SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1-4 - SECURITY BASELINE INSPECTION REPORT 05000424/2025420, 05000425/2025420, 05200025/2025420 AND 05200026/2025420
Dear Jamie M. Coleman:
On December 12, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1-4 and discussed the results of this inspection with John H. Weissinger, Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket Nos.
05000424/2025420, 05000425/2025420, 05200025/2025420 and 05200026/2025420 License Nos. NPF-68, NPF-81, NPF-91 and NPF-92
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000424, 05000425, 05200025 and 05200026
License Numbers:
NPF-68, NPF-81, NPF-91 and NPF-92
Report Numbers:
05000424/2025420, 05000425/2025420, 05200025/2025420 and
05200026/2025420
Enterprise Identifier:
I-2025-420-0010 and I-2025-420-0020
Licensee:
Southern Nuclear Operating Co., INC.
Facility:
Vogtle Electric Generating Plant, Units 1 -4
Location:
Waynesboro, GA
Inspection Dates:
November 17, 2025, to December 12, 2025
Inspectors:
D. Bradfield, Team Leader, NSIR
P. Negrete, Physical Security Inspector, NSIR
J. Stovall, Physical Security Inspector, RII
A. Woyansky, Senior Physical Security Inspector, NSIR
Approved By:
Jefferson K. Clark, Chief
Security Performance Evaluation Branch
Division of Security Operations
SUMMARY
The U.S. NRC continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electric Generating Plant, Units 1 -4, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.03 - Contingency Response - Force-On-Force Testing
Contingency Response - Force-On-Force Testing (1 Sample)
- (1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)
Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.
REPORT ATTACHMENTS
Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126315.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On December 12, 2025, the inspectors presented the security baseline inspection results to John H. Weissinger, Vice President and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CR11234273
2/11/2025
CR11234281
2/11/2025
TE1191330
2/10/2025
TE1191331
2/10/2025
TE1191332
2/10/2025
TE1191333
2/10/2025
TE1191334
2/10/2025
TE1191335
2/10/2025
TE1191336
2/10/2025
TE1191416
2/11/2025
TE1191418
2/11/2025
TE1191419
2/11/2025
TE1191420
2/11/2025
Corrective Action
Documents
Resulting from
Inspection
Technical
Evaluation
1190256
Drawings
AX2D45S002-1
Finished Grading and Drainage Area Plan Sheet 1 of 2 -
Georgia Power Company, Alvin W. Vogtle Nuclear Plant
N/A
NOTE: Due to the U.S. Federal Government shutdown the
inspectors review of licensee submittal was minimal.
FCC 601-LM
Federal Communication Commission, Wireless
Telecommunication Bureau - Radio Station Authorization VHF
& UHF
August 2007
Miscellaneous
MUX location list
N/A
N/A
Southern
Company NMP-
Use of Force
2/8/2014
Procedures
Southern Nuclear
Operating
Company, Vogtle
Electric
Generating Plant
Security plan, Training and Qualification Plan, Safeguards
Contingency Plan
1/03/2024
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Southern Nuclear,
90305-C
Security Contingency Response Plan
9/29/2025
SV4-243
Vogtle Electric Generating Plant, Unit 1 & 2 - Target Sets
2/18/2025
SV4-254
Vogtle Electric Generating Plant, Unit 3 & 4 - Target Sets
2/18/2025
OFFICE
NSIR/DSO/SPEB
/ETA
NSIR/DPCP/RSB
NSIR/DSO/SPEB
/ETC
NSIR/DSO/SPEB
/ETA
NAME
PNegrete
JStovall
DBradfield
JClark
DATE
Jan 7, 2026
Jan 7, 2026
Jan 7, 2026
Jan 13, 2026