IR 05000416/1983004
| ML20071K968 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 03/02/1983 |
| From: | Cantrell F, Scott D, Wagner A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20071K786 | List: |
| References | |
| 50-416-83-04, 50-416-83-4, NUDOCS 8305270438 | |
| Download: ML20071K968 (5) | |
Text
_
_
_
_ _ _.. -
..
,
.
p asc UNITED STATES l
/p oq[o
,
NUCLEAFI REGULATORY COMMISSION g
l e
o REGION 11
.g 101 MARIETTA ST., N.W SUITE 3100
f ATLANTA, GEORGIA 30303 o,
s.
/
- ...+
Report Nos..
50-416/83-04 Licensee: Mississippi Power and Light Company Jackson, MS 39205 Docket Nos.: 50-416 License Nos. - NPF-13 Facility Name: Grand Gulf 1 Inspection at Grand Gulf site near Port Gibson, Mississippi J/2/9J Inspectors:
1>
A. G. Wagner
/
Date Signed h
- I/Z-lV 7
'
D. E. Scott
/
Uate' Signed Accompanying Personnel:
F. S. Cantrell - January 24-27, 1983 February 9-11, 1983 Approved by:
..h 4t/ /
N F.S.~Cantrell,SectiongfWef D' ate ' Signed
Project Branch No.1
'
Division of Project and Resident Programs SUMMARY Inspection on January 17 - Februrary 15, 1983 i
l Areas Inspected i
This routine, announced inspection involved 113 resident inspector-hours on site in the areas of plant shutdown conditions, maintenance observation, surveillance observation, and Licensee Event Report review.
Results l
Of the four areas inspected, no violations or deviations were identified in three j
areas; two items of noncompliance were found in one area (Failure to make a 10CFR Part 20 posting, paragraph 5.2 and failure to follow procedure, paragraph 5.b.).
8305270438 830519 PDR ADOCK 05000416 G
.--
-
. - - _ _ _. -., - - -, _ - _. - - _ -
.. _. -,, -. _. _
.
.
.
DETAILS 1.
Persons Contacted Licensee Employees
- C. K. McCoy, Nuclear Plant Manager
- J. P. McGaughy, Jr., Assistant Vice President
- R. G. Keeton, Operations Superintendent
- R. R. Weedon, Chemistry and Health Physics Superintendent
- J. D. Bailey, Plant Quality
- J. Vincelli, Radiation Control Supervisor
- P. R. Hughes, Regulatory Compliance
- M. McDowell, Operations Other licensee employees contacted included operators and office personnel.
- Attended exit interview
,
2.
Exit Interview The inspection scope and findings were summarized on February 15, 1983, with those persons indicated in paragraph 1 above. Licensee management acknowl-edged the inspection findings.
3.
Licensee Action on Previous Enforcement Matters Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Plant Shutdown Inspection The inspectors kept themselves informed on a daily basis of the overall plant status and any significant safety matters related to plant conditions.
Daily discussions were held with plant management and various members of the plant operating staff.
The inspectors made frequent visits to the control room such that it was visited at least daily when an inspector was on site. Observations included instrument readings; setpoints and recordings; status of emergency standby systems; purpose of temporary tags on equipment controls and switches; annunicator alarms; adherence to procedures; adherence to limiting conditions for operations; temporary alterations in effect; daily journals and data sheet entries; and control room manning. This inspection activity also included numerous informal discussions with operators and their
,
!
supervisors.
,
l
-
_ _.
.
- - _
- - - -
_
.
.
-
.
,
.
.
.
General plant tours were conducted on at least a weekly basis. Portions of the control building, turbine building, auxiliary building, and outside areas were visited.
Observations included valve positions and system alignments; snubber and hanger conditions; instrument readings; house-keeping; radiation protection controls; tag controls on equipment; work activities in progress; vital area controls; personnel badging; personnel search and escort; and vehicle search and escort. Informal discussions were held with selected plant personnel in their functional areas during these tours.
The following comments were noted:
a.
During a tour of the auxiliary building on January 25, 1983, the inspector observed that reactor start-up sources were stored in the northwest corner of area 10, elevation 166', without the required radiological markings.
The material consisted of 7,760 curies of Antimony-124 in an area marked off with yellow / magenta rope, the radiation symbol and a sign stating " Radiation Area".
The designated area was not posted with a sign bearing the words " Radioactive Materials" or " Caution". The shipping container had been received on site January 24, 1983, and placed in storage.
The sources were contained within the inner shipping container which was still intact.
The shipping container outer shield had been removed, thus the container was not considered to be packaged for shipment in accordance with DOT regulations. Corrective action was taken in that the markings of " Caution - Radioactive Material" were added to the warning signs.
This is an apparent violation of 10CFR20, paragraph -203(e), which requires the posting of areas in which quantities of radioactive material (as defined in Appendix C of that part) are stored. It will be identified as Violation 416/83-04-01, Failure to Post a Radiological Material Storage Area.
b.
During a tour of the diesel generator building on January 21,1983, the
'
inspector noted that the Division II Diesel-Generator Starting Air System was not aligned as required for standby conditions.
Hand-switches for " Starting Air Dryer #1" and " Starting Air Dryer #2 and Aftercooler" were in the "0FF" position. System Operating Instruction (S0I) No. 04-1-01-P75-1, Revision 14,
" Standby Diesel-Generator l
System", paragraph 4.7.2.a, requires that these handswitches be placed l
in the " STANDBY" position.
Reference is made to Inspection bport No. 50-416/82-76, in which a similar problem involving the D esel Generator (D/G) starting air system was noted.
The inspecto had observed low starting air pressure which was determined tc have resulted from the air compressors not auto-running due to an open
,
l air-compressor breaker.
In the case of the starting air dryer hand-switches being misaligned, the starting air pressure was not low. This
,
is an apparent violation of S0I No. 04-1-01-P75-1.
It will be l
identified as Violation 416/83-04-02, Failure to Follow Procedure.
l L
,
..
.
.
.
6.
Maintenance Observation During the report period, the inspectors observed the below listed main-tenance activities for procedure adequacy, adherence to procedure, proper tagouts, adherence to Technical Specifications, radiological controls, and adherence to quality control hold points.
MWO E2D409 Post LOCA Sample Isolation Valve (E61F596D)
Open/ Closed Contact Wiring MWO M2D570 Division II Diesel Generator Main Lube Oil Storage Tank Repair No violations or deviations were identified in the areas inspected.
7.
Surveillance Testing Observation The inspectors observed the performance of the below listed surveillance procedures. The inspection consisted of a review of the procedure for technical adequacy, conformance to Technical Specifications, verification of test instrument calibration, observation on the conduct of the test, removal from service and return to service of the system and a review of test data.
06-EL-1H13-M-0001, Rev. 1, Standby Liquid Control (RWCU Isolation)
Channel "B" Functional Test.
No comments.
06-IC-1B21-M-1003, Rev. 4, Reactor Vessel Low /High Water Level (RPS)
Functional Test.
No comments.
06-IC-1821-M-1001, Rev. 3, SRV High Pressure Trip /Lo Lo Set Relief.
No comments.
06-0P-IC51-V-0002, Rev. 11, IRM Funtional Test. Minor comment in regard to the entering of Temporary Change Notices in the work document were discussed with plant management.
No violations or deviations were identified in the areas inspected.
8.
Reportable Occurrence The below listed Licensee Event Reports (LERs) were reviewed to determine if the information provided met NRC reporting requirements. The determination included adequacy of event description and corrective action taken or planned, existence of potential generic problems and the relative safety significance of each event. The following LERs are closed.
,'
.:
-
s
..
o
-
,,
LER NO.
DATE EVENT 82-025 July 24, 1982 Four Fire Door Alarms Inoperative 82-031 July 22, 1982 Control Building Penetration
-
Not Sealed 82-036 August 3, 1982 Smoke Detector Deactivated Due to Spurious Alarms82-038 August 4, 1982 Smoke Detection System Computer Multiplexer Failure 82-053 August 22, 1982 Smoke Detector Spurious Alarm Due to System Noise 82-057 August 23, 1982 Fire Door Magnetic Door Alarm Out of Adjustment 82-061 August 30, 1982 Smoke Detector Inoperative Due to Dust 82-069 September 3, 1982 Fire Door Magnetic Door Alarm Out of Adjustement 82-071 September 5, 1982 Smoke Detector Inoperative The following comments were noted concerning LERs:
82-032 July 23, 1982 Unsealed Penetration Between Hot Machine Shop and Division 2 ESF Switchgear Room The LER states that a final report should be expected within the next 60 days.
This report is not yet issued.82-043 July 22, 1982 Failure to Take Hourly Discharge Samples LER states that an update to the LER will be made within 45 days. This update is not ye; issued.
{
82-047 August 30, 1982 Failure to Take Vessel Head and Flange Temperature During Stud Tensioning LER states that this submittal is an interim report. The final report has not yet been received.
l'
..: