t h
( ~
U. S.
NUCLEAR REGULATORY COMMISSION
REGION V
XEH01XXZOorr Report No.
Docket No.
Participants:
D. J. Wille 50"397/83"06, 50"397
, " License,No; CPPR-93 Licensee:
Washington Public'"Power'Supply System P.
O. Box 968 Richland, Washington 99352
'll ill Facility Name:
Washinton Nuclear Project No'. '2-(WNP-,2)
',
~ 't,',"
((
f I
Meeting Iocation:
NRC Region V, Walnut Creek, California<.
Meeting Conducted:
February 8, 1983,
'I l
.'
L'-'i-s>
, Project Inspector Dated (Operations)
R. T.,Dodds, Chief Reactor Projects Section
ated
~
~
R. A. Feil, Senior Resident Inspector (Operations)
Dated D. M. Sternberg, Chief~
Re t Projects Branch N
.
Dated J
L.
r ws, Director, Division of esid t, Reactor Projects, and Engineering Programs ated Approved by:
D.
. Sternberg, Chief, Reac Projects Br nch No.
,I,8303080210 830302 PDR AoaCV 0SO00397,
'9
', -:
~- ~
V
'I Itt I
It V
C It V "'
~Smmar A management meeting was held on February 8, 1983.
The status of the licensee's startup program, operational program, quality and safety assurance programs, the engineering trasition phase and corporate organization and operational philosophy were discussed.
The management meeting involved a total of 26 staff-hours by seven NRC representative ~ E I
il
ll r
(
DETAILS'$
Mana ement Meetin Partici ants
)5
- '.
Washin ton Public Power Su'
,S stem f( Il D.
W. Mazur, Director Operations r,'.
C. Bibb, Director, Po'wer,,Generation, R.
BE Glasscock, Director, Lice'nsing'and Assurance P. K. Shen, Director, Technology J.
D. Martin, Plant Manager G. K. Afflerbach, Assistant Plant Manager'.'-'~ '~,'-'>">>
'.
U.S, Nuclear Re ulator Commission.
J. L. Crews, Director, Division of 'Resident, Reactor Projects and Engineeri'ng Programs D. M. Sternberg, Chief, Reactor Projects Branch
R. T. Dodds, Chief, Reactor Projects Section
~
R. A. Feil, Senior Resident Inspector (Operations)
F. A. Wenslawski, Chief, Reactor Radiation Protection Section M. D. Schuster, Chief, Physical Security Section D. J. Willett, Project Inspector (Operations)
2.
Mana ement Meetin On February 8, 1983, a management meeting was held with the WNP-2, Director of Operations and members of his staff to discuss the readiness for operations status of WNP-2, and review -completed and ongoing work by the Supply System.
Topics discussed included:
A)
Major startup milestones B)
Status of startup program C)
Status of operational program D)
Engineering transition program E)
Status of quality and safety assurance programs F)
Licensing status G)
NRC regionalization plans H)
Supply System organization and operational philosophy These programs will be reviewed in detail by NRC Inspectors during-the remainder of Fiscal Year 1983.
The licensee is working to a schedule that projects the fuel load date as September 1, 198 > l4 kLA.l0 44 g. 4 0 J
~4 4'
f r
4L L
L '