IR 05000440/2019412

From kanterella
Jump to navigation Jump to search
Material Control and Accounting Program Inspection Report 05000440/2019412
ML20035D726
Person / Time
Site: Perry 
Issue date: 01/31/2020
From: Billy Dickson
NRC/RGN-III/DRP/B2
To: Payne F
FirstEnergy Nuclear Operating Co
References
IR 2019412
Download: ML20035D726 (7)


Text

January 31, 2020

SUBJECT:

PERRY NUCLEAR POWER PLANT - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000440/2019412

Dear Mr. Payne:

On December 20, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant. On December 23, 2019, the NRC inspectors discussed the results of this inspection with Mr. B. Blair, Plant General Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA by Ann Marie Stone for/

Billy C. Dickson, Jr, Chief Branch 2 Division of Reactor Projects

Docket No. 05000440 License No. NPF-58

Enclosure:

As stated

Inspection Report

Docket Number:

05000440

License Number:

NPF-58

Report Number:

05000440/2019412

Enterprise Identifier: I-2019-412-0022

Licensee:

FirstEnergy Nuclear Operating Company

Facility:

Perry Nuclear Power Plant

Location:

Perry, OH

Inspection Dates:

December 09, 2019 to December 20, 2019

Inspectors:

J. Steffes, Senior Resident Inspector

Approved By:

Billy C. Dickson, Jr, Chief

Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a material control and accounting program inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.11 - Material Control and Accounting (MC&A)

An NRC inspector evaluated the Material Control and Accountability program at the Perry Nuclear Power Plant through completion of the following IP elements:

Material Control and Accounting (MC&A) (15 Samples)

(1) Special Nuclear Material Records (3 Samples)
(2) Material Control and Accounting Programs and Procedures (2 Samples)
(3) Physical Inventory of Special Nuclear Material (8 Samples)
(4) Special Nuclear Material Reports (1 Sample)
(5) Problem Identification and Resolution (1 Sample)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On December 23, 2019, the inspectors presented the material control and accounting program inspection results to Mr. B. Blair, Plant General Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.11

Corrective Action

Documents

2019-02005

MS-C-19-03-30: Finding Failure to Meet the Corrective

Action Requirements of 10 CFR 72.172 and Instruction

Requirements of 10 CFR 72.150 on Documenting Equipment

Failures During the Spent Fuel Dry Storage Campaign #3

03/07/2019

CR 2017-04166

Date Entry Error Identified on Nuclear Instrument Movement

Checklist

04/12/2017

CR 2019-00757

Damaged Fuel Bundle Identified During New Fuel Receipt

01/24/2019

CR 2019-01277

LPRMs Failed Pre-installation Test

2/11/2019

CR 2019-01292

1R17-New LPRM Detector Test Difficulty

2/12/2019

Corrective Action

Documents

Resulting from

Inspection

CR 2019-10486

Foreign Material Identification in Spent Fuel Pool

2/18/2019

CR 2019-10511

Locking Mechanism Cover Observed Out of Place on Dry

Tube Trash Can

2/18/2019

Drawings

Spent Fuel Map

Fuel Prep Pool

Miscellaneous

Fuel Movement Checklist - New Fuel Receipt for 1R16

04/24/2017

Fuel Move Checklist

04/17/2017

Nuclear Instrumentation Movement Checklist Work Order 200694931

07/11/2019

Nuclear Instrumentation Movement Checklist Work Order 200694793

07/11/2019

Procedures

FTI-D0001

Fuel Accountability Instruction

FTI-D0009

Use of the Fuel Movement Checklist

FTI-E0013

New Fuel Receipt and Storage

FTI-E0014

New Fuel Inspection and Channeling in the New Fuel

Inspection Stand

FTI-G0010

Control and Use of the MARLA Fuel Movement and Storage

Database

HPI-L0004

Source Control Documentation and Inventory

NOP-NF-3001

Special Nuclear Material Control and Accounting Program

NOP-NF-3002

Special Nuclear Material Physical Inventory

Shipping Records

Nuclear Instrument Receipt/Shipment SNM Source

04/28/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Fuel Receipt Shipment Data Index

01/05/2019

DOE/NRC FORM

741

Nuclear Material Transaction Report

2/07/2019

Work Orders

200364035

Dry Tube Replacement for LPRM and IRM

04/01/2017

200510261

Replace IRM Detector

04/06/2017

200708723

Inventory of Special Nuclear Material

2/25/2017

200708724

Inventory of Special Nuclear Material

2/26/2018

WO 200664435

Replace Designated LPRM Detectors

04/01/2017

WO 200694931

Receive/Inspect/Store Nuclear Instruments

2/07/2019