IR 05000445/2008401

From kanterella
Jump to navigation Jump to search
IR 05000445-08-401, IR 05000446-08-401, on 01/14/2008 - 01/17/2008, Comanche Peak, Steam Electric Station, Units 1 and 2, Security Inspection - Letter Only
ML080320512
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/01/2008
From: Shannon M
Plant Support Branch Region IV
To: Blevins M
Luminant Generation Co
References
IR-08-401
Download: ML080320512 (2)


Text

L UNITED STATES NU CLE AR RE GU LATOR Y C O M M I S S I O N ary 1, 2008

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000445/2008401 AND 05000446/2008401

Dear Mr. Blevins:

On January 17, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Comanche Peak Steam Electric Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 17, 2008, with Mr. R. Flores, Site Vice-President, and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. Luminant Generation Company LLC 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response, Security-Related Information-Withhold Under 10 CFR 2.390, and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/JRL1 for Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-445, 50-446 Licenses: NPF-87, NPF-89 Nonpublic Enclosure:

Inspection Report 05000445/2008401 and 05000446/2008401 w/Attachment: Supplemental Information cc w/o enclosure:

Fred W. Madden, Director Regulatory Affairs Luminant Generating Company, LLC P.O. Box 1002 Glen Rose, TX 76043