ML20136H535
| ML20136H535 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 11/19/1985 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20136H540 | List: |
| References | |
| NUDOCS 8511250130 | |
| Download: ML20136H535 (2) | |
See also: IR 05000461/1985057
Text
1
,
MM
,
,
(
o n e r- n .or n n n me nm a amm
Ons t u w u w v An u v ouvassiav 11
i
'
'
NOV 191985
Docket No. 50-461
Illinois Power Company
I
ATTN: Mr. W. C. Gerstner
f
Executive Vice President
l
500 South 27th Street
'
Decatur, IL 62525
Gentlemen:
This refers to the announced preoperational physical protection inspection
conducted by Mr. G. L. Pirtle of this office on October 30 through
November 1, 1985, of activities at the Clinton Power Station authorized by
NRC Construction Permit No. CPPR-137 and to the discussion of our findings
with Messrs. J. Polchak and F. Timmons at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
(
inspection.
The enclosed report contains certain findings which must be
)
corrected and/or resolved prior to fuel load. The status and completion of
!
these findings will be monitored during future preoperational inspections.
No
written response is required at this time.
!
!
It is our understanding that the date for full implementation of the security
program has been changed to December 13, 1985. We have requested an
implementation schedule be sent to us as discussed in Paragraph 3 of the Report
l
Details.
l
I
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Section 73.21(c)(2) of the NRC's " Rules of
Practice," Part 73, Title 10, Code of Federal Regulations. This information
t
must be handled and protected in accordance with the provisions of 10 CFR 73.21.
i i
Consequently, our report of this inspection will not be placed in the Public
Document P,oom.
l
f
JV
Enclosure contains
ag12 D K
00 61
SAFEGUARDS INFORMATION
h
Upon Separation this
page is Decontrolled
t
g.-
nginnnn
n
nnu n-
n y
vii
butuiUG
ili
Vi\\ikill
'
s
7
,
,
.
narin.-
-
-
---
---.
ku uuuMKJB IN -Uti VlaiIVB
Illinois Power Company
2
NOV 191985.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
welb
W. L. Axelson, Chief
Nuclear Materials Safety
and Safeguards Branch
Enclosure:
Inspection Report
No. 50-461/85057(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosure:
IE File
IE/DI/0RPB
IE/ES
NMSS/SGPL
NRR/DL/SSPB
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
Gary N. Wright, Manager
Nuclear Facility Safety
Jean Foy, Prairie Alliance
Mark Jason, Assistant
Attorney General,
Environmental Control Division
H. S. Taylor, Quality Assurance
Division
RIII
RIII
RIII
RIII
(N
M
Rflefr/
Sp
Pt
e/rr
geed
Jablonshi
Axe son
ll////7T
Enclosure contains
f
i
9/85
SAFEGUARDS INFORMATION
Upon separation this
lled
e n.
- ni1 A nno IM CAGMI\\~I@page is Decontro
,
w u, ,, w v . . . - . . . .
-