|
---|
Category:Inspection Report
MONTHYEARIR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 IR 05000443/20220062023-03-0101 March 2023 Annual Assessment Letter for Seabrook Station (Report 05000443/2022006) IR 05000443/20234022023-02-21021 February 2023 Security Baseline Inspection Report 05000443/2023402 (Cover Letter Only) IR 05000443/20220042023-01-30030 January 2023 Integrated Inspection Report 05000443/2022004 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2022001 ML22339A2312022-12-19019 December 2022 Review of the Fall 2021 Steam Generator Tube Inspections IR 05000443/20220102022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000443/2022010 IR 05000443/20220032022-11-22022 November 2022 Reissued Integrated Inspection Report 05000443/2022003 ML22304A1002022-11-0101 November 2022 Integrated Inspection Report 05000443/2022003 IR 05000443/20225022022-09-28028 September 2022 Emergency Preparedness Inspection Report 05000443/2022502 IR 05000443/20220052022-08-31031 August 2022 Updated Inspection Plan for Seabrook Station (Report 05000443/2022005) IR 05000443/20220022022-08-11011 August 2022 Integrated Inspection Report 05000443/2022002 IR 05000443/20224012022-07-0707 July 2022 Security Baseline Inspection Report 05000443/2022401 (Cover Letter Only) IR 05000443/20225012022-05-13013 May 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2022501 IR 05000443/20220012022-05-0202 May 2022 Integrated Inspection Report 05000443/2022001 IR 05000443/20220112022-03-22022 March 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000443/2022011 IR 05000443/20210062022-03-0202 March 2022 Annual Assessment Letter for Seabrook Station, Unit 1 (Report 05000443/2021006) IR 05000443/20210042022-02-10010 February 2022 Integrated Inspection Report 05000443/2021004 IR 05000443/20210032021-11-10010 November 2021 Integrated Inspection Report 05000443/2021003 IR 05000443/20210052021-09-0101 September 2021 Updated Inspection Plan for the Seabrook Station (Report 05000443/2021005) IR 05000443/20215012021-08-24024 August 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2021501 IR 05000443/20214022021-08-23023 August 2021 Material Control and Accounting Program Inspection Report 05000443/2021402 (Letter Only) IR 05000443/20210022021-08-11011 August 2021 Integrated Inspection Report 05000443/2021002 IR 05000443/20210012021-05-0404 May 2021 Integrated Inspection Report 05000443/2021001 IR 05000443/20210102021-04-20020 April 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000443/2021010 IR 05000443/20214012021-04-0606 April 2021 Security Baseline Inspection Report 05000443/2021401 (Letter Only) IR 05000443/20200062021-03-0303 March 2021 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2020006) IR 05000443/20200042021-02-0202 February 2021 Integrated Inspection Report 05000443/2020004 IR 05000443/20210132021-01-20020 January 2021 Information Request to Support Triennial Baseline Design-Basis Capabilities of Power-Operated Valves Inspection; Inspection Reportt 05000443/2021013 IR 05000443/20200102020-12-0101 December 2020 Biennial Problem Identification and Resolution Inspection Report 05000443/2020010 IR 05000443/20204202020-11-10010 November 2020 Security Inspection Report 05000443/2020420 FOF Report IR 05000443/20200032020-11-0505 November 2020 Integrated International Report 05000443/2020003 SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report IR 05000443/20203012020-09-17017 September 2020 Initial Operator Licensing Examination Report 05000443/2020301 IR 05000443/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000443/2020005) IR 05000443/20200012020-04-29029 April 2020 Integrated Inspection Report 05000443/2020001 and Independent Spent Fuel Storage Installation (ISFSI) Report No. 07200063/2020001 IR 05000443/20204012020-03-10010 March 2020 Security Baseline Inspection Report 05000443/2020401 and Independent Spent Fuel Storage Installation Security Inspection Report 07200063/2020401(Letter Only) IR 05000443/20190062020-03-0303 March 2020 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2019006) IR 05000443/20190042020-02-0505 February 2020 Integrated Inspection Report 05000443/2019004 IR 05000443/20194032019-11-25025 November 2019 Cyber Security Inspection Report 05000443/2019403 (Cover Letter Only) IR 05000443/20190032019-11-0505 November 2019 Integrated Inspection Report 05000443/2019003 IR 05000443/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000443/2019005) 2023-09-08
[Table view] |
Text
ber 3, 2002
SUBJECT:
SEABROOK STATION - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT NO. 50-443/02-009
Dear Mr. Feigenbaum:
On July 26, 2002, NRC completed a triennial fire protection team inspection at your Seabrook Generating Station. The enclosed report documents the inspection findings which were discussed at an exit meeting on July 26, 2002, with Mr. J. Peschel and other members of the North Atlantic Energy Service Company staff.
This inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions regulations and with the conditions of your license. The purpose of the inspection was to evaluate your post-fire safe shutdown capability and fire protection program. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
This inspection was a reduced scope inspection in accordance with the March 23, 2001, revision to IP 71111.05, Fire Protection. Issues regarding equipment malfunction due to fire-induced failures of associated circuits were not specifically inspected as a result of the criteria for review of fire-induced circuit failures currently being the subject of a voluntary industry initiative.
Ted In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ADAMS.html (the Public Electronic Reading Room).
Sincerely,
/RA/
James C. Linville, Chief Electrical Branch Division of Reactor Safety Docket No. 50-443 License No. NPF-86 Enclosure: NRC Inspection Report 50-443/02-009 cc w/encl:
B. D. Kenyon, President and Chief Executive Officer J. M. Peschel, Manager - Regulatory Programs G. F. St. Pierre, Station Director - Seabrook Station D. G. Roy, Nuclear Training Manager - Seabrook Station W. J. Quinlan, Esquire, Assistant General Counsel D. Bliss, Director, New Hampshire Office of Emergency Management D. McElhinney, RAC Chairman, FEMA RI, Boston, Mass R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire D. Brown-Couture, Director, Nuclear Safety, Massachusetts EmergencyManagement Agency F. W. Getman, Jr., President and Chief Executive Office, BayCorp Holdings, LTD R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts M. Metcalf, Seacoast Anti-Pollution League D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States W. Meinert, Nuclear Engineer, Massachusetts Municipal Wholesale Electric company S. Allen, Polestar Applied Technology, Incorporated R. Shadis, New England Coalition Staff
Ted