November 20, 2014
SUBJECT:
CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2014404
Dear Mr. Diya:
On October 8, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Callaway Plant. The NRC inspectors discussed the results of this inspection with Mr. L. Graessle, Senior Director, Operations Support, and other members of your staff.
The inspector documented the results of this inspection in the enclosed inspection report.
NRC inspectors documented four findings of very low safety significance (Green) in this report.
Each of these findings involved violations of NRC requirements. Further, inspectors documented one licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating these violations as non-cited violations (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violations or significance of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at the Callaway Plant.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with a basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspectors at the Callaway Plant.
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/ David A. Holman for
Mark S. Haire, Branch Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No.: 50-483 License No.: NPF-30
Nonpublic Enclosure:
NRC Inspection Report 05000483/2014404 w/Attachment: Supplemental Information
cc w/enclosure:
Mr. Eric Olson Manager, Security Callaway Plant P.O. Office Box 620 Fulton, MO 65251
cc w/o enclosure: Electronic Distribution
ML14324A962 Entire Report ADAMS:
Publicly Available Non-Sensitive Keyword SUNSI Review By: DHolman Yes No Non-Publicly Available Sensitive MD 3.4 Non-Public A.3 Cover Letter Only ADAMS:
Publicly Available Non-Sensitive Keyword SUNSI Review By: DHolman Yes No Non-Publicly Available Sensitive RGN-002 OFFICE PSI:PSB1 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1
NAME DHolman/dch JBuchanan JRollins MHaire NOKeefe MHaire
SIGNATURE
/RA/
Email Email Email
/RA/
DAH for
DATE 11/20/14 11/20/14 11/03/14 11/19/14 11/20/14 11/20/14 Letter to Fadi Diya from Mark S. Haire, dated November 20, 2014
SUBJECT:
CALLAWAY PLANT - NRC INSPECTION REPORT 05000483/2014404
Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
CW Administrative Assistant (Dawn.Yancey@nrc.gov)
Distribution w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Jason.Kozal@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (Zachary.Hollcraft@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (John.Jandovitz@nrc.gov)