MONTHYEARL-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-21-260, Core Operating Limits Reports2021-11-15015 November 2021 Core Operating Limits Reports L-21-137, Cycle 28 Core Operating Limits Report2021-05-21021 May 2021 Cycle 28 Core Operating Limits Report L-20-143, Cycle 22 Core Operating Limits Report2020-05-0808 May 2020 Cycle 22 Core Operating Limits Report L-20-078, Cycle 27-1 Core Operating Limits Report2020-03-16016 March 2020 Cycle 27-1 Core Operating Limits Report L-19-239, Cycle 27 Core Operating Limits Report2019-11-0808 November 2019 Cycle 27 Core Operating Limits Report L-18-264, Cycle 21 Core Operating Limits Report2018-11-16016 November 2018 Cycle 21 Core Operating Limits Report L-18-119, Cycle 26 Core Operating Limits Report2018-05-21021 May 2018 Cycle 26 Core Operating Limits Report L-17-344, Cycle 25-1 Core Operating Limits Report2017-11-28028 November 2017 Cycle 25-1 Core Operating Limits Report L-17-071, Cycle 20 Core Operating Limits Report2017-06-0606 June 2017 Cycle 20 Core Operating Limits Report L-16-302, Cycle 25 Core Operating Limits Report2016-10-14014 October 2016 Cycle 25 Core Operating Limits Report L-16-048, Core Operating Limits Reports Midcycle Revision2016-02-11011 February 2016 Core Operating Limits Reports Midcycle Revision L-15-376, Cycle 24-1 Core Operating Limits Report2015-12-28028 December 2015 Cycle 24-1 Core Operating Limits Report L-15-304, Cycle 19, Core Operating Limits Report2015-10-29029 October 2015 Cycle 19, Core Operating Limits Report L-15-162, Cycle 24 Core Operating Limits Report2015-05-14014 May 2015 Cycle 24 Core Operating Limits Report L-14-389, Submittal of Core Operating Limits Report2014-12-11011 December 2014 Submittal of Core Operating Limits Report L-14-141, Pressure and Temperature Limits Reports and Unit No. 2 Cycle 18 Core Operating Limits Report2014-05-12012 May 2014 Pressure and Temperature Limits Reports and Unit No. 2 Cycle 18 Core Operating Limits Report L-13-329, Core Operating Limits Report, Cycle 232013-11-0404 November 2013 Core Operating Limits Report, Cycle 23 L-12-358, Submission of Core Operating Limits Report, Cycle 172012-10-29029 October 2012 Submission of Core Operating Limits Report, Cycle 17 L-12-181, Submittal of Core Operating Limits Report, Cycle 16-12012-06-11011 June 2012 Submittal of Core Operating Limits Report, Cycle 16-1 L-12-140, Core Operating Limits Report, Cycle 222012-05-0707 May 2012 Core Operating Limits Report, Cycle 22 L-10-301, Core Operating Limits Report, Cycle 212010-11-10010 November 2010 Core Operating Limits Report, Cycle 21 L-10-015, Core Operating Limits Report, Cycle 20 Revised2010-02-0101 February 2010 Core Operating Limits Report, Cycle 20 Revised L-09-293, Submission of the Core Operating Limits Report, Cycle 152009-11-0606 November 2009 Submission of the Core Operating Limits Report, Cycle 15 L-09-214, Submittal of the Core Operating Limits Report, Cycle 14-12009-08-20020 August 2009 Submittal of the Core Operating Limits Report, Cycle 14-1 L-09-112, Submittal of Core Operating Limits Report, Cycle 202009-05-12012 May 2009 Submittal of Core Operating Limits Report, Cycle 20 L-08-163, Transmittal of Revision to the Core Operating Limits Report, Cycle 142008-05-0808 May 2008 Transmittal of Revision to the Core Operating Limits Report, Cycle 14 L-07-137, Core Operating Limits Report, COLR 19 and COLR 19-12007-10-25025 October 2007 Core Operating Limits Report, COLR 19 and COLR 19-1 L-07-087, Core Operating Limits Report, COLR 18-3, Rev 3 and COLR 13-2, Rev 2, Pressure and Temperature Limits Report2007-06-25025 June 2007 Core Operating Limits Report, COLR 18-3, Rev 3 and COLR 13-2, Rev 2, Pressure and Temperature Limits Report L-06-155, Core Operating Limits Report, Revision 132006-11-0606 November 2006 Core Operating Limits Report, Revision 13 L-06-062, Cycle 18 Core Operating Limits Report2006-04-14014 April 2006 Cycle 18 Core Operating Limits Report L-07-043, Cycle 18-2 and Unit 2, Cycle 13-1 Core Operating Limits Mid-Cycle Revision Updates2006-03-26026 March 2006 Cycle 18-2 and Unit 2, Cycle 13-1 Core Operating Limits Mid-Cycle Revision Updates L-05-117, Cycle 17 Core Operating Limits Report Mid-Cycle Revision2005-07-11011 July 2005 Cycle 17 Core Operating Limits Report Mid-Cycle Revision L-05-081, Cycle 12 Reload and Core Operating Limits Report2005-04-22022 April 2005 Cycle 12 Reload and Core Operating Limits Report L-04-147, Cycle 17 Reload and Core Operating Limits Report2004-11-0505 November 2004 Cycle 17 Reload and Core Operating Limits Report L-03-158, Cycle 11 Reload and Core Operating Limits Report2003-10-0909 October 2003 Cycle 11 Reload and Core Operating Limits Report L-03-051, Cycle 16 Reload and Core Operating Limits Report2003-04-17017 April 2003 Cycle 16 Reload and Core Operating Limits Report L-02-079, Mid-Cycle Core Operating Limits Report Revision2002-07-31031 July 2002 Mid-Cycle Core Operating Limits Report Revision 2024-05-23
[Table view] Category:Letter type:L
MONTHYEARL-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-198, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0707 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-241, Submittal of the Updated Final Safety Analysis Report, Revision 272023-11-29029 November 2023 Submittal of the Updated Final Safety Analysis Report, Revision 27 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair 2024-09-17
[Table view] |
Text
FENOC FirstEnergyNuclear OperatingCompany James H. Lash 724-682-5234 Site Vice President Fax: 724-643-8069 November 6, 2006 L-06-155 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Core Operating Limits Report, Revision 13 FirstEnergy Nuclear Operating Company (FENOC) hereby submits a revision of the Core Operating Limits Report (COLR) for Beaver Valley Power Station (BVPS) Unit No. 2 as required by Section 6.9.5 of the BVPS Technical Specifications. Revision 13 of the COLR is enclosed.
Revision 13 of the COLR is associated with the implementation of License Amendments Nos. 155 (Relaxed Axial Offset Control) and 156 (Extended Power Uprate) and the reload for Cycle 13 with a 3% power uprate, effective October 20, 2006.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Gregory A. Dunn, Manager -
FENOC Fleet Licensing, at (330) 315-7243.
Sincerely, ames H. Lash
Enclosure:
Beaver Valley Power Station Unit No. 2, Core Operating Limits Report, Revision 13 c: Mr. T. G. Colburn, NRR Senior Project Manager Mr. P. C. Cataldo, NRC Senior Resident Inspector Mr. S. J. Collins, NRC Region I Administrator Mr. D. A. Allard, Director BRP/DEP Mr. L. E. Ryan (BRP/DEP)
L-06-155 Enclosure Beaver Valley Power Station Unit No. 2 Core Operating Limits Report Revision 13
BVPS-2 LICENSING REQUIREMENTS MANUAL 4.1 CORE OPERATING LIMITS REPORT This Core Operating Limits Report provides the cycle specific parameter limits developed in accordance with the NRC approved methodologies specified in Technical Specification Administrative Control 6.9.5.
Specification 3.1.3.5 Shutdown Rod Insertion Limits The shutdown rods shall be withdrawn to at least 225 steps.0)
Specification 3.1.3.6 Control Rod Insertion Limits Control Banks A and B shall be withdrawn to at least 225 steps.0)
Control Banks C and D shall be limited in physical insertion as shown in Figure 4.1-1.)
Specification 3.2.1 Axial Flux Difference The Axial Flux Difference (AFD) acceptable operation limits are provided in Figure 4.1-2.
Specification 3.2.2 Heat Flux Hot Channel Factor - Fo(Z) Limits The Heat Flux Hot Channel Factor - FQ(Z) limit is defined by:
FQ(Z) [<CFQ]*K(Z) for P> 0.5 FQ(Z) [CFQ]
- K(Z) forP*< 0.5 Where: CFQ = 2.40 P= THERMAL POWER RATED THERMAL POWER K(Z) the function obtained from Figure 4.1-3.
FQ (Z) = F (Z)* 1.0815 F6 (Z) F6(Z) *W(Z)
The W(Z) values are provided in Table 4.1-1.
The FQ(Z) penalty function, applied when the analytic FQ(Z) function increases from one monthly measurement to the next, is provided in Table 4.1-2.
(1) As indicated by the group demand counter BEAVER VALLEY - UNIT 2 4.1-1 COLR 13 Revision 49
BVPS-2 LICENSING REQUIREMENTS MANUAL Specification 3.2.3 Nuclear Enthalpy Rise Hot Channel Factor - F NAH FNAH -< CFAH * (1 + PFAH (1-P))
Where: CFAH = 1.62 PFAH = 0.3 P= THERMAL POWER RATED THERMAL POWER BEAVER VALLEY - UNIT 2 4.1-2 COLR 13 Revision 49
BVPS-2 LICENSING REQUIREMENTS MANUAL 225 200 175 "i) 150 C) 0.
0~ 125 z
o i-C,)
0 100 10.
Z
<m r0 75 0
50 25 0
0 10 20 30 40 50 60 70 80 90 100 PERCENT OF RATED THERMAL POWER FIGURE 4.1-1 CONTROL ROD INSERTION LIMITS AS A FUNCTION OF RATED POWER LEVEL BEAVER VALLEY - UNIT 2 4.1-3 COLR 13 Revision 49
BVPS-2 LICENSING REQUIREMENTS MANUAL 120 110 100 90 80 70 60 50 40 30 20 10 0
-60 -40 -20 0 20 40 60 Axial Flux Difference (Delta I)%
FIGURE 4.1-2 AXIAL FLUX DIFFERENCE LIMITS AS A FUNCTION OF PERCENT OF RATED THERMAL POWER FOR RAOC BEAVER VALLEY - UNIT 2 4.1-4 COLR 13 Revision 49
BVPS-2 LICENSING REQUIREMENTS MANUAL 1.2 1.0 0.8 0.6 0.4 0.2 0.0 0 2 4 6 8 10 12 Core Height (feet)
FIGURE 4.1-3 FQT NORMALIZED OPERATING ENVELOPE, K(Z)
BEAVER VALLEY - UNIT 2 4.1-5 COLR 13 Revision 49
BVPS-2 LICENSING REQUIREMENTS MANUAL Specification 3.3.1.1 Reactor Trip System Instrumentation Setpoints, Table 3.3-1 Table Notations A and B Overtemperature AT Setpoint Parameter Values:
Parameter Value Overtemperature AT reactor trip setpoint KI *1.239 Overtemperature AT reactor trip setpoint Tavg coefficient K2 > 0.0183/ 0 F Overtemperature AT reactor trip setpoint pressure coefficient K3 > 0.001/psia Tavg at RATED THERMAL POWER T'<* 580.0°F(')
Nominal Pressurizer Pressure P'> 2250 psia Measured reactor vessel AT lead/lag time constants til = 0 sec*
(* The response time is toggled off to meet the analysis value of zero.) -12 = 0 sec*
Measured reactor vessel AT lag time constant Tc3
- 6 secs Measured reactor vessel average temperature lead/lag time constants T4 - 30 secs T5 < 4 secs Measured reactor vessel average temperature lag time constant T6 < 2 secs f (AI) is a function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests such that:
(i) for qt - qb between -37 percent and +15 percent, f(AI) = 0, where qt and qb are percent RATED THERMAL POWER in the top and bottom halves of the core respectively, and qt +
qb is total THERMAL POWER in percent of RATED THERMAL POWER.
(ii) for each percent that the magnitude of(qt - qb) exceeds -37 percent, the AT trip setpoint shall be automatically reduced by 2.52 percent of its value at RATED THERMAL POWER.
(iii) for each percent that the magnitude of(qt - qb) exceeds +15 percent, the AT trip setpoint shall be automatically reduced by 1.47 percent of its value at RATED THERMAL POWER.
(1) T' represents the cycle-specific Full Power Tavg value used in core design (576.2 'F).
BEAVER VALLEY - UNIT 2 4.1-6 COLR 13 Revision 49
BVPS-2 LICENSING REQUIREMENTS MANUAL Overpower AT Setpoint Parameter Values:
Parameter Value Overpower AT reactor trip setpoint K4*< 1.094 Overpower AT reactor trip setpoint Tavg rate/lag coefficient K5 > 0.02/°F for increasing average temperature K5 = 0/'F for decreasing average temperature Overpower AT reactor trip setpoint Tavg heatup coefficient K6 > 0.0021/°F for T > T" K6 = 0/'F for T _<T" Tavg at RATED THERMAL POWER T" < 580.0°F(')
Measured reactor vessel AT lead/lag time constants "C,= 0 sec*
(* The response time is toggled off to meet the analysis value of zero.) T2 = 0 sec*
Measured reactor vessel AT lag time constant T3 *--6 secs Measured reactor vessel average temperature lag time constant T6 < 2 secs Measured reactor vessel average temperature rate/lag time constant T7 Ž- 10 secs Specification 3.2.5 DNB Parameters Parameter Indicated Value Reactor Coolant System Tavg Tavg _< 583.6-F(2)
Pressurizer Pressure Pressure Ž 2214 psia(3)
Reactor Coolant System Total Flow Rate Flow >_267,300 gpm(4)
(1) T" represents the cycle-specific Full Power Tavg value used in core design (576.2 OF).
(2) The Reactor Coolant System (RCS) Tavg value includes allowances for rod control operation and verification via control board indication.
(3) The pressurizer pressure value includes allowances for pressurizer pressure control operation and verification via control board indication.
(4) The RCS total flow rate includes allowances for normalization of the cold leg elbow taps with a beginning of cycle precision RCS flow calorimetric measurement and verification on a periodic basis via control board indication.
BEAVER VALLEY - UNIT 2 4.1-7 COLR 13 Revision 49
BVPS-2 LICENSING REQUIREMENTS MANUAL 670 660 650 640 630 H620 610 600 590 580 0 0.2 0.4 0.6 0.8 1 1.2 1.4 FRACTION OF RATED THERMAL POWER Figure 4.1-5 REACTOR CORE SAFETY LIMIT THREE LOOP OPERATION (Technical Specification Safety Limit 2.1.1)
BEAVER VALLEY - UNIT 2 4.1-8 COLR 13 Revision 49
BVPS-2 LICENSING REQUIREMENTS MANUAL Table 4.1-1 (Page 1 of 2)
FQ Surveillance W(Z) Function versus Burnup Exclusion Axial Elevation 150 3000 10000 16000 Zone Point (feet) MWD/MTU MWD/MTU MWD/MTU MWD/MTU
- 1 12.00 1.0000 1.0000 1.0000 1.0000
- 2 11.80 1.0000 1.0000 1.0000 1.0000
- 3 11.60 1.0000 1.0000 1.0000 1.0000
- 4 11.40 1.0000 1.0000 1.0000 1.0000
- 5 11.20 1.0000 1.0000 1.0000 1.0000
- 6 11.00 1.0000 1.0000 1.0000 1.0000
- 7 10.80 1.0000 1.0000 1.0000 1.0000 8 10.60 1.2425 1.3243 1.2957 1.2379 9 10.40 1.2294 1.3089 1.2830 1.2268 10 10.20 1.2157 1.2912 1.2681 1.2233 11 10.00 1.2036 1.2737 1.2535 1.2178 12 9.80 1.1934 1.2603 1.2420 1.2115 13 9.60 1.1827 1.2557 1.2312 1.2033 14 9.40 1.1730 1.2534 1.2205 1.1992 15 9.20 1.1706 1.2464 1.2083 1.1985 16 9.00 1.1782 1.2374 1.1962 1.2000 17 8.80 1.1847 1.2348 1.1974 1.2021 18 8.60 1.1913 1.2342 1.2073 1.2098 19 8.40 1.1978 1.2317 1.2176 1.2209 20 8.20 1.2017 1.2267 1.2245 1.2300 21 8.00 1.2037 1.2194 1.2290 1.2364 22 7.80 1.2039 1.2152 1.2311 1.2402 23 7.60 1.2020 1.2110 1.2307 1.2416 24 7.40 1.1986 1.2045 1.2280 1.2405 25 7.20 1.1946 1.1972 1.2231 1.2372 26 7.00 1.1908 1.1905 1.2162 1.2316 27 6.80 1.1856 1.1825 1.2074 1.2240 28 6.60 1.1787 1.1728 1.1968 1.2147 29 6.40 1.1704 1.1619 1.1847 1.2033 30 6.20 1.1607 1.1498 1.1712 1.1903 31 6.00 1.1499 1.1362 1.1564 1.1805 32 5.80 1.1380 1.1237 1.1408 1.1712 Note: Top and Bottom 10% Excluded BEAVER VALLEY - UNIT 2 4.1-9 COLR 13 Revision 49
BVPS-2 LICENSING REQUIREMENTS MANUAL TABLE 4.1-1 (Page 2 of 2)
FQ Surveillance W(Z) Function versus Burnup Exclusion Axial Elevation 150 3000 10000 16000 Zone Point (feet) MWD/MTU MWD/MTU MWD/MTU MWD/MTU 33 5.60 1.1301 1.1129 1.1274 1.1618 34 5.40 1.1282 1.1062 1.1201 1.1561 35 5.20 1.1340 1.1099 1.1188 1.1565 36 5.00 1.1402 1.1145 1.1198 1.1563 37 4.80 1.1451 1.1176 1.1218 1.1561 38 4.60 1.1497 1.1206 1.1229 1.1575 39 4.40 1.1538 1.1232 1.1237 1.1584 40 4.20 1.1568 1.1260 1.1242 1.1584 41 4.00 1.1625 1.1303 1.1241 1.1576 42 3.80 1.1715 1.1353 1.1252 1.1559 43 3.60 1.1816 1.1395 1.1310 1.1539 44 3.40 1.1910 1.1435 1.1360 1.1516 45 3.20 1.1988 1.1471 1.1387 1.1483 46 3.00 1.2112 1.1579 1.1485 1.1511 47 2.80 1.2315 1.1786 1.1675 1.1675 48 2.60 1.2560 1.2033 1.1874 1.1862 49 2.40 1.2801 1.2281 1.2074 1.2047 50 2.20 1.3037 1.2527 1.2271 1.2229 51 2.00 1.3268 1.2769 1.2462 1.2406 52 1.80 1.3488 1.3001 1.2647 1.2576 53 1.60 1.3694 1.3220 1.2819 1.2736 54 1.40 1.3878 1.3418 1.2975 1.2883
- 55 1.20 1.0000 1.0000 1.0000 1.0000
- 56 1.00 1.0000 1.0000 1.0000 1.0000
- 57 0.80 1.0000 1.0000 1.0000 1.0000
- 58 0.60 1.0000 1.0000 1.0000 1.0000
- 59 0.40 1.0000 1.0000 1.0000 1.0000
- 60 0.20 1.0000 1.0000 1.0000 1.0000
- 61 0.00 1.0000 1.0000 1.0000 1.0000 Note: Top and Bottom 10% Excluded BEAVER VALLEY - UNIT 2 4.1-10 COLR 13 Revision 49
BVPS-2 LICENSING REQUIREMENTS MANUAL TABLE 4.1-2 FQ(Z) Penalty Factor versus Burnup Cycle Burnup FQ(Z)
MWD/MTU Penalty Factor 0 to 4300 1.02 4300 to 5000 1.0205 5000 to EOL 1.02 Note:
The Penalty Factor, to be applied to FQ(Z) in accordance with Technical Specification Surveillance Requirement 4.2.2.3, is the maximum factor by which FQ(Z) is expected to increase over a 39 Effective Full Power Day (EFPD) interval (surveillance interval of 31 EFPD plus the maximum allowable extension not to exceed 25% of the surveillance interval per Technical Specification Surveillance Requirement 4.0.2) starting from the burnup at which the FQ(Z) was determined.
BEAVER VALLEY - UNIT 2 4.1-11 COLR 13 Revision 49