_
_ ~ _...
_
.
_ _ -
.
-
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
,
Report No. 50-440/82-02(DETP); 50-441/82-02(DETP)
Docket No. 50-440; 50-441 License No. CPPR-148; CPPR-149 Licensee: Cleveland Electric Illuminating Company Post Office Box 5000 Cleveland, OH 44101
,
Facility Name: Perry Nuclear Power Plant, Units 1 and 2
'
i Inspection At: Perry Site, Perry, OH tgs April 21-23, 1982 i
Inspecti Co Inspecto.. f'gight c.
j
/
~
gale
[f/0/87
.
Y
/
%
6e d//'
Approved By:
D. H. Danielson, Chief Materials and Processes Section
,
Inspection Summary i
Inspection on April 21-23, 1982 (Report No. 50-440/82-02(DETP); 50-441/82-02
'
(DETP))
Areas Inspected:
Shop weld radiographs; field weld radiographs, nondestruc-
i tive examination (NDE) certifications and UT test reports of polar crane
'
girders for Unit 2.
This inspection involved a total of 11 inspector-hours onsite by one NRC inspector.
'
Results: No items of noncompliance or deviations were identified.
,
.
A
.
k 8205280.ll}
-
_-
-
.-
-
_.
.
.
-
- - - - -. --
.. _ ~
-.-..
. ~ _ _ - -
.
- _ - _ - _ -
.
-
.
L DETAILS
.
Persons Contacted i
Cleveland Electric Illuminating Company
- A.
L. Bradshaw, TAS/NDE - Level III
- John Bowser, TAS/NDE - Level III
- K. A. Webb, NDS, Responsible Engineer
- Rodney Whitaker, CEI Contracts Administrator
- T. Keaveney, Senior Structural Engineer
- M. K. Combs, TAS/CEI, Senior Engineering Aide Don Campbell, NDE (NES) Level II George T111 sky, Vendor QA Tim Kevin, Construction Engineer
- Denotes those present at exit meeting on April 23, 1982.
Licensee Action on Previous Inspection Findings
+
(0 pen) Noncompliance (440/82-03-03) - Lead location markers were in the area of interest, a repair area was not correctly identified by location markers, and lack of fusion, excessive slag, and a crack were found in various welds.
(0 pen) Weld No. WN 1-1, area 20-21.
The radiographs reveal approximately
.
13 areas of lack of fusion and excessive slag.
(0 pen) Weld No. WM 1-1, area 31-30.
Repair four (R-4) radiograph was
.
not correctly identified in area repaired.
(0 pen) Weld No. WN 1-1, area 31-30, repair 6 (R-6).
The radiograph
.
reveals a crack in the wold.
(Closed) Assembly No. OM-61-21X, Wold No. B, area P-S-B on the radio-
.
graph had the lead location markers located in the area of interest which could mask a defect. This area was re-radiographed and found to be acceptable.
(0 pen) Unresolved Item (440/82-03-01) - Possible linear indication in assembly No. OM-61-17X, weld No. D, area E-F-G on the radiograph.
This area was re-radiographed utilizing very fine grain film to obtain better resolution, sensitivity, and definition in order to resolve linear indications. The radiograph revealed that the linear indications were cracking and areas of non-fusion. This item has been resolved and a NCR
_(No. T/AS0002) has been initiated.
This item will remain open until weld repair has been completed and re-inspected.
-
.
. _
.
.
.-. _
. _
.
_. __ _-
. _ _ -
- _
- _
- -. -
.
.
.
!
.
(Closed) Unresolved Item (440/82-03-02) - Possible linear indication
'
in assembly No. 0?i-61-19X, Weld No. A, area H-I-J-K on the radiograph.
Area was re-radiographed and found to be acceptable.
i (Open) Open Item (440/81-17-01) - Box beam girder welds in Unit 2
'
polar crane.
Repair welding of Unit 2 girder welds is in process and is expected i
to be completed by June 11, 1982. A UT of the Unit 1 girder welds is scheduled to be started by April 27, 1982. This UT is to be conducted on a random basis to determine if Unit I has similar defects as identi-fled on Unit 2 polar crane girder.
If similar defects are identified,
then a separate NCR will be written to identify these defects.
'
>
During repair operations of Unit 2 polar crane girder, it was identi-fled that a number of subsurface linear defects existed in shop welds.
The amount of repair work raised concerns about the overall quality of the girder assemblies. These concerns resulted in a meeting between CEI and NNI in which NNI agreed to study the problem and provide a recommended course of action for resolution. The owner concluded that a problem did exist and recommended that an informational UT be per-formed on all major structural welds in question. Joints were 100%
UT inspected with the exception of excavated joints undergoing repair
prior to the suspension of work activities. Of the approximately 100 UT reports resulting from this inspection effort, all indicated a reject disposition.
Functional or Program Areas Inspected
'
1.
NDE Personnel Certifications The inspector reviewed the following NES NDE personnel certifications in accordance with SNT-TC-1A, 1975 Edition.
,
Name RT
'
Don Campbell II M. A. Terpening II W. D. Hilkens II
!
No items of noncompliance or deviations were identified.
2.
Containment Radiographic Review The above three personnel have been retained by Project Organization NDE Group to review 100% of the radiographs of Units 1 and 2 contain-ments.
An NCR has been initiated (T/AS0001). The review of the radiographs to date indicate that 62% of the welds reviewed are re-jectable. These rejectable welds pertain to the welds on NCR's No.17-152, 17-777,17-195, 17-254 and 17-268.
The review of the welds not concerned with the original NCR's indicates a reject rate
of 32%.
4
-,
e-
, _ _ _ _, _, - - _
_, -
_
,#-,,,-_,m,-
_ -..
,
,. _, -
_ -,
, - -
.
It is estimated that it will take a minimum of 90 days to completely review all the radiographs pertaining to Unit 1 and 2 containments.
Exit Interview The inspector met with site representatives (denoted in Perscns Contacted paragraph) at the conclusion of the inspection. The inspector summarized the scope and findings of the inspection noted in this report.
l
,a,
/ a Atog'o
.
m UNITED STATES
/'
NUCLEAR REGULATORY COMMISSION
,,
g
- E REGION 111
o
790 ROOSEVELT ROAD GLEN ELLYN. ILLINOIS 80137 MAY 13 E Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATrN: Dalwyn R. Davidson Vice President - System Engineering and Construction Post Office Box 5000 Cleveland, OH 44101 Gentlemen This refers to the routine safety inspection conducted by Mr.
E. H. Nightingale of this office on April 21-23, 1982, of activitier. at the Perry Nuclear Power Plant, Units 1 and 2, authorized by NRC Construc-tion Permits No. CPPR-148 and No. CPPR-149 and to the discussion of our findings with Mr. R. Farrell and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-phone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be estab-lished. Consistent with Section 2.790(b)(1), any such application must
.
MAY 13 '::2
.
The Cleveland Electric Illuminating
Company be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons which are the bases for the claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not heat from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely, p) n w14e W. S. Little, Chief Engineering Inspection Branch
Enclosure:
Inspection Report
No. 50-440/82-02(DETP) and
No. 50-441/82-02(DETP)
REGION III==
Report No. 50-440/82-02(DETP); 50-441/82-02(DETP)
f
Docket No. 50-440; 50-441
License No. CPPR-148; CPPR-149
Licensee: Cleveland Electric Illuminating Company
Post Office Box 5000
Cleveland, OH 44101
Facility Name: Perry Nuclear Power Plant, Units 1 and 2
Inspect'on At: Perry Site, Perry, OH
.
Inspecti
Co
tyg
April 21-23, 1982
,/
--,
Inspecto.'
ig t gale
O 8V
V
/
%
%
Approved By:
D. H. Danielson, Chief
6! $/ dO *'
/
Materials and Processes Section
Inspection Summary
Inspection on April 21-23, 1982 (Report No. 50-440/82-02(DETP); 50-441/82-02
(DETP))
Areas Inspected: Shop weld radiographs; field weld radiographs, nondestruc-
tive examination (NDE) certifications and UT test reports of polar crane
girders for Unit 2.
This inspection involved a total of 11 inspector-hours
onsite by one NRC inspector.
Results: No items of noncompliance or deviations were identified.
_ - _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _.
.
.
.
.
DETAILS
Persons Contacted
Cleveland Electric Illuminating Company
- A. L. Bradshaw, TAS/NDE - Level III
- John Bowser, TAS/NDE - Level III
- K. A. Webb, NDS, Responsible Engineer
- Rodney Whitaker, CEI Contracts Administrator
- T. Keaveney, Senior Structural Engineer
- M. K. Combs, TAS/CEI, Senior Engineering Aide
Don Campbell, NDE (NES) Level II
J
George Tilisky, Vendor QA
Tim Kevin, Construction Engineer
- Denotes those present at exit meeting on April 23, 1982.
Licensee Action on Previous Inspection Findings
,
(0 pen) Noncompliance (440/82-03-03) - Lead location markers were in the area
of interest, a repair area was not correctly identified by location markers,
j
and lack of fusion, excessive slag, and a crack were found in various welds.
(Open) Weld No. WN 1-1, area 20-21.
The radiographs reveal approximately
.
13 areas of lack of fusion and excessive slag.
(Open) Weld No. VM 1-1, area 31-30.
Repair four (R-4) radiograph was
.
not correctly identified in area repaired.
(0 pen) Weld No. WN 1-1, area 31-30, repair 6 (R-6).
The radiograph
.
reveals a crack in the weld.
(Closed) Assembly No. OM-61-21X, Weld No. B, area P-S-B on the radio-
.
graph had the lead location markers located in the area of interest
'
which could mask a defect. This area was re-radiographed and found
to be acceptable.
(Open) Unresolved Item (440/82-03-01) - Possible linear indication
in assembly No. OM-61-17X, weld No. D, area E-F-G on the radiograph.
This area was re-radiographed utilizing very fine grain film to obtain
better resolution, sensitivity, and definition in order to resolve linear
indications. The radiograph revealed that the linear indications wera
cracking and areas of non-fusion..D11s item has been resolved and a NCR
'
(No. T/AS0002) has been initiated. This item will remain open until weld
repair has been completed and re-inspected.
c
.
-
a
'
l
(Closed) Unresolved Item (440/82-03-02) - Possible linear indication
in assembly No. OM-61-19X, Weld No. A, area H-I-J-K on the radiograph.
Area was re-radiographed and found to be acceptable.
(0 pen) Open Item (440/81-17-01) - Box beam girder welds in Unit 2
polar crane.
Repair welding of Unit 2 girder welds is in process and is expected
to be completed by June 11, 1982. A UT of the Unit 1 girder welds is
scheduled to be started by April 27, 1982. This UT is to be conducted
on a random basis to determine if Unit I has similar defects as identi-
fied on Unit 2 polar crane girder.
If similar defects are identified,
then a separate NCR will be written to identify these defects.
During repair operations of Unit 2 polar crane girder, it was identi-
fled that a number of subsurface linear defects existed in shop welds.
The amount of repair work raised concerns about the overall quality
of the girder assemblies. These concerns resulted in a meeting between
CEI and NNI in which NNI agreed to study the problem and provide a
recommended cource of action for resolution. The owner concluded that
a problem did exist and recommended that an informational UT be per-
formed on all major structural welds in question. Joints were 100%
UT inspected with the exception of excavated joints undergoing repair
prior to the suspension of work activities. Of the approximately
100 UT reports resulting from this inspection effort, all indicated
a reject disposition.
Functional or Program Areas Inspected
1.
NDE Personnel Certifications
The inspector reviewed the following NES NDE personnel certifications
in accordance with SNT-TC-1A, 1975 Edition.
Name
Don Caspbell
II
M. A. Terpening
II
W. D. Hilkens
II
No items of noncompliance or deviations were identified.
,
2.
Containment Radiographic Review
The above three personnel have been retained by Project Organization
NDE Group to review 100% of the radiographs of Units 1 and 2 contain-
ments.
An NCR has been initiated (T/AS0001). The review of the
radiographs to date indicate that 62% of the welds reviewed are re-
jectable. These rejectable welds pertain to the welds on NCR's
No.17-152, 17-777,17-195, 17-254 and 17-268. The review of the
welds not concerned with the original NCR's indicates a reject rate
of 32%.
-
-
,
_
__..
-
.
a
It is estimated that it will take a minimum of 90 days to completely
review all the radiographs pertaining to Unit 1 and 2 containments.
Exit Interview
The inspector met with site representatives (denoted ir Persons Contacted
paragraph) at the conclusion of the inspection. The inspector summarized
the scope and findings of the inspection noted in this report.
l
i
.
!
l
!
i
!
i
<
.
'
l
l
_