IR 05000528/1992023
| ML17306B082 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/08/1992 |
| From: | Perkins K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17306B083 | List: |
| References | |
| NUDOCS 9211020043 | |
| Download: ML17306B082 (10) | |
Text
FORD I
.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9211020043 DOC.DATE: 92/10/08 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 t
STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi '5000530 AUTH.NAME AUTHOR AFFILIATION PERKINS,K.E.
Region 5 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION R
CONWAYPW.F.
Arizona Public Service Co. (formerly Arizona Nuclear Power SUBJECT: Forwards insp rept 50-528/92-23,50-529/92-23 6 50-530/92-23 on 920914-18.No violations noted.
DISTRIBOTION CODE'EOID COPIES RECEIVED'LTRl ENCL i SIZE'ITLE:
General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
S/
05000528F 05000529 05000530()
RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIB AEOD/TTC NRR MORISSEAUPD NRR/DLPQ/LPEB10 NRR/DREP/PEPB9H NUDOCS-ABSTRACT'GC/HDS1 RGN5 FILE
EXTERNAL EG&G/BRYCEPJ ~ HE NSIC COPIES LTTR ENCL
1
2
2
1
1
1
1
1
1
1
1
1 RECIPIENT ID CODE/NAME TRAMMELL,C AEOD AEOD/DSP/TPAB DEDRO NRR/DLPQ/LHFBPT NRR/DOEA/OEAB NRR/PMAS/ILRB12 E D~
REG FILE
'2 NRC PDR COPIES LTTR ENCL
1
1
1
1
1
1
1
1
1
1 NOTE TO ALL'RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
~y,4 4Egy Wp0 Cy UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIAONE WALNUTCREEK, CAUFORNIA94596-5368 October 8, 1992 Docket Nos.
50-528, 50-529, and 50-530 License Nos.
NPF-41, NPF-51, and NPF-74 Arizona Public Service Company P.O.
Box 53999, Station 9012 Phoenix, Arizona 85072-3999 Attention:
Hr.
W.
F.
Conway Executive Vice President, Nuclear SUBJECT:
NRC SPECIAL INSPECTION REPORT NO. 50-528/529/530/92-33 This refers to the special inspection conducted by H. Wang, R. Huey, L. Coblentz, and B. Rogers, on September 14 through '18, 1992.
The inspection involved a survey of activities authorized for your Palo Verde facility.
At the conclusion of the inspection, the findings were discussed with you and the members of your staff identified in the enclosed report.
This special inspection was unannounced.
It was conducted to gain a sense of the perceptions and attitudes of ~orkers at Palo Verde with regard to their ability to raise significant safety issues.
The inspection was conducted by interviewing a broad scope of non-supervisory employees selected by the NRC inspectors.
The employees selected by the inspectors included both Arizona Public Service Company (APS) direct employees and contractors.
We interviewed those employees performing work that appeared to be the most safety-significant.
We recognize that we did not interview all work groups at Palo Verde and we make no claim that our survey and interviews were all inclusive.
Based on these interviews, we found that most of the employees (92%)
interviewed felt free to raise significant safety issues to their supervisors, higher levels of APS management, the APS Employee Concerns Program (hotline),
and the NRC.
We found that 6% of those interviewed felt free to raise significant safety issues to their immediate supervisors, but they felt some reluctance to raise issues above their supervisors.
Our survey did not identify a consistent set of reasons for'hese individuals'eelings.
The remaining 2% of those interviewed felt some reluctance to raise significant safety concerns to their immediate supervisors.
While these results are not indicative of a widespread problem with reluctance of APS employees to raise significant safety issues to their immediate supervisors or above, they do indicate that the environment at Palo Verde for
, raising significant safety concerns can be improved.
Please advise us of your plans in this regard.
'F211020043 921008 PDR
- DOCK 05000528
PDR I
QCc I
Also, our letter and Notice of Violation and Proposed Imposition of Civil Penalties dated September 30, 1992, required you to address the actions you have taken to assess the extent to which your employees harbor reservations about raising safety concerns, and the actions you have taken to eliminate or minimize'hose reservations.
Finally, you should be aware that 5 employees who stated that they felt some reluctance to raise significant safety issues to their immediate supervisors or above, further stated that they had experienced retaliation in 1991 and 1992 for raising such issues.
The NRC is evaluating.each of these five cases to determine whether further action can or should be taken.
In accordance with 10 CFR Part 2.790 of the NRC's "Rules of Practice,"
a copy of this letter and the enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be glad to discuss them with you.
Sincerely e
K. E. Perkins, Jr., Director Divition of Reactor Safety and Projects Enclosure:
Inspection Report
Numbers 50-528/92-33,
50-529/92-33,
50-530/92-33
CC:
Mr. 0. Hark DeMichele,
Hr. James
H. Levine,
Hr.
R. Stevens,
Hr. S. Guthrie,
Hr. E.
C. Simpson,
Mr. Thomas
R. Bradish,
Hr. Robert
W. Page,
Hs.
Nancy
C. Loftin, Esq.,
Corporate Secretary
5. Corporate
Counsel,
Mr. Curtis L. Hoskins,
El
Paso Electric Company
Mr. James
A. Beoletto,
Esq., Assistant
Counsel,
Company
Hr. Charles
B. Brinkman,
Combustion Engineering,
Inc.
Hr. Aubrey V. Godwin, Director, Arizona Radiation Regulatory Agency
Chairman,
Haricopa
County Board of Supervisors
Hr. Steve
H. Olea, Chief Engineer,
Arizona Corporation
Commission
Hr.
Roy P.
Lessey, Jr.,
Esq., Akin, Gump, 'Strauss,
Hauer
and Feld
Hr. Bradley
W. Jones,
Esq., Akin, Gump, Strauss,
Hauer
and Feld
Hr. Jack
R.
Newman,
Esq.,
Newman
5 Holtzinger bcc w/enclosure:
Project Inspector
Resident
Inspector
Docket File
J. Hartin
B. Faulkenberry
G.
Cook
bcc w/o enclosure:
N. Smith
J. Zollicoffer
J. Bianchi
RV:jbS<~~
e
LCoblentz
BRogers
RHuey
10/
/92
10/
/92
10/$'/92
HWong
10/ 7/92
MBlume
10/7/92
Q
S
CO
S
CO
YES
NO
YES
NO
SRic
rds
KPe
i
s
10/ 5/92
2 i
CO
NO
S
COPY
S
NO
SEND TO
E
NO
E
NO
YES
CO
S
CO
NO
YES
NO
gpyQ7/fgp2
fQ:~
'REACTOR SAFETY.,8
518 975 83S6
bcc w/enclosure:
Pro)ect
Inspector
Res)dent
Inspector
Oocket File
J. Mart)n
B. Faulkenberry
G,
Conk
bcc w/o enclosure:
M.
Smooth
J, lo)1<coffer
J.
Blanch{
Rvljb
LCodlentz'
ers
]0(
/92
10/o'/92
RHuey
10/
/92
HMung
,10/
/92
MBlume
10/
/92
SR)chards
10/
/92
YES
NO
E
Kperkins
10/
/92
'n
28'd
82:ET 2667-L8-8~
18i87r'1992
12: 47
RV DIABLO CANYON
885 595 2355
P.82
bcc w/enclosure:
.Pro)act
inspector
Res dent inspector
bocket Ff)e
J, Hartfn
B, Faulkanberry
a.
cook
bcc w/o enclosure:
~, Smfth
J, Eollicoffar
J.
$)anchf
RY,'db
Lt'.oblentz
10/ 7/92
SR c ards
]0/
/02
BRogers
10/
/92
KPerkfns
l0/
/92
RHuey
10/
/92
~
HWong
10/
/92
E(UB
NBlume
10/
/92
~op
NO
s' ttt~
~)