IR 05000566/1979015
| ML19253C507 | |
| Person / Time | |
|---|---|
| Site: | Yellow Creek |
| Issue date: | 10/23/1979 |
| From: | Cunningham A, Hufham J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19253C504 | List: |
| References | |
| 50-566-79-15, 50-567-79-15, NUDOCS 7912050666 | |
| Download: ML19253C507 (3) | |
Text
pn atouq'o
.
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION o
$
E
REGION II
.:
E o
101 MARIETTA ST., N.W., SUITE 3100 o
ATLANTA, G EORGIA 30303
.....
Report Nos.: 50-566/79-15 and 50-567/79-15 Licensee: Tennessee Valley Autnority 500A Chestnut Street Chattanooga, Tennessee 37401
.
Facility Name: Yellow Creek Nuclear Plant Docket Nos.: 50-566 and 50-567 License Nos.:
CPPR-172 and CPPR-173 IospectionatCha[nooga,TennesseeandnearIuka, Mississippi
.
1 1. L:,!? $
.
/l'Y
' /f Inspector:
-
/
A. L. Cunningham J/ '
D' ate Signed Approved by:
[
/~pflj
/b /j?
7h g.4RlX W. Huffiam, Section Chief, FFMS Branch Date S'igned SUMMARY Inspection on September 26-28, 1979 Areas Inspected This routine announced inspection involved 18 inspector-hours ensite in the areas of administrative controls, onsite meteorological measurements program; environmental protection program; and fuel storage.
Results Of the four areas inspected, no apparent items of noncompliance or deviations were identified.
1503 343 7912050hh
.
DETAILS 1.
Persons Contacted Licensee Employees M. M Price, Project Manager (YCNP)
G. Walker, Site Environmental Engineer
- R. Rainey, Jr., Environmental Quality Assura ce
- D. Dunn, Environmental Engineer, Regulatory Staff
- S.
R. Wells, Biologist
- R. H. Shell, Supervisor, Environmental Planning L. S. Cox, Construction Engineer (YCNP)
- Attended exit inter riew 2.
Exit Interview The inspection scope and findings were summarized on September 28, 1979 with those persons indicated in Paragraph I above.
3.
Licensee Action on Previous Inspection Findings There were no previous inspection findings.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Administrative Controls The Construction Permits require the licensee to implement a control program which includes written procedures and instructions and provision for periodic management audits to determine the adequacy of implementation of environmental conditions defined therein. The program Zurther requires the maintanance of sufficient records to furnish evidence of compliance with all environmental conditions and commitments. Detailed inspection and discussion with licensee representatives of the site environmental protection program, procedures (e.g., waste management, construction effects monitoring, erosion and runoff control), data, records, and reports disclosed that the programs appeared consistent with C,nstruction Permit requirements. There were no questions regarding this item.
6.
Plant Site Inspection The plant site was inspected to review and discuss with project management all commitments defined in the Construction Permits regarding environmental protection during plant construction and to verify that such commitments and requirements were being implemented.
Inspection 01sclosed that require-150L3 344
-2-
.
ments implemented were consistent with plant construction activities in progress. The following items were inspected:
(1) site holding ponds; (2)
spoil storage and borrow areas; (3) fuel, lubricant and chemical storage facilities; (4) barrel storage area; (5) construction waste storage area; (6) package sewage treatment plants; (7) concrete mixing and batch plants; (8) equipment and materials laydown are as; (9) air quality. There were no questions regarding this inspection item.
7.
Meteorological Measurements Program Inspection included review and discussion of the preoperational onsite meteorological measurements program and a tour of the meteorological facility.
Inspection disclosed that the program was implemented as defined in Section 6.1 of the Final Environmental Statement and in compliance with recommendations of applicable Regulatory Guides.
1503 345
.