Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 20) - Cover Letter Only
ML17095A552
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/31/2017
From: Boles B
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-17-061
Download: ML17095A552 (3)


Text

FENOC' 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Brian D. Boles 419-321-7676 Vice President, Fax: 419-321-7582 Nuclear SAFEGUARDS INFORMATION

- WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -

DOCUMENT AS DECONTROLLED March 31, 2017 10 CFR 50.4 L-17-061 10 CFR 50.54(p)

ATTN: Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 20)

. The FirstEnergy Nuclear Operating Company hereby submits Revision 20 of the "Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan; for the Davis-Besse Nuclear Power Station" (Enclosure). The changes to the Plan were reviewed prior to implementation and determined not to decrease the safeguards effectiveness of the Physical Security Plan. Accordingly, this revision is being submitted in accordance with provisions of 10 CFR 50.54(p )(2). A report of the changes made is included with the revised plan.

The Enclosure contains Safeguards Information and pursuant to 10 CFR 73.21, is to be withheld from public disclosure.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. W. Lee Willis, Manager, Site

  • Protection, at (419) 321-7253.

Sincerely,

~µ!~

Brian D. Boles SAFEGUARDS INFORMATION

- WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS DECONTROLLED

- **soot

JKR

SAFEGUARDS INFORMATION

- WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -

DOCUMENT AS DECONTROLLED Davis-Besse Nuclear Power Station, Unit 1 L-17-061 Page 2 of 2

Enclosure:

Physical Security Plan, Training and* Qualification Plan, and Safeguards Contingency Plan (Revision 20) cc: NRC Region Ill Administrator DB-1 NRC Resident Inspector (w/o Enclosures)

DB-1 NRR Project Manager (w/o Enclosures)

Utility Radiological Safety Board (w/o Enclosures)

SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -

DOCUMENT AS DECONTROLLED

SAFEGUARDS *INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -

DOCUMENT AS DECONTROLLED Enclosure L-17-061 Davis-Besse Nuclear Power Station, Unit 1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 20)

SAFEGUARDS INFORMATION WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS -

DOCUMENT AS DECONTROLLED