IR 05000443/2015403

From kanterella
Jump to navigation Jump to search
IR 05000443/2015403; 6/8/2015 to 6/12/2015; Seabrook Station, Unit 1; Baseline Security Inspection (Letter Only)
ML15176A333
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/25/2015
From: Anthony Dimitriadis
Plant Support Branch 1
To: Dean Curtland
NextEra Energy Seabrook
References
IR 2015403
Download: ML15176A333 (4)


Text

UNITED STATES une 25, 2015

SUBJECT:

SEABROOK STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000443/2015403

Dear Mr. Curtland:

On June 12, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Seabrook Station, Unit 1. The NRC inspectors discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-443 License No. NPF-86 Enclosure:

Inspection Report 05000443/2015403 w/Attachment: Supplemental Information cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI:

M. Ossing, Licensing Manager J. Giarrusso, Division Chief, MA Emergency Management Agency P. Plummer, Director and State Liaison Officer, New Hampshire ML15176A333 (Cover letter)

ADAMS ACCESSION NUMBER: ML15176A330 (Cover letter w/enclosure)

Cover Letter: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME KHussar DEverhar/JR JCherubini/JRB GDentel ADimitriadis DATE 6/22/15 6/22/15 6/22/15 6/24/15 6/25/15 Distribution w/o encl; w/o OUO-SRI:

D. Dorman, RA (R1ORAMAIL Resource)

D. Lew, DRA (R1ORAMAIL Resource)

H. Nieh, DRP (R1DRPMAIL Resource)

M. Scott, DRP (R1DRPMAIL Resource)

R. Lorson, DRS (R1DRSMAIL Resource)

J. Trapp, DRS (R1DRSMAIL Resource)

G. Dentel, DRP R. Barkley, DRP M. Draxton, DRP C. Highley, DRP P. Cataldo, DRP, SRI C. Newport, DRP, RI A. Cass, DRP, AA K. MorganButler, RI, OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource Distribution w/encl; w/OUO-SRI:

A. Dimitriadis, DRS J. Cherubini, DRS G. Dentel, DRP P. Cataldo, SRI C. Johnson, NSIR N. Simonian, NSIR E. Wharton, NSIR B. Desai, DRS, RII S. Orth, DRS, RIII M. Haire, DRS, RIV