January 23, 2026

SUBJECT:

CALLAWAY PLANT - INTEGRATED INSPECTION REPORT 05000483/2025004

Dear Kent Scott:

On December 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Callaway Plant. On January 6, 2026, the NRC inspectors discussed the results of this inspection with J. Morton, Supervising Engineer, Regulatory Affairs, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ami N. Agrawal, Chief Reactor Projects Branch B Division of Operating Reactor Safety Docket No. 05000483 License No. NPF-30

Enclosure:

As stated

Inspection Report

Docket Number:

05000483

License Number:

NPF-30

Report Number:

05000483/2025004

Enterprise Identifier:

I-2025-004-0004

Licensee:

Union Electric Company

Facility:

Callaway Plant

Location:

Steedman, MO

Inspection Dates:

October 1 to December 31, 2025

Inspectors:

N. Brown, Senior Resident Inspector

J. Ellegood, Senior Resident Inspector

Approved By:

Ami N. Agrawal, Chief

Reactor Projects Branch B

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at the Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

The Callaway Plant began the inspection period at rated thermal power. On November 12, 2025, the licensee entered a forced outage due to secondary chemistry exceeding allowable limits following an inadvertent actuation of the auxiliary feedwater system. The unit was taken to Mode 5 where it remained until November 25 when plant startup was commenced. The plant was brought critical on November 29, the main generator was synchronized to the grid on November 30, and full power operations resumed on December 2. The plant remained at rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of cold temperatures on October 29, 2025.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)engineered safety features train B switchgear room HVAC on December 10, 2025 (2)component cooling water train B on December 17, 2025

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1)upper cable spreading room on October 15, 2025 (2)component cooling water train A and B pump and heat exchanger area, Fire Area A-16, Rooms 1401 and 1406 on October 20, 2025 (3)electrical penetration rooms A and B, Fire Areas A-17 and A-18, Rooms 1409 and 1410 on October 20, 2025

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during scheduled surveillances on October 3, 2025.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated continuing license training on October 21, 2025.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (4 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:

(1) Cycle 26 maintenance rule a(3) assessment (2)essential service water train A planned maintenance outage on October 18, 2025 (3)engineered safety features switchgear room HVAC maintenance on December 12, 2025 (4)component cooling water train A on December 18, 2025

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following structure, systems or component remains capable of performing its intended function:

(1) BB8157 A and B controller replacements

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)essential service water A planned maintenance outage on October 15, 2025

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)power range nuclear instrument SEN0044 on October 7, 2025 (2)residual heat removal pump train B on October 9, 2025 (3)emergency diesel generator A on November 6, 2025

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated forced outage 78 on November 12 through December 4, 2025.

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)

(1)essential service water train A on October 18, 2025 (2)auxiliary feedwater system after forced outage 78 on November 29, 2025 (3)engineered safety features train A switchgear room HVAC on December 12, 2025

Inservice Testing (IST) (IP Section 03.01) (2 Samples)

(1)residual heat removal train B inservice test on September 12, 2025

(2) turbine-driven auxiliary feedwater pump on October 27, 2025

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1)flex diesel generator checks on September 29, 2025

71114.06 - Drill Evaluation

Additional Drill and/or Training Evolution (1 Sample)

The inspectors evaluated:

(1) 2025 annual ERO drill on November 20, 2025

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) (1 Sample)

(1) October 1, 2024, through September 30, 2025

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)

(1) October 1, 2024, through September 30, 2025

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)

(1) October 1, 2024, through September 30, 2025

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1) July 1, 2024, through June 30, 2025

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1) July 1, 2024, through June 30, 2025 71152A - Annual Follow-up Problem Identification and Resolution

Annual Follow-up of Selected Issues (Section 03.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1)

  • fire water system

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program to identify potential trends in human performance that might be indicative of a more significant safety issue with emphasis on human performance errors during maintenance activities. The inspectors sampled a population of condition reports during the period of July 1 to December 31, 2025. Based on the samples reviewed, the inspectors identified seven instances where mispositioning occurred during maintenance activities and one example of late technical specification entry. While degradation was apparent in the implementation of the licensees human performance program, the licensees organization successfully identified these degradations before any harmful events occurred. The licensee independently identified this human performance trend, condition report 202506087 and condition report 202504781, and is taking appropriate actions to address the degraded conditions that were encountered during the inspection period.

71153 - Follow-Up of Events and Notices of Enforcement Discretion

Personnel Performance (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated an inadvertent auxiliary feedwater actuation and the licensees response on November 12, 2025.

Reporting (IP Section 03.05) (1 Sample)

The inspectors evaluated the following licensees event reporting determinations to ensure it complied with reporting requirements:

(1) inadvertent auxiliary feedwater actuation on November 13,

2025 INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 6, 2026, the inspectors presented the integrated inspection results to J. Morton, Supervising Engineer, Regulatory Affairs and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Condition Reports

2506430, 202506485

Procedures

OTS-ZZ-00007

Plant Cold Weather

71111.01

Work Orders

Jobs

24512302, 24511862

OSP-EG-0001B

Checklist 1

OTN-GK-00001

Checklist 1

OTN-GK-00001

Checklist 2

71111.04

Procedures

OTN-GK-00001

Checklist 3

Calculations

KC-133

Fire Safety Analysis Calculation: KC-133 Fire Area: C-22

Upper Cable Spreading Room

and 4

Miscellaneous

Fire Preplan Manual

OTO-KC-00001,

Addendum A-16

Auxiliary Building 2026' - General Area

OTO-KC-00001,

Addendum A-17

Auxiliary Building 2026' - South Electrical Penetration Room

OTO-KC-00001,

Addendum A-18

Auxiliary Building 2026' - North Electrical Penetration Room

71111.05

Procedures

OTO-KC-00001,

Addendum C-22

Control Building 2073' Upper Cable Spreading Room

LOCT 25-4 S-2

Control Room

Logs

10/03/2025

Miscellaneous

Training Plan

T61.0810 8

Procedures

OSP-BG-P005B

Centrifugal Charging Pump B Inservice Test - Group B

71111.11Q

Work Orders

Jobs

25509382

Calculations

GK-35

Determination of Allowable Number of Plugged Condenser

Tubes in SGK05A/B

Corrective Action

Documents

Condition Reports

2506181, 202506185, 202506178, 202506244,

2506252, 202507316, 202507319

Maintenance Rule Periodic Assessment for Cycle 26

71111.12

Miscellaneous

Maintenance Rule Periodic Assessment for Cycle 25

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Request for

Resolution

160775, 240255

EDP-ZZ-04600

Engineering Change Control

Procedures

ETP-ZZ-03050

Aging Management of Loss of Coating or Lining Integrity for

Internal Coatings

Work Orders

Jobs

16005247, 22509549, 24504980, 21504015, 24506069,

23500343, 24507347, 24506050, 24508677, 23500344,

245006113

Miscellaneous

Risk Informed Completion Time RICT-2025-05

71111.13

Procedures

APA-ZZ-00315

Risk Management Programs

Calculations

ARC-1589

Analysis of EDG System for Replacement of Valves

KJV0820 A & B

Corrective Action

Documents

Condition Reports

2505415, 202505687, 202506110, 202505465,

2506648

Drawings

M-22KJ03

Piping and Instrumentation Diagram Standby Diesel

Generator A Lube Oil System

71111.15

Work Orders

Jobs

255002751, 25507116, 25507851

Corrective Action

Documents

Condition Reports

2506942, 202506860, 202506893, 202506848,

2506849

OTG-ZZ-00001

Plant Heatup Cold Shutdown to Hot Standby

OTG-ZZ-00002

Reactor Startup - IPTE

71111.20

Procedures

OTG-ZZ-00003

Plant Startup Hot Zero Power to 30% Power - IPTE

Corrective Action

Documents

Condition Reports

2507352, 202505465, 202506456

OSP-AL-P00002

Turbine Driven Auxiliary Feedwater Pump Inservice Test -

Group B

Procedures

OSP-EF-P001A

ESW Train A Inservice Test

71111.24

Work Orders

Jobs

24506069, 25000814, 24506648, 24506058, 25502751,

25507116, 25507851, 24504980, 25511491, 25512379,

25509427, 24508790, 22510214

Miscellaneous

Drill Guide

25 Annual ERO Drill November 13, 2025, to December

18, 2025

71114.06

Procedures

EIP-ZZ-00101

Classification of Emergencies

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EIP-ZZ-00101,

Addendum 2

Emergency Action Level Technical Bases Document

Safety Injection Performance Indicator Data Sheets 7/1/2024

through 6/30/2025

Unplanned Scrams per 7000 Critical Hours Performance

Indicator Data Sheets 10/1/2024 through 9/30/2025

Unplanned Scrams with Complications Performance

Indicator Data Sheets 10/1/2024 through 9/30/2025

Unplanned Power Changes per 7000 Critical Hours

Performance Indicator Data Sheets 10/1/2024 through

9/30/2025

71151

Miscellaneous

Residual Heat Removal System Performance Indicator Data

Sheets 7/1/2024 through 6/30/2025

Calculations

KC-43

Code Compliance Evaluation NFPA-805, Performance

Based Standard for Fire Protection for Light Water Reactor

Electrical Generation Plants

Corrective Action

Documents

Condition Reports

2503755, 202503613, 202506133, 202506237

APA-ZZ-00700

Fire Protection Program

APA-ZZ-00703

Fire Protection Operability Criteria and Surveillance

Requirements

Procedures

EDP-ZZ-01101

Fire Protection Monitoring Program

71152A

Work Orders

Jobs

25002452, 25003998

OTG-ZZ-00005

Plant Shutdown 20% Power to Hot Standby

OTO-AC-00002

Turbine Vibrations

OTO-MA-00008

Rapid Load Reduction

71153

Procedures

OTO-SA-00001

ESFAS Verification and Restoration

46