: Trenches in the ISFSI Study Area ML0203100092001-12-17017 December 2001 Data Report F: Field Discontinuity Measurements, Diablo Canyon ISFSI, Book 3 of 4 2019-08-20
[Table view] Category:Letter type:DCL
MONTHYEARDCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel 2024-09-09
[Table view] |
Text
Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805/545-6000 PG&E Letter DCL-2010-505 Certified/Return Receipt
- 7010-1060-0000-4204-3824 January 28, 2011 Joseph G. Cordaro Wildlife Biologist National Marine Fisheries Service 501 West Ocean Blvd., Suite 4200 Long Beach, California 90802-4213
Dear Mr. Cordaro:
Enclosed is the 2010 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP).
As required by the biological opinion (issued: September 18, 2006) generated by Nuclear Regulatory Commission (NRC) biologists and National Oceanographic and Atmospheric Administration (NOAA) Fisheries staff, the enclosed annual report summarizes sea turtles observed in the vicinity of DCPP during 2010.
One small green sea turtle was found in an intake structure forebay on August 08, 2010. The turtle was released to the open ocean unharmed early the following morning. No other sea turtles were observed in the vicinity of DCPP during 2010.
If you have any questions or concerns regarding the enclosed report, or require additional information, please contact James Kelly of my staff at (805) 545-3194.
Sincerely, i WelschM.
Station Director,Diablo Canyon PowerPlant 2011505/jlk Enclosures (1)
COPY
PG&E Letter DCL-2011-505 Joseph G. Cordaro, NMFS January 28, 2011 Page 2 cc: Alan B. Wang, NRR Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 7 El 11555 Rockville Pike Rockville, MD 20852-2738 Michael S. Peck Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
PG&E Letter DCL-2011-505 ENCLOSURE 1 2010 ANNUAL SEA TURTLE REPORT FOR DIABLO CANYON POWER PLANT
PACIFIC GAS AND ELECTRIC COMPANY NUCLEAR POWER GENERATION 2010 Annual Sea Turtle Report For Diablo Canyon Power Plant
PACIFIC GAS AND ELECTRIC COMPANY 2010 ANNUAL SEA TURTLE REPORT FOR DIABLO CANYON POWER PLANT.
TABLE OF CONTENTS Incidental Take Reports ...................................................... 1 Intake Inspection Records ........................... 1 Sea Turtle O bservations ....................................................... 1 Status of DCPP Incidental Take Level .................. 1 Actions to Reduce Sea Turtle Entrainment ........................... 2 Appendix 1: Incidental Take Report -August 25, 2010 Appendix 2: Intake Inspections
INCIDENTAL TAKE REPORTS One green sea turtle was found in DCPP's intake structure in the late evening on August 08, 2010. The live, healthy and uninjured, sea turtle was measured, tagged, and released unharmed about two miles offshore of the power plant early the following morning (August 09, 2010). A copy of the sea turtle stranding report submitted to the National Marine Fisheries Service (NMFS) on August 25, 2010 is included in Appendix 1.
INTAKE INSPECTION RECORDS In the 24-hours prior to the incidental take of the green sea turtle in August 2010, Intake Operators inspected the intake forebays approximately every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. A summary table of the inspections conducted during this time period is included in Appendix 2.
SEA TURTLE PHOTOGRAPHS Several photographs were taken of the green sea turtle found in DCPP's intake structure August 08, 2010. Four photographs of the turtle were incorporated in the stranding report submitted to the NMFS on August 25, 2010 (Reference Appendix 1).
SEA TURTLE OBSERVATIONS Biological monitoring and other activities occurred routinely in the waters around DCPP throughout 2010. Other than the green sea turtle found in the power plant intake structure August, there were no other sea turtles observed in the vicinity of DCPP during 2010.
STATUS OF DCPP INCIDENTAL TAKE LEVEL DCPP's 2006 Incidental Take Statement allows the following levels of sea turtle take for the period 2007 through 2026.
Species Total Entrainment Mortality Serious Injury Green 15 turtles 3 turtles 1 turtle Leatherback 3 turtles 1 turtle 1 turtle Loggerhead 3 turtles 1 turtle 1 turtle Olive Ridley 3 turtles 1 turtle 1 turtle Sea turtles taken and released since 2006: Three healthy green sea turtles (one in 2007, one in 2009, and one in 2010).
As three healthy green sea turtle were taken and released since 2006, DCPP has twelve remaining allowed green sea turtle takes for 2011 through 2026. Leatherback, Loggerhead, and Olive Ridley allowed takes remain at three. There have been no sea turtle mortalities or serious injuries.
ACTIONS TO REDUCE SEA TURTLE ENTRAINMENT DCPP took no specific direct actions to reduce sea turtle entrainment during 2010. Sea turtles continue to be rare in the vicinity of the power plant. In addition, all incidental takes to date have been live, healthy and uninjured, sea turtles that were released unharmed.
Signs reminding operations and maintenance personnel to watch for turtles during inspection rounds were installed at the intake in early 2007, and remained in place throughout 2010.
2010 Annual Sea Turtle Report Diablo Canyon Power Plant APPENDIX 1 Sea Turtle Incidental Take Report August 25, 2010 (5-Pages)
Pacific Gas and E1t6ic Company Diablo Canyon Power Plant PO. Box 56 Avila Beach, CA 93424 805/545-6000 PG&E Letter DCL-2010-536 Certified/Retum Receipt 7007-2680-0000-5565-4636 August 25, 2010 Joseph G. Cordaro, Wildlife Biologist National Marine Fisheries Service 501 West Ocean Blvd.,- Suite 4200 Long Beach, California 90802-4213
Dear Mr. Cordaro:
Enclosed is a National Marine Fisheries Service (NMFS) Marine Mammal and Marine Turtle Stranding Report for a sea turtle discovered in the Diablo Canyon Power Plant (DCPP) intake structure.
A live sea turtle was discovered in the 2-7 intake structure forebay by plant operations personnel at approximately 9:50 p.m. on August 08, 2010. The turtle was identified as a green sea turtle (Chelonia mydas).
As authorized in DCPP's incidental take statement issued September'18, 2006, DCPP staff removed the turtle from the intake structure early the following morning (August 09, 2010) for release offshore of the Facility. The turtle was removed by salmon net and transported to a boat. The plant biologist completed measurements of the specimen and photographs were taken. The photographs are enclosed in addition to the stranding report. The turtle was estimated to weigh 25 pounds, with a shell length (notch-tip) of 20 and 7/8 inches, and appeared to be in good health based on visual observation. There were no abrasions or indication of any injury. The turtle was tagged on the right front flipper with tag #MC-24, and subsequently transported by boat and released in the ocean approximately two miles southwest of DCPP. The turtle swam away strongly in a southerly direction following release.
Discovery and release of the turtle was reported to NMFS on September 09, 2010, within the required 48-hour reporting period.
Live green sea turtles have been discovered at DCPP's intake on nine previous occasions during commercial operations: September 08, 2009, July 23, 2007, February 27, 2001, April 16, 2000, August 24, 1999, May 29, 1999, June 12, 1997, January 10, 1997, and April 27, 1994. Green sea turtles are infrequently observed in the coastal waters off of DCPP.
.COPY
PG&E Letter DCL-2010-536 Joseph G. Cordaro, NMFS August 25, 201,0 Page 2 If you have any questions or concerns regarding the enclosed report, or require additional information, please contact Jim Kelly of my staff at (805) 545-3194.
Sincerely, Brad C. Hinds Manager- Chemistry and Environmental Operations 2010536/jlk/bkc Enclosures (2) cc w/enclosures: Alan B. Wang NRR Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08B1 11555 Rockville Pike Rockville, MD 20852-2738 Michael S. Peck Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Kathy Hill California Department of Fish and Game 1416 9t" Street, Room 1341 Sacramento, CA 95814
MARINE MAMMAL AND MARINE TURTLE STRANDING REPORT SID#
(NMFS USE)
FIELD NO.:_ NMFS REGISTRi ATION NO.
COMMON NAME: Green Sea Turtle GENUS: Chelonia SPECIES: mydas EXAMINER Name: James L. Kelly Agency: Pacific Gas &'Electric CoPhone: (805) 545-3194 Address: Diablo Canyon Power Plant, P.O. Box 56. Avila Beach. California 93424 LOCATION San Luis LOCATION San Luis TYPE OF OCCURRENCE State: CA County:0bispo Mfass Stranding: (Yes) / (No # Animals One (1)
Human Interaction: (Yes),7N/o) / (?)
City: Avila Beach Check one: 1. Boat collision
- 2. Shot Locality Details: Diablo Canyon 4. Fishery interaction
]E5. Other Found alive and-healthy in Power Plant (DCPP) 9-Miles NW of power plant intake structure.
How determined:
Avila Beach. 2-7 Forebay Bar Rack of the Plant Intake Structure. Other Causes (if known):
- Longitude: 1200 51' 13" -W DATE OF INITIAL OBSERVATION: DATE OF EXAMINATION:
Yr 2010 Mo Auqust Day 08 Yr 2010 Mo August Day 09 CONDITION: Check one:_X4l.Alive CONDITION: Check one:_Xi.Alive
_2.Fresh dead 2.Fresh dead 3.Moderate decomp. 3.Moderate decomp.
4.Advanced decomp. 4.Advanced decomp.
5.Mua*nified -5.Kummified
_? Unknown ? Unknown LIVE ANIMAL - Condition and Disposition: TAGS APPLIED?: / No Check one _l.Released at site TAGS PRESENT?: (YesJ/
or more: _2.Sick 3.Injured Dorsal Left Right
___4Died
_5.Euthanized ag No.(s): MC-24
_6.Rehabilitated and released
__? Unknown Color(s): Silver Transported to: 2.0-miles SW Offshore Type: Flipper (Died) /(ReMlsed) Date: August 09, 2010 Placement Front/Rear(Eont Rear CARCASS - Disposition, check one: MORPHOLOGICAL DATA:
Check one: _l.Left at site Sex - Check one: _l.Male
__2.Buried 2.Female
_3.Towed T? Unknown
__4.Sci. collection (see below) m '
2
-_5.Edu. collection (see below) Straight Length: 0 & 7/8 (cm)( (est)
__6.Other_____________
_? Unknown PHOTOS TAKEN? ( / (No)
PECROPSIED? (Yes) / (No)
REMARKS: Straight Width (Widest Point) 19 & 7/8 inches. Tail Length 7/8 inches.
Turtle appeared strong and healthy. No indications of any injury.
jISPOSITION OF'TISSUE/SKELETAL MATERIAL:
It is estimated that completion OMB#0648-,0178 of this form requires 20 minutes.
PG&E Letter DCL-2010-536 August 25, 2010 Specimen Photographs - Green Sea Turtle (Chelonia mydas)
Diablo Canyon Power Plant - August 09, 2010 Photographs Page 1 of 2
PG&E Letter DCL-2010-536 August 25, 2010 Specimen Photographs - Green Sea Turtle (Chelonia mydas)
Diablo Canyon Power Plant - August 09, 2010 Photographs Page 2 of 2
2010 Annual Sea Turtle Report Diablo Canyon Power Plant APPENDIX 2 Intake Inspection Records August 07-08, 2010 (1-Page)
j Intake Bar Rack Inspection Times During the 24-Hour Period Prior to Sea Turtle Sighting August 08, 2010 Operator Date Unit 1 Unit 2 ID Condition 08/07/2010 08:45 08:46 Smith SAT 08/07/2010 21:58 21:59 Nash SAT 08/08/2010 13:02 13:02 Kiser SAT 08/08/2010 21:51 21:50 Nash One Turtle SAT = Satisfactory - no turtles, kelp at acceptable levels,. bar racks satisfactory condition.
Detailed shift operator logs are available that include the intake inspections listed in the table above conducted August 07, 2010 and August 08, 2010.