MONTHYEARJAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0083, Notification of Readiness for NRC 95001 Inspection2021-09-0909 September 2021 Notification of Readiness for NRC 95001 Inspection JAFP-21-0081, Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-0303 September 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0075, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2021-08-12012 August 2021 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0073, Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance.2021-08-0909 August 2021 Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance. JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-21-0064, Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-07-0707 July 2021 Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0042, Reply to a Notice of Violation; EA-20-1382021-06-0303 June 2021 Reply to a Notice of Violation; EA-20-138 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs 2023-08-31
[Table view] |
Text
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. Fitzpatrick NPP S' Entergy P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840
. f-March 26, 2009 JAFP-09-0035 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Subject:
Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59 James A. FitzPatrick Nuclear Power Plant - Response to Request For Additional Information Regarding: Request For Additional Information Re:
Third Ten-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-01 (TAC NO. MD8717)
References:
- 1) Entergy Letter, JAFP-08-0038, James A. FitzPatrick Nuclear Power Plant Inservice Inspection Program Relief Requests Third Ten-year Interval Closeout (TAC No. MD8717), dated April 30, 2008.
- 2) USNRC Letter, James A. FitzPatrick Nuclear Power Plant - Response to Request For Additional Information Regarding: Request For Additional Information Re: Third 10-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-01 (TAC NO. MD8717), dated November 19, 2008.
- 3) Entergy Letter, JAFP-09-0008, James A. FitzPatrick Nuclear Power Plant -
Response to Request For Additional Information Regarding: Request For Additional Information Re: Third Ten-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-01 (TAC NO. MD8717)
Dear Sir or Madam:
Entergy Nuclear Operations Inc., (ENO) submitted James A. FitzPatrick Nuclear Power Plant Inservice Inspection Program Relief Requests Third Ten-year Interval Closeout, dated April 30, 2008 [Reference 1]. Subsequently ENO received James A. Fitzpatrick Nuclear Power Plant - Request for Additio nal Information Re: third 10-year Inservice Inspection Interval Program Plan Relief Request RR-CRV-01 (TAC No. MD8717), dated November 19, 2008
[Reference 2]. Entergy responded to the request for additional information on January 20, 2009 [Reference 3].
On February 20, 2009 the NRC staff in a telephone conference with the James A. FitzPatrick Nuclear Power Plant (JAF) staff requested a more detailed description of the lower head region welds where JAF did not achieve full examination coverage during the third Inservice kYM
JAFP-09-0035 Page 2 of 2
,nspection Interval. Although a verbal description was provided during the telephone conference this letter transmits a written description. The configuration of the welds, the amount of coverage, and the similarities between the inspected weld areas and the uninspected areas are described in Enclosure 1.
There is no new commitment made in this letter.
If you have any questions or require additional information, please contact Mr. Joseph Pechacek, Licensing Manager, at 315-349-6766.
Sincerely, Joseph Pechacek Licensing Manager Enclosure 1: Description of Lower-Head Welds and Third Inservice Inspection Interval Examination Coverage JP/ed cc:
Mr. Samuel J. Collins, Regional Administrator Mr. Bhalchandra Vaidya, Project U.S. Nuclear Regulatory Commission, Region Manager 475 Allendale Road Plant Licensing Branch King of Prussia, PA 19406-1415 U.S. Nuclear Regulatory Commission Mail Stop O-8-G 14 Office of NRC Resident Inspector Washington, DC 20555 James A. Fitzpatrick Nuclear Power Plant P.O. Box 136 Mr. Paul Eddy Lycoming, New York 13093 New York State Department of Public Services Mr. Paul Tonko, President 3 Empire State Plaza New York State Energy Research and Albany, New York 12223-1350 Development Authority 17 Columbia Circle Albany, New York 12203-6399.
JAFP-09-0035 Enclosure 1 Description of Lower-Head Welds And Third Inservice Inspection Interval Examination Coverage
JAFP-09-0035 Enclosure 1 Description of Lower-Head Welds and Third Inservice Inspection Interval Examination Coverage The lower-head area is shown in figures 2 through 7 of reference 2. The JAF reactor vessel bottom-head consists of one 8" dome segment (dollar plate), six 8" plate side segments containing the lower meridianal welds (not examined) and eight 4 1/8" plate side segments containing the upper meridianal welds (examination performed).
Construction of the reactor vessel bottom-head includes two circumferential welds; VC-BH-2-3 (dome segment to lower side segment, not examined) and VC-BH-1-2 (lower side segments to upper side segments, examination performed). There are 14 meridianal welds 6 between the lower side segments (VV-BH-2a through f, not examined) and 8 ,between the upper side segments (VV-BH-la through h, examination performed). RR-CRV-01 requests relief from examination of circumferential weld VC-BH-2-3 (dome segment to lower side segment (dollar plate weld)) and 6 meridianal welds VV-BH-2a through f (lower side segment welds). The head circumferential weld and the upper meridinal welds were examined.
Relief is being requested for the dollar plate weld and the lower meridinal welds. The vessel limiting conditions for examination identified in figures-2 through 7 are based on location, limited accessibility, and interferences. Only 2 of the 6 lower meridianal welds are located adjacent to the man way access holes. Examination of the welds was attempted in two outages with different vendors resulting in no coverage due to location and interferences.
The NRC Staff had previously identified that similar plants achieved coverage for the welds that are the subject of the JAF Relief Request. JAF engineering personnel contacted similar plants and found that the extent of coverage identified to the NRC is from outside of the skirt weld. JAF has identified coverage from outside of the skirt weld as "incidental coverage" and has not credited this coverage.
JAF engineering personnel contacted the EPRI personnel responsible for the Performance Demonstration Initiative (PDI) qualification of automated vessel weld inspection equipment.
Based on the discussion with EPRI, no vendors are currently known to perform automated examinations in the lower head CRD region on BWR's The vessel skirt area is opened for surface examination of CRD housing welds during the interval and accessible at the time to visual examination of the bottom head welds and CRD housings. In addition, VT-2 examinations are performed from the CRD platform to identify potential leakage from the CRD housings or areas above.
Approximately 64% of the total circumferential weld length and 64.8% of the total meridianal weld length (including incidental weld coverage) for the reactor vessel lower-head region is examined. The coverage achieved for the overall lower head provides reasonable assurance that degradation within the region would be identified.