UNITED STATES ptember 1, 2011

SUBJECT:

MID-CYCLE LETTER FOR CATAWBA NUCLEAR STATION UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000413/2011006 AND 05000414/2011006)

Dear Mr. Morris:

On August 9, 2011, the NRC completed its mid-cycle performance review of Catawba Nuclear Station Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2010, through June 30, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined the performance at Catawba Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2012.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The NRC will also conduct initial reactor operator licensing examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRCs processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (TI) 183, Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event, and TI-184, Availability and Readiness Inspection of Severe Accident Management Guidelines

DEC 2 (SAMGs) at your facility. Results of these inspections can be found here:

http://www.nrc.gov/japan/japan-activities.html. Additionally, on May 11, 2011, the agency issued NRC Bulletin 2011-01, Mitigating Strategies, to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hh)(2), and to determine the status of licensee mitigating strategies programs. On July 12, 2011, the NRCs Task Force made its recommendations to the Commission in its report, Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident. The NRC is currently reviewing the Task Forces recommendations to determine what additional actions may be warranted.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). [Note: Verify the Web site works, and update it, if necessary.]

Please contact me at 404-997-4607 with any questions you have regarding this letter.

Sincerely,

/RA/

George A. Hutto, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 Enclosure: Catawba Inspection/Activity Plan (09/01/2011 - 12/31/2012)

DEC 2 (SAMGs) at your facility. Results of these inspections can be found here:

http://www.nrc.gov/japan/japan-activities.html. Additionally, on May 11, 2011, the agency issued NRC Bulletin 2011-01, Mitigating Strategies, to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hh)(2), and to determine the status of licensee mitigating strategies programs. On July 12, 2011, the NRCs Task Force made its recommendations to the Commission in its report, Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident. The NRC is currently reviewing the Task Forces recommendations to determine what additional actions may be warranted.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). [Note: Verify the Web site works, and update it, if necessary.]

Please contact me at 404-997-4607 with any questions you have regarding this letter.

Sincerely,

/RA/

George A. Hutto, Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 Enclosure: Catawba Inspection/Activity Plan (09/01/2011 - 12/31/2012)

X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:________ML112440346_________ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE CWR /RA/ GAH /RA/

NAME CRapp AHutto DATE 08/25/2011 08/25/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\DOCUMENTS AND SETTINGS\GXD5\MY DOCUMENTS\SHAREPOINT DRAFTS\CATAWBA MID-CYCLE LETTER.DOCX

DEC 3 cc w/encl: Richard Haynes Division of Radiological Health Director, Division of Waste Management TN Dept. of Environment & Conservation Bureau of Land and Waste Management 401 Church Street S.C. Department of Health and Nashville, TN 37243-1532 Environmental Control Electronic Mail Distribution Randy D. Hart Regulatory Compliance Manager Mark Yeager Duke Energy Carolinas, LLC Division of Radioactive Waste Mgmt.

Electronic Mail Distribution S.C. Department of Health and Environmental Control Sandra Threatt, Manager Electronic Mail Distribution Nuclear Response and Emergency Environmental Surveillance W. Lee Cox, III Bureau of Land and Waste Management Section Chief Department of Health and Environmental Radiation Protection Section Control N.C. Department of Environmental Electronic Mail Distribution Commerce & Natural Resources Electronic Mail Distribution Dhiaa M. Jamil Group Executive and Chief Nuclear Officer Vanessa Quinn Duke Energy Carolinas, LLC Federal Emergency Management Agency Electronic Mail Distribution Radiological Emergency Preparedness Program C. Jeff Thomas 1800 S. Bell Street Fleet Regulatory Compliance & Licensing Arlington, VA 20598-3025 Manager Duke Energy Carolinas, LLC Steve Weatherman, Operations Analyst Electronic Mail Distribution North Carolina Electric Membership Corporation Kathryn B. Nolan Electronic Mail Distribution Senior Counsel Duke Energy Corporation County Manager of York County 526 South Church Street-EC07H York County Courthouse Charlotte, NC 28202 P. O. Box 66 York, SC 29745-0066 Lara Nichols Associate General Counsel Piedmont Municipal Power Agency Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution Peggy Force David A. Repka Assistant Attorney General Winston Strawn LLP State of North Carolina Electronic Mail Distribution P.O. Box 629 Raleigh, NC 27602 North Carolina MPA-1 Suite 600 David A. Baxter P.O. Box 29513 Vice President, Nuclear Engineering Raleigh, NC 27525-0513 Duke Energy Carolinas, LLC Electronic Mail Distribution

DEC 4 Letter to J. from George A. Hutto dated September 1, 2011 SUBJECT: MID-CYCLE LETTER FOR CATAWBA NUCLEAR STATION UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000413/2011006 AND 05000414/2011006)

Distribution w/encl: