IR 05000424/2025420

From kanterella
Jump to navigation Jump to search
4 - Security Baseline Inspection Report 05000424/2025420, 05000425/2025420, 05200025/2025420 and 05200026/2025420
ML26006A109
Person / Time
Site: Vogtle  
(NPF-068, NPF-081, NPF-091, NPF-092)
Issue date: 01/13/2026
From: Clark J
Security Performance Evaluation Branch
To: Coleman J
Southern Nuclear Operating Co
References
IR 2025420
Download: ML26006A109 (0)


Text

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1-4 - SECURITY BASELINE INSPECTION REPORT 05000424/2025420, 05000425/2025420, 05200025/2025420 AND 05200026/2025420

Dear Jamie M. Coleman:

On December 12, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1-4 and discussed the results of this inspection with John H. Weissinger, Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket Nos.

05000424/2025420, 05000425/2025420, 05200025/2025420 and 05200026/2025420 License Nos. NPF-68, NPF-81, NPF-91 and NPF-92

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000424, 05000425, 05200025 and 05200026

License Numbers:

NPF-68, NPF-81, NPF-91 and NPF-92

Report Numbers:

05000424/2025420, 05000425/2025420, 05200025/2025420 and

05200026/2025420

Enterprise Identifier:

I-2025-420-0010 and I-2025-420-0020

Licensee:

Southern Nuclear Operating Co., INC.

Facility:

Vogtle Electric Generating Plant, Units 1 -4

Location:

Waynesboro, GA

Inspection Dates:

November 17, 2025, to December 12, 2025

Inspectors:

D. Bradfield, Team Leader, NSIR

P. Negrete, Physical Security Inspector, NSIR

J. Stovall, Physical Security Inspector, RII

A. Woyansky, Senior Physical Security Inspector, NSIR

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

SUMMARY

The U.S. NRC continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electric Generating Plant, Units 1 -4, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126315.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On December 12, 2025, the inspectors presented the security baseline inspection results to John H. Weissinger, Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR11234273

2/11/2025

CR11234281

2/11/2025

TE1191330

2/10/2025

TE1191331

2/10/2025

TE1191332

2/10/2025

TE1191333

2/10/2025

TE1191334

2/10/2025

TE1191335

2/10/2025

TE1191336

2/10/2025

TE1191416

2/11/2025

TE1191418

2/11/2025

TE1191419

2/11/2025

TE1191420

2/11/2025

Corrective Action

Documents

Resulting from

Inspection

Technical

Evaluation

1190256

Drawings

AX2D45S002-1

Finished Grading and Drainage Area Plan Sheet 1 of 2 -

Georgia Power Company, Alvin W. Vogtle Nuclear Plant

N/A

NOTE: Due to the U.S. Federal Government shutdown the

inspectors review of licensee submittal was minimal.

FCC 601-LM

Federal Communication Commission, Wireless

Telecommunication Bureau - Radio Station Authorization VHF

& UHF

August 2007

Miscellaneous

MUX location list

N/A

N/A

Southern

Company NMP-

SE-008

Use of Force

2/8/2014

71130.03

Procedures

Southern Nuclear

Operating

Company, Vogtle

Electric

Generating Plant

Security plan, Training and Qualification Plan, Safeguards

Contingency Plan

1/03/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Southern Nuclear,

90305-C

Security Contingency Response Plan

9/29/2025

SV4-243

Vogtle Electric Generating Plant, Unit 1 & 2 - Target Sets

2/18/2025

SV4-254

Vogtle Electric Generating Plant, Unit 3 & 4 - Target Sets

2/18/2025

ML26006A109

OFFICE

NSIR/DSO/SPEB

/ETA

NSIR/DPCP/RSB

NSIR/DSO/SPEB

/ETC

NSIR/DSO/SPEB

/ETA

NAME

PNegrete

JStovall

DBradfield

JClark

DATE

Jan 7, 2026

Jan 7, 2026

Jan 7, 2026

Jan 13, 2026