IR 05000413/2017005

From kanterella
(Redirected from IR 05000414/2017005)
Jump to navigation Jump to search
Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2017005 and 05000414/2017005)
ML17230A254
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/16/2017
From: Frank Ehrhardt
Division Reactor Projects III
To: Simril T
Duke Energy Corp
References
IR 2017005
Download: ML17230A254 (5)


Text

August 16, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2017005 AND 05000414/2017005)

Dear Mr. Simril:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Catawba Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC will conduct Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, in October 2017.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52

Enclosure:

Catawba Inspection/Activity Plan (09/01/2017 - 06/30/2019)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2017005 AND 05000414/2017005)

August 16, 2017

DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP RII: DRP

NAME JWorosilo MToth FEhrhardt

DATE 8/15/2017 8/15/2017 8/15/2017

OFFICIAL AGENCY RECORD

17230A254

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Catawba Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 1 of 2 08/14/2017 08:58:11 TI-191

- MITIGATING STRATEGIES

1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 10/16/2017 10/20/2017 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 03/26/2018 03/30/2018 EP

- EP EXERCISE

1, 2 IP Exercise Evaluation 7111401 06/04/2018 06/08/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/04/2018 06/08/2018 1, 2 IP Exercise Evaluation - Scenario Review 7111408 06/04/2018 06/08/2018 1, 2 IP Performance Indicator Verification 71151 06/04/2018 06/08/2018 DBAI

- DESIGN BASES ASSURANCE INSPECTION (TEAM)

1, 2 IP Design Bases Assurance Inspection (Teams)

7111121M 06/25/2018 06/29/2018 1, 2 IP Design Bases Assurance Inspection (Teams)

7111121M 07/16/2018 07/20/2018 1, 2 IP Design Bases Assurance Inspection (Teams)

7111121M 07/30/2018 08/03/2018 OL RQ

- REQUAL INSPECTION

1, 2 IP Licensed Operator Requalification Program 7111111B 08/06/2018 08/10/2018 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2 IP Problem Identification and Resolution 71152B 10/01/2018 10/05/2018 1, 2 IP Problem Identification and Resolution 71152B 10/15/2018 10/19/2018 ISI

- UNIT 1 IN-SERVICE INSPECTION & RVH EXAM

1 IP Inservice Inspection Activities - PWR 7111108P 11/26/2018 11/30/2018 RP

- RP OCCUPATIONAL - WEEK 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/26/2018 11/30/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/26/2018 11/30/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/26/2018 11/30/2018 1, 2 IP Occupational Dose Assessment 71124.04 11/26/2018 11/30/2018 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/26/2018 11/30/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 11/26/2018 11/30/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/26/2018 11/30/2018 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 11/26/2018 11/30/2018 RP

- RP OCCUPATIONAL - WEEK 2

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/10/2018 12/14/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 12/10/2018 12/14/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 12/10/2018 12/14/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Catawba Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 2 of 2 08/14/2017 08:58:11 RP

- RP OCCUPATIONAL - WEEK 2

1, 2 IP Occupational Dose Assessment 71124.04 12/10/2018 12/14/2018 1, 2 IP Radiation Monitoring Instrumentation 71124.05 12/10/2018 12/14/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/10/2018 12/14/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/10/2018 12/14/2018 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 03/04/2019 03/08/2019 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/04/2019 03/08/2019 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 03/04/2019 03/08/2019 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/04/2019 03/08/2019 1, 2 IP Performance Indicator Verification 71151 03/04/2019 03/08/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.