ML20136H535

From kanterella
Jump to navigation Jump to search
Forwards Preoperational Physical Protection Insp Rept 50-461/85-57 on 851030-1101.No Violations Noted
ML20136H535
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/19/1985
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20136H540 List:
References
NUDOCS 8511250130
Download: ML20136H535 (2)


See also: IR 05000461/1985057

Text

1

,

MM

,

,

(

o n e r- n .or n n n me nm a amm

Ons t u w u w v An u v ouvassiav 11

i

'

'

NOV 191985

Docket No. 50-461

Illinois Power Company

I

ATTN: Mr. W. C. Gerstner

f

Executive Vice President

l

500 South 27th Street

'

Decatur, IL 62525

Gentlemen:

This refers to the announced preoperational physical protection inspection

conducted by Mr. G. L. Pirtle of this office on October 30 through

November 1, 1985, of activities at the Clinton Power Station authorized by

NRC Construction Permit No. CPPR-137 and to the discussion of our findings

with Messrs. J. Polchak and F. Timmons at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

(

inspection.

The enclosed report contains certain findings which must be

)

corrected and/or resolved prior to fuel load. The status and completion of

!

these findings will be monitored during future preoperational inspections.

No

written response is required at this time.

!

!

It is our understanding that the date for full implementation of the security

program has been changed to December 13, 1985. We have requested an

implementation schedule be sent to us as discussed in Paragraph 3 of the Report

l

Details.

l

I

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Section 73.21(c)(2) of the NRC's " Rules of

Practice," Part 73, Title 10, Code of Federal Regulations. This information

t

must be handled and protected in accordance with the provisions of 10 CFR 73.21.

i i

Consequently, our report of this inspection will not be placed in the Public

Document P,oom.

l

f

JV

Enclosure contains

ag12 D K

00 61

SAFEGUARDS INFORMATION

h

PDR

Upon Separation this

page is Decontrolled

t

g.-

nginnnn

n

nnu n-

n y

vii

butuiUG

ili

Vi\\ikill

MR

'

s

7

,

,

.

narin.-

-

-

---

---.

ku uuuMKJB IN -Uti VlaiIVB

Illinois Power Company

2

NOV 191985.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

welb

W. L. Axelson, Chief

Nuclear Materials Safety

and Safeguards Branch

Enclosure:

Inspection Report

No. 50-461/85057(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosure:

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosure, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

Gary N. Wright, Manager

Nuclear Facility Safety

Jean Foy, Prairie Alliance

Mark Jason, Assistant

Attorney General,

Environmental Control Division

H. S. Taylor, Quality Assurance

Division

RIII

RIII

RIII

RIII

(N

M

Rflefr/

Sp

Pt

e/rr

geed

Jablonshi

Axe son

ll////7T

Enclosure contains

f

i

9/85

SAFEGUARDS INFORMATION

Upon separation this

lled

e n.

ni1 A nno IM CAGMI\\~I@page is Decontro

,

w u, ,, w v . . . - . . . .

-