Text

.

pa ar c g'o

-

UNITED ST ATES

t-NUi lie AR REGULATORY cot CSION 8 \\*

'

n

..,

$

REGION li

$.

. 8 101 M ARIE TT A sT., N W., SUIT E 3100

'

o, ' g.Q,.

'\\,

AT L AN T A, G EORGI A 30303

  • * " *

JUN 2 01979 In Reply Refer To:

RII:MJG 50-566/79-9 50-567/79-9 Tennessee Valley Authority Attn:

H. G. Parris Manoger of Power 500A Chestnut Street Tower II Chattanooga, Tennessee 37401 Gentlemen:

This refers to the inspection conducted by M. J. Gouge of this office on June 5-8, 1979 of activities authorized by NRC Construe: ion Permit Nos.

CPPR-172 and CPPR-173 for the Yellow Creek Nuclear Plart facility, Units 1 and 2, and to the discussion of our findings held with M. M.

Price at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license appear to be in noncompliance with NRC requirements. These items and references to pert inent requirements are listed in the Notice of Violation enclosed herewith as Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days of your receipt of this notice. a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved; (2) corrective steps which will be taken to asoid further noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full state-ment of the reasons on the basis of which it is claimed that the informa-tion is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

421 191

~

790806o2m

.

.

.

JUN 2 01979

.

Tennessee Valley Authority-2-Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely,

[< f//k'< 'f e

C. E. Murphy, Chie Reactor Construction and Engineering Branch Enclosures:

1.

Appendix A, Notice of Violation 2.

Inspection Report Nos. 50-566/79-9 and 50-567/79-9 cc w/ enclosures:

J. F. Cox 400 Commerce Street

'49D214 Knoxville, Tennessee 37902 M. M. Price, Project Manager Post Office Box 2000 Iuka, Mississippi 38852 D. L. Terrill, Project Engineer 400 Chestnut Street Tower II Chattanooga, Tennessee 37401 421 192