IR 05000424/2025005
| ML25237A275 | |
| Person / Time | |
|---|---|
| Site: | Vogtle, 07201039 |
| Issue date: | 08/27/2025 |
| From: | Alan Blamey NRC/RGN-II/DORS |
| To: | Coleman J Southern Nuclear Company |
| References | |
| IR 2025005 | |
| Download: ML25237A275 (1) | |
Text
SUBJECT:
UPDATED INSPECTION PLAN FOR VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - REPORT 05000424/2025005 AND 05000425/2025005
Dear Jamie Coleman:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Vogtle Electric Generating Plant, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ADAMS Accession Number ML25042A278), the NRC determined that a broad, comprehensive review of the ROP is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
As noted in the enclosed inspection plan, in addition to the baseline inspections the NRC will conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, at your facility in June 2026 (Phase 2) and in September 2026 (Phase 1).
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
August 27, 2025 Please contact me at 404-997-4415 with any questions you have regarding this letter.
Sincerely, Alan J. Blamey, Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000424, 05000425 and 07201039 License Nos. NPF-68 and NPF-81 Enclosure(s):
Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Blamey, Alan on 08/27/25
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DORS RII/DORS NAME A. Blamey A. Alen Arias DATE 08/27/2025 08/262025
Vogtle 09/01/2025 - 06/30/2027 SECURITY BASELINE INSPECTION
1,2 10/6/2025 10/9/2025 IP 71130.02 000734 Access Control 1,2 10/6/2025 10/9/2025 IP 71130.09 001656 Security Plan Changes 1,2 10/6/2025 10/9/2025 IP 71151 001338 Performance Indicator Verification 1,2 10/6/2025 10/9/2025 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - VOG
1,2 11/17/2025 11/21/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 12/8/2025 12/12/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing FOCUSED ENGINEERING INSPECTION (AGE-RELATED)
1,2 1/12/2026 1/16/2026 IP 71111.21N.04 001832 Age-Related Degradation 1,2 1/26/2026 1/30/2026 IP 71111.21N.04 001832 Age-Related Degradation UNIT 1 IN-SERVICE INSPECTION +SG
POST-APPROVAL LICENSE RENEWAL PHASE 2
1,2 6/8/2026 6/12/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal 1,2 6/22/2026 6/26/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal SECURITY BASELINE INSPECTION
1,2 7/6/2026 7/9/2026 IP 71130.02 000734 Access Control 1,2 7/6/2026 7/9/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 7/6/2026 7/9/2026 IP 71130.09 001656 Security Plan Changes 1,2 7/6/2026 7/9/2026 IP 71151 001338 Performance Indicator Verification COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI)
1,2 7/13/2026 7/17/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 7/27/2026 7/31/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection SNC CORPORATE SECURITY INSPECTION AA/FFD (VOG 1 & 2)
1,2 7/20/2026 7/23/2026 IP 71130.01 000733 Access Authorization 1,2 7/20/2026 7/23/2026 IP 71130.08 000740 Fitness-For-Duty Program
3/16/2026 3/27/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
Unit Starts End Activity CAC Title Staff Count
Site Inspection Activity Plan
SECURITY BASELINE INSPECTION 3 1,2 8/31/2026 9/3/2026 IP 71130.01 000733 Access Authorization 1,2 8/31/2026 9/3/2026 IP 71130.07 000739 Security Training 1,2 8/31/2026 9/3/2026 IP 71130.08 000740 Fitness-For-Duty Program UNIT 2 POST-APPROVAL LICENSE RENEWAL PHASE 1
2 9/21/2026 9/25/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal UNIT 2 IN-SERVICE INSPECTION +SG
2 9/21/2026 10/2/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1,2 8/3/2026 8/7/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 9/21/2026 9/25/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 9/21/2026 9/25/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 9/21/2026 9/25/2026 IP 71124.04 000728 Occupational Dose Assessment 1,2 9/21/2026 9/25/2026 IP 71151 000746 Performance Indicator Verification EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1,2 10/26/2026 10/30/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 10/26/2026 10/30/2026 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 10/26/2026 10/30/2026 IP 71151 001397 Performance Indicator Verification FOCUSED ENGINEERING INSPECTION (CGD)
1,2 11/2/2026 11/6/2026 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 11/16/2026 11/20/2026 IP 71111.21N.03 001808 Commercial Grade Dedication VOGTLE 1 AND 2 INITIAL EXAM
1,2 10/25/2026 10/31/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 11/29/2026 12/12/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
PROBLEM IDENTIFICATION AND RESOLUTION
1,2 2/1/2027 2/5/2027 IP 71152B 000747 Problem Identification and Resolution 1,2 2/15/2027 2/19/2027 IP 71152B 000747 Problem Identification and Resolution EMERGENCY PREPAREDNESS PROGRAM INSPECTION
1,2 2/22/2027 2/26/2027 IP 71114.02 000717 Alert and Notification System Testing 1,2 2/22/2027 2/26/2027 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 2/22/2027 2/26/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
Site Inspection Activity Plan
1,2 2/22/2027 2/26/2027 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 2/22/2027 2/26/2027 IP 71151 001397 Performance Indicator Verification FOCUSED ENGINEERING INSPECTION 2 - TBD
1,2 3/29/2027 4/2/2027 IP 71111.21N 000714 Focused Engineering Inspections (FEI Placeholder)
CYBER SECURITY INSPECTION
1,2 4/19/2027 4/23/2027 IP 71130.10 000741 Cybersecurity OPERATION OF AN ISFSI
1,2 5/10/2027 5/14/2027 IP 60855 Operation Of An ISFSI MATERIAL CONTROL AND ACCOUNTING
1,2 6/21/2027 6/25/2027 IP 71130.11 000742 Material Control and Accounting (MC&A)