| Q | CCA | Title |
---|
05000483/FIN-2014002-03 | 2014Q1 | H.13 | Failure to Correct a Design Deficiency in Main Generator Bus Duct Cooling System |
05000483/FIN-2014002-02 | 2014Q1 | | Failure to Implement Corrective Actions to Preclude Repetition |
05000483/FIN-2014002-01 | 2014Q1 | | Inadequate Scaffold Procedure to Ensure Nearby Equipment is Not Impacted |
05000483/FIN-2014003-01 | 2014Q2 | | Plastic Shipping Plug in Rosemount Transmitter |
05000483/FIN-2014007-08 | 2014Q2 | H.3 | Inadequate Procedure for Cooling Instrumentation During a Station Blackout Event. |
05000483/FIN-2014007-07 | 2014Q2 | | Failure to Adequately Account for Motor Operated Valve Unseating Torque in Torque Calculation. |
05000483/FIN-2014007-06 | 2014Q2 | H.1 | Failure To Review Motor Operated Valve (MOV) Data and Complete Analysis of the Data in a Timely Manner |
05000483/FIN-2014003-02 | 2014Q2 | H.14 | Inadequate Extent of Condition Review |
05000483/FIN-2014007-01 | 2014Q2 | | Failure to Establish Adequate Procedures for Testing the Load Tap Changers on Transformers XNB01 and XNB02 |
05000483/FIN-2014007-02 | 2014Q2 | | 10 CFR 50.59 Screen for the Auxiliary Feedwater Motor Operated Control Valves Thermal Overload Relays |
05000483/FIN-2014007-03 | 2014Q2 | | Failure to Follow Procedures by Not Identifying a Conflict Between Two Procedures |
05000483/FIN-2014007-04 | 2014Q2 | | Failure to Establish Essential Service Water Pump House Supply Fan Testing. |
05000483/FIN-2014007-05 | 2014Q2 | P.1 | Failure to Adequately Analyze Maximum Electrical Equipment Temperatures Resulting from the Single Failure of Control Building Heating Ventilation/Air Conditioning |
05000483/FIN-2014008-03 | 2014Q3 | | Emergency Diesel Generator Operability Evaluations using 7 Day Mission Time |
05000483/FIN-2014004-01 | 2014Q3 | H.8 | Failure to Perform Nondestructive Testing on Essential Service Water Piping in Accordance with Procedures |
05000483/FIN-2014405-03 | 2014Q3 | | Security |
05000483/FIN-2014405-02 | 2014Q3 | | Security |
05000483/FIN-2014405-01 | 2014Q3 | | Security |
05000483/FIN-2014004-02 | 2014Q3 | H.12 | Failure to Verify Material Properties Prior to Installation |
05000483/FIN-2014406-01 | 2014Q3 | | Security |
05000483/FIN-2014008-02 | 2014Q3 | P.2 | Failure to Analyze for Tornado Missile Strike on Turbine Driven Auxiliary Feedwater Steam Exhaust Piping |
05000483/FIN-2014008-01 | 2014Q3 | H.5 | Failure to Follow Operability Procedure |
05000483/FIN-2014404-01 | 2014Q4 | | Security |
05000483/FIN-2014404-02 | 2014Q4 | | Security |
05000483/FIN-2014404-03 | 2014Q4 | | Security |
05000483/FIN-2014404-04 | 2014Q4 | | Security |
05000483/FIN-2014005-01 | 2014Q4 | P.2 | Failure to Correct a Condition Adverse to Quality on Safety Related Equipment |