IR 05000498/1979014

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-498/79-14 & 50-499/79-14
ML19257C227
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/11/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19257C228 List:
References
NUDOCS 8001250306
Download: ML19257C227 (1)


Text

-- C (8 'pa af og#'c UNITED STATES

,

EY

.'%

NUCLEAR REGULATORY COMMISSION 3,.['.

,/ E

REGION IV

.

g

  1. [

611 RYAN PLAZA DRIVE,sulTE 1000 e

AR LINGToN, TEXAS 76012

  • ..s January 11, 1980 In Reply Refer To:

RIV Docket No. 50-498/Rpt. 79-14 50-499/Rpt. 79-14 Houston Lighting and Power Company ATTN:

Mr. E. A. Turner, Vice President Power Plant Construction and Technical Services Post Office Box 1700 Houston, Texas 77001 Gentlemen:

Thank you for your letter of November 16, 1979, in response to our letter dated October 16, 1979, and the attached Notice of Violation.

As a result of our review, we find that additional information, as discussed with your Mr. L. D. Wilson on December 13, 1979, is needed.

Specifically, your response to item B should address steps taken to assure the implementation of recurrence control measures described in interoffice memo SQA-852, dated April 13, 1979.

Your response should also state the date when full compliance was or will be achieved.

You are requested to provide the additional information within twenty days of the receipt of this letter.

Should you have any questions regarding this matter, please contact this office.

Sincerely,

,

'l

!

J e.W.

C. Seidle, Chief I Reactor Construction and Engineering Support Branch 1803 293 8001250 3 O{