L-12-178, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights From.

From kanterella
(Redirected from L-12-178)
Jump to navigation Jump to search
FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights From.
ML12163A318
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 06/11/2012
From: Sena P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-12-178
Download: ML12163A318 (2)


Text

FENOC

-_---\

76 South Main Street FirstEnergyNuclear Operating Company Akron. Ohio 44308 tufplrP.Sendlil Presidentand Chief Operating Officer J u n e11 , 2 0 1 2 L-12-178 10 cFR 50.54(f)

ATTN: DocumentControlDesk U.S.NuclearRegulatory Commission 11555Rockville Pike Rockville. MD 20852

SUBJECT:

BeaverValleyPowerStation,UnitNos.1 and2 DocketNo.50-334,LicenseNo.DPR-66 DocketNo.50-412,LicenseNo.NPF-73 Davis-Besse NuclearPowerStation DocketNo.50-346,LicenseNo.NPF-3 PerryNuclearPowerPlant DocketNo.50-440,LicenseNo.NPF-58 FENOCResponse to NRCRequestfor lnformation Pursuantto 10 CFR50.54(fl Reqardinq the Floodinq Aspectsof Recommendation 2.3 of the Near-Term TaskForce Reviewof Insiqhts fromthe Fukushima Dai-ichiAccident On March12,2012,the NuclearRegulatory Commission (NRC)issueda lettertitled, "Requestfor lnformation Pursuantto Title10 of the Codeof FederalRegulations 50.54(f)Regarding Recommendations 2.1,2.3,and9.3of the Near-Term TaskForce Reviewof Insightsfromthe Fukushima Dai-ichiAccident," to all power reactorlicensees and holdersof construction permitsin activeor deferredstatus.Enclosure 4 of the 10 CFR50.54(f)lettercontainsspecificRequested Actions,Requested lnformation, and RequiredResponses associated withRecommendation 2.3 tor FloodingWalkdowns.

ThisletterprovidesFENOC's90 day responseto the 10 CFR50.54(0letterfor Beaver ValleyPowerStation,UnitNos.1 and2 (BVPS),Davis-Besse NuclearPowerStation (DBNPS), andPerryNuclearPowerPlant(PNPP).

ForfloodingRecommendation 2.3(walkdowns), Enclosure 4 of the 10 CFR50.54(0 letterstatesthateachlicenseewillconfirmthatit intendsto usethe NRC-endorsed floodingwalkdownprocedure or providea description of the processit will use.

BeaverValleyPowerStation,UnitNos.1 and2 Davis-Besse NuclearPowerStation PerryNuclearPowerPlant L-12-178 Page2 FENOCconfirms thatit intendsto usethefloodingwalkdown procedure (NEl 12-07, Guidelinesfor PerformingVerificationWalkdownsof PlantFloodProtectionFeatures) endorsed by the NRCas the basisfor theflooding walkdowns at BVPS,DBNPS,and PNPP.

Thislettercontainsno newregulatory commitments. Shouldyou haveany questions concerning -

the contentof this letter,pleasecontactMr. PhilH. Lashley,Supervisor FleetLicensing, at 330-315-6808.

I declareunderpenaltyof perjurythatthe foregoingis trueand correct.Executedon June // ,2012.

Resnec2Jlv' n D -

tuF14 PeterP. Sena.lll cc: Director,Officeof NuclearReactorRegulation (NRR)

NRCRegionI Administrator NRCRegionlll Administrator NRCResident Inspector(BVPS)

NRCResident lnspector(DBNPS)

NRCResident Inspector(PNPP)

NRRProjectManager(BVPS)

NRRProjectManager(DBNPS)

NRRProjectManager(PNPP)

DirectorBRP/DEP SiteBRP/DEPRepresentative UtilityRadiological SafetyBoard