IR 05000413/2011006
| ML112440346 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/01/2011 |
| From: | Hutto G NRC/RGN-II/DRP/RPB1 |
| To: | Morris J Duke Energy Carolinas |
| Shared Package | |
| ML112440341 | List: |
| References | |
| IR-11-006 | |
| Download: ML112440346 (5) | |
Text
September 1, 2011
SUBJECT:
MID-CYCLE LETTER FOR CATAWBA NUCLEAR STATION UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000413/2011006 AND 05000414/2011006)
Dear Mr. Morris:
On August 9, 2011, the NRC completed its mid-cycle performance review of Catawba Nuclear Station Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2010, through June 30, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined the performance at Catawba Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2012.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The NRC will also conduct initial reactor operator licensing examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRCs processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (TI) 183, Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event, and TI-184, Availability and Readiness Inspection of Severe Accident Management Guidelines
(SAMGs) at your facility. Results of these inspections can be found here:
http://www.nrc.gov/japan/japan-activities.html. Additionally, on May 11, 2011, the agency issued NRC Bulletin 2011-01, Mitigating Strategies, to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hh)(2), and to determine the status of licensee mitigating strategies programs. On July 12, 2011, the NRCs Task Force made its recommendations to the Commission in its report, Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident. The NRC is currently reviewing the Task Forces recommendations to determine what additional actions may be warranted.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). [Note: Verify the Web site works, and update it, if necessary.]
Please contact me at 404-997-4607 with any questions you have regarding this letter.
Sincerely,
/RA/
George A. Hutto, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects
Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52
Enclosure: Catawba Inspection/Activity Plan (09/01/2011 - 12/31/2012)
(SAMGs) at your facility. Results of these inspections can be found here:
http://www.nrc.gov/japan/japan-activities.html. Additionally, on May 11, 2011, the agency issued NRC Bulletin 2011-01, Mitigating Strategies, to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hh)(2), and to determine the status of licensee mitigating strategies programs. On July 12, 2011, the NRCs Task Force made its recommendations to the Commission in its report, Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident. The NRC is currently reviewing the Task Forces recommendations to determine what additional actions may be warranted.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). [Note: Verify the Web site works, and update it, if necessary.]
Please contact me at 404-997-4607 with any questions you have regarding this letter.
Sincerely,
/RA/
George A. Hutto, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects
Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52
Enclosure: Catawba Inspection/Activity Plan (09/01/2011 - 12/31/2012)
X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:________ML112440346_________
X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP
SIGNATURE CWR /RA/
GAH /RA/
NAME CRapp AHutto
DATE 08/25/2011 08/25/2011
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:
C:\\DOCUMENTS AND SETTINGS\\GXD5\\MY DOCUMENTS\\SHAREPOINT DRAFTS\\CATAWBA MID-CYCLE LETTER.DOCX
cc w/encl:
Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532
Randy D. Hart Regulatory Compliance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution
Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution
Dhiaa M. Jamil Group Executive and Chief Nuclear Officer Duke Energy Carolinas, LLC Electronic Mail Distribution
C. Jeff Thomas Fleet Regulatory Compliance & Licensing Manager Duke Energy Carolinas, LLC Electronic Mail Distribution
Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202
Lara Nichols Associate General Counsel Duke Energy Corporation Electronic Mail Distribution
David A. Repka Winston Strawn LLP Electronic Mail Distribution
North Carolina MPA-1 Suite 600 P.O. Box 29513 Raleigh, NC 27525-0513
Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution
Mark Yeager Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution
W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution
Vanessa Quinn Federal Emergency Management Agency Radiological Emergency Preparedness Program 1800 S. Bell Street Arlington, VA 20598-3025
Steve Weatherman, Operations Analyst North Carolina Electric Membership Corporation Electronic Mail Distribution
County Manager of York County York County Courthouse P. O. Box 66 York, SC 29745-0066
Piedmont Municipal Power Agency Electronic Mail Distribution
Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602
David A. Baxter Vice President, Nuclear Engineering Duke Energy Carolinas, LLC Electronic Mail Distribution
Letter to J. from George A. Hutto dated September 1, 2011
SUBJECT:
MID-CYCLE LETTER FOR CATAWBA NUCLEAR STATION UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000413/2011006 AND 05000414/2011006)
Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource INPO ROP Assessment