IR 05000443/2006015
ML062640463 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 08/25/2006 |
From: | Paul Krohn Division Reactor Projects I |
To: | St.Pierre G Florida Power & Light Co |
References | |
IR-06-015 | |
Download: ML062640463 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ust 25, 2006
SUBJECT:
SEABROOK STATION - NRC INSPECTION REPORT 05000443/2006015
Dear Mr. St. Pierre:
On July 17, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Seabrook Station. The enclosed inspection report documents the inspection results, which were discussed on July 18, 2006, with Mr. M. Kiley and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Warning: Violation of Section 147 of the Atomic Energy DETERMINATION Act, Safeguards Information, is subject to civil and MADE BY:
criminal penalties. NAME/TITLE: Barry C. Westreich, Chief ORGANIZATION: NSIR/DNS/SOS BASIS: 2/25/02 NRC Order SIGNATURE: /RA/ 5/12/06 G. S In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely,
/RA/
Paul Krohn, Chief Engineering Branch 6 Division of Reactor Projects Docket No. 50-443 License No. NPF-86 Enclosure: NRC Inspection Report 05000443/2006015 ( )
cc w/o encl:
M. Kiley, Plant General Manager - Seabrook Station J. M. Peschel, Manager - Regulatory Programs cc w/encl; w/SGI:
R. White, Security Manager, Seabrook Station J. A. Stall, FPL Senior Vice President, Nuclear & CNO J. Giarrusso, Office of Massachusetts Emergency Management Agency, State Liaison Officer and Homeland Security Advisor for the Commonwealth of Massachusetts M. Nawoj, State of New Hampshire Homeland Security and Emergency Preparedness