IR 05000440/2019410

From kanterella
Jump to navigation Jump to search
NRC Security Baseline Inspection Report 05000440/2019410 (DRS-M.Ziolkowski)
ML19155A160
Person / Time
Site: Perry 
Issue date: 06/04/2019
From: Hartman T
Plant Support Branch II
To: Payne F
FirstEnergy Nuclear Operating Co
References
IR 2019410
Download: ML19155A160 (7)


Text

June 4, 2019

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1NRC SECURITY BASELINE

INSPECTION REPORT 05000440/2019410

Dear Mr. Payne:

On April 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Perry Nuclear Power Plant, Unit 1 and discussed the results of this inspection with Mr. Saltz and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Thomas C. Hartman, Acting Chief Plant Support Branch Division of Reactor Safety

Docket No. 50-440 License No. NPF-58

Enclosure:

Inspection Report 05000440/2019410

Inspection Report

Docket Number:

05000440

License Number:

NPF-58

Report Number:

05000440/2019410

Enterprise Identifier: I-2019-410-0047

Licensee:

FirstEnergy Nuclear Operating Co.

Facility:

Perry Nuclear Power Plant, Unit 1

Location:

Perry, OH 44081

Inspection Dates:

April 22, 2019, to April 26, 2019

Inspectors:

J. Steffes, Senior Resident Inspector (Bwr)

M. Ziolkowski, Physical Security Inspector

Approved By:

Thomas C. Hartman, Acting Chief

Plant Support Branch

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Security Baseline Inspection at Perry Nuclear Power Plant,

Unit 1 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations

No findings or violations were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the Security Access Control Program. The following elements were

===evaluated from this IP.

Access Control===

  • Tier I: All
  • Tier II: 02.06 (a-d), 02.07, 02.08 (b, d, g, i)
  • Tier III: 02.09

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the Security Target Set Program. The following elements were

===evaluated:

Power Reactor Target Sets===

Requirements: 02.02 (a-f), 02.03, 02.04 (a),

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 30, 2019, the inspector presented the Security Baseline inspection results to Mr. Saltz and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

NOP-LP-1001

Unescorted Access Requirements

NOP-LP-1003

Threat Reporting and Two Person Line of Sight Rule

NOP-LP-1102

Protection of Safeguards Information

NOP-LP-1104

Security Related Access Control Devices

NOP-LP-1104

Annual Security Keys, Locks and Cores Inventory

NOP-LP-1202

Vehicle and Material Access Control

NOP-LP-1203

Security Badge Control

NOP-LP-1204

Primary Access Facility Controls

NOP-LP-1205

Visitor Control to Protected and Vital Areas

Self-Assessments

SA-BN-2019-

1303

Review of Perry Nuclear Power Plant (PNPP) Security Access

Controls

01/25/2019

71130.14

Corrective Action

Documents

Resulting from

Inspection

CR-2019-03827

Evaluate the need to update Target Set support material

04/24/2019

Procedures

Perry Nuclear Power Plant Target Set Manual

Perry Nuclear Power Plant Target Set Support Material

Perry Nuclear Power Plant Physical Security Plan

2/01/2017

NOP-LP-1101

Security General Administration

NOP-LP-1106

Target Set program

NOP-LP-1107

Safety and Security Interface

NOP-LP-1501

Response to Indications of Potential Tampering, Vandalism or

Malicious Mischief

NOP-SS-1200

Cyber Security Program

Self-Assessments

SA-BN-2019-

1305

Review of Perry Nuclear Power Plant (PNPP) Target Set

Program

01/28/2019