Security Baseline Inspection Report 05000454/2025420 and 05000455/2025420
ML25343A344
Person / Time
Site: Byron  
Issue date: 12/15/2025
From: Clark J
Security Performance Evaluation Branch
To: Mudrick C
Constellation Energy Generation
Shared Package
ML25343A335 List:
References
ML25343A335 IR 2025420
Download: ML25343A344 (0)


Text

SUBJECT:

BYRON STATION - SECURITY BASELINE INSPECTION REPORT 05000454/2025420 AND 05000455/2025420

Dear Christopher H. Mudrick:

On September 25, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station and discussed the results of this inspection with Harris Welt and other members of your staff. The results of this inspection are documented in the enclosed report.

Due to the temporary cessation of government operations, which commenced on October 1, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at reduced staffing levels throughout the duration of the shutdown. However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300.

On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations. However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 07, 2025, to December 23, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

December 15, 2025

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000454 and 05000455

License Numbers:

NPF-37 and NPF-66

Report Numbers:

05000454/2025420 and 05000455/2025420

Enterprise Identifier:

I-2025-420-0012

Licensee:

Constellation Nuclear

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

July 21, 2025, to September 26, 2025

Inspectors:

C. Roundtree, Team Leader, NSIR

K. Hussar, Senior Physical Security Inspector, RI

C. Bustamante, Physical Security Inspector, NSIR

S. Cavanaugh, Physical Security Inspector, RIII

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126316.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 25, 2025, the inspectors presented the security baseline inspection results to Harris Welt and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.03

Corrective Action

Documents

AR #04680358

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04876887

06/26/2025

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04884454

07/22/2025

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04884455

07/22/2025

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04884723

07/23/2025

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04885287

07/24/2025

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04885291

07/24/2025

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04890676

08/07/2025

71130.03

Corrective Action

Documents

AR 04894952

09/03/2025

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Resulting from

Inspection

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04899129

09/18/2025

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04900097

09/23/2025

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04900105

09/23/2025

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04900408

09/15/2025

71130.03

Corrective Action

Documents

Resulting from

Inspection

AR 04900429

09/24/2025

71130.03

Miscellaneous

EP-AA-1002

Addendum 3

Hot Matrix Recognition Category Hazards and other

Conditions Affecting Plant Safety

Revision 6

03/2022

71130.03

Miscellaneous

RPTADMIN2 -

0806637

Zone Alarm History by Clear Code

07/24/2025

71130.03

Miscellaneous

RPTADMIN2 -

1107180

Card Alarm History by Clear Code

07/22/2025

71130.03

Miscellaneous

Security Aid 001

Zone Map CAS/SAS/BRE/OCA Patrol

Revision 7

71130.03

Miscellaneous

Security Aid 017

MUX Device Reference

Revision 4

71130.03

Miscellaneous

Security Aid 089

Camera Information

Revision 1

71130.03

Miscellaneous

SY-AA-101-122-

2

Section 4.4 Early Warning Detection Systems (EWS)

Revision 0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.03

Miscellaneous

SY-AA-101-122-

104-F-03

Lighting Test Log

Revision 0

71130.03

Miscellaneous

SY-AA-101-124

Operation of the Security Control Centers

Revision 16

71130.03

Miscellaneous

SY-BY-101-116-

1002-F-01

Vehicle Patrol Protected Area Barrier Patrol Checklist

Revision 10

71130.03

Miscellaneous

SY-BY-101-116-

1002-F-01

Vehicle Patrol Protected Area Barrier Patrol Checklist

Revision 10

71130.03

Miscellaneous

SY-BY-101-116-

1002-F-03

Foot Patrol Plant Checks: Turbine Building Checklist and

Auxiliary Building Checklist

Revision16

71130.03

Procedures

25 Byron Protective Strategy Notes

Revision 1

05/30/2025

71130.03

Procedures

Byron Nuclear Power Station Security Plan, Training and

Qualification Plan, Safeguards Contingency Plan,

Independent Spent Fuel Storage Installation Security

Program

Revision 20

2/2025

71130.03

Procedures

EWS Zones and Culverts

71130.03

Procedures

Map Overlays

71130.03

Procedures

RAMCAP Byron Blast Overlay

71130.03

Procedures

Communications

71130.03

Procedures

PA Buildings

71130.03

Procedures

Security Vehicles

71130.03

Procedures

PA & OCA Driving Paths

71130.03

Procedures

Planned Security Upgrades

05/25/2025

71130.03

Procedures

Security Equipment

71130.03

Procedures

Staffing by Position

71130.03

Procedures

Table of Security Personnel

71130.03

Procedures

25 Limited Scope FOF Triennial Work Up

Revision 0

71130.03

Procedures

Year Training Plan 2025-27

71130.03

Procedures

Mock Adversary Force Mission Planning RFI

71130.03

Procedures

Overhead Pictures

71130.03

Procedures

Maps

71130.03

Procedures

0B0A Security - 1

Security Threat Unit 0

Revision 18

71130.03

Procedures

Policy No: 600-04

Byron Operating Department Policy Statement

Revision 35

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2/21/2018

71130.03

Procedures

SY-BY-101-501

Byron Supplemental Safeguards Contingency Response

Plan Final

Revision 10

2/23/2023

71130.03

Procedures

SY-BY-101-502

Target Sets Draft

Revision 7

05/29/2025

71130.03

Procedures

SY-BY-101-502

Target Sets Final 6-CCS

07/12/2024

ML25343A335; Ltr ML25343A344

OFFICE

NSIR/DSO/SPEB

R-III/DRS/PSB

NSIR/DSO/SPEB

/ETA

NSIR/DSO/SPEB

/ETA

NAME

CBustamante

MZiolkowski

CRoundtree

JClark

DATE

Dec 11, 2025

Dec 11, 2025

Dec 15, 2025

Dec 15, 2025