Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. T. M. Tongue,
T. E. Taylor, R. M. Lerch, G. A. VanSickle, J. A. Gavula and F. A. Maura of
this office from April 10 through May 28, 1988, of activities at the Braidwood
Station, Units 1 and 2, authorized by NRC Operating Licenses No. NPF-72,
No NPF-75, and No. NPF-77 and to the discussion of our findings with
Mr. R. E. Querio and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the
inspection.
Within these areas, the inspection consisted of a selective examin-
aticn of procedures and representative records, observations, and interviews
with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as described in the enclosed Notice.
With iespect to item
b, the inspection showed that action had been taken to correct the identified
violation and to prevent recurrence. Our understanding of your corrective
actions is described in Paragraph 11 v' the enclosed inspection report.
Consequently, no reply to the violation is required, and we have no further
questions regarding this matter at this time.
Regarding the remaining item, a written response is required.
In accordance with 10 CFR 2.790 of the Conmission's regulations, 3 copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
gu\\
4
'
k\\
8806200167 880615
ADOCK 05000456
Q
-
-
,
,
J ..
.
.
$t'
Commonwealth Edison Company
2
JON 15 1989
'
,
.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
OPJCINAL SIGNE.D SY Lu et. Anv
William L. Forney, Chief
Reactor Projects Branch 1
Enclosures:
1.
2.
Inspection Report
No.50-456/88013(DRP);
No. 50-457/88014(DRP)
cc w/ enclosures:
T. J. Maiman, Vice President,
PWR Operations
H. Bliss, Nuclear
Licensing Manager
S. Hunsader, Manager of Projects
M. Lohmann, Project Construction
and Startup SJperintendent
R. E. Querio, Station Manager
P. L. Barnes, Regulatory
Assurance Su
DCD/DCB (RIDS)pervisor
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
D. W. Cassel, Jr., Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, 0GC
G. Berry, OGC
Stephen P. Sands, NRR
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
The Honorable Ivan W. Smith, ASLB
The Honorable Gary J. Edles, ASLAP
The Honorable Dr. W. Reed Johnson, ASLAP
l
The Honorable Christine N. Kohl, ASLAP
gju
II
RIII
R}lk'
i fj;yf:
RII;/
RIII
RIII
RIII
G*
- f
k:' ra phi
Forney
e
iVanSickle/jp
G3vula
Lerch
GlIllU
}l/.QkY
IlN
(
VI
(S
,