L-11-088, Withdrawal of 10 CFR 50.55a Requests IR-001 and IR-012

From kanterella
Jump to navigation Jump to search

Withdrawal of 10 CFR 50.55a Requests IR-001 and IR-012
ML111020311
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/05/2011
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IR-012, L-11-088, TAC ME5375, TAC ME5382
Download: ML111020311 (1)


Text

FENOC f10 PerryNuclear Power Plant Center Road FirstEnergyNuclear OperatingCompany Perry Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 April 5, 2011 L-1 1-088 10 CFR 50.55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Withdrawal of 10 CFR 50.55a Requests IR-001 (TAC No. ME5375) and IR-012 (TAC No. ME5382)

By letter dated January 24, 2011 (Accession No. ML110320065), the FirstEnergy Nuclear Operating Company (FENOC) submitted nine separate 10 CFR 50.55a requests associated with the Perry Nuclear Power Plant Inservice Inspection Program.

As discussed during a teleconference between FENOC and the Nuclear Regulatory Commission (NRC) on February 16, 2011, and recommended by NRC letter dated March 4, 2011 (Accession No. ML110560694), FENOC hereby withdraws 10 CFR 50.55a Requests IR-001 and IR-012.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -

Fleet Licensing, at (330) 761-6071.