March 11, 2025
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR LASALLE COUNTY STATION, UNITS 1 AND 2 (REPORT 05000373/2024006; 05000374/2024006)
Dear David Rhoades:
The NRC has completed its end-of-cycle performance assessment of LaSalle County Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC concluded that overall performance at your facility preserved public health and safety.
The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at LaSalle County Station Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,
Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2026.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at 630-829-9732 with any questions you have regarding this letter.
Sincerely, Robert Ruiz, Chief Reactor Projects Branch 1 Division of Operating Reactor Safety Docket Nos. 05000373 and 05000374 License Nos. NPF-11 and NPF-18 Enclosure:
Inspection Plan cc: Distribution via LISTSERV Signed by Ruiz, Robert on 03/10/25
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available OFFICE RIII NAME RRuiz:gmp DATE 03/10/2025
Site Inspection Activity Plan LaSalle 01/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count Inservice Inspection Unit 2
2 2/10/2025 2/21/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Radiation Protection Baseline Inspection
1,2 2/10/2025 2/14/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 2/10/2025 2/14/2025 IP 71124.04 000728 Occupational Dose Assessment Emergency Preparedness Program Inspection / Performance Indicator Review
1,2 2/24/2025 2/28/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 2/24/2025 2/28/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 2/24/2025 2/28/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 2/24/2025 2/28/2025 IP 71151 001397 Performance Indicator Verification Functional Engineering Inspection - Aging of Structures, Systems, and Components
1,2 4/28/2025 5/16/2025 IP 71111.21N.04 001832 Age-Related Degradation Material Control and Accounting Inspection
1,2 6/1/2025 7/31/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
LaSalle September 2025 Initial License Examination
1,2 8/17/2025 8/23/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 9/21/2025 9/27/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Radiation Protection Baseline Inspection
1,2 8/18/2025 8/22/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 8/18/2025 8/22/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program Security Baseline Inspection
1,2 8/4/2025 8/8/2025 IP 71130.07 000739 Security Training 1,2 8/4/2025 8/8/2025 IP 71130.09 001656 Security Plan Changes 1,2 8/4/2025 8/8/2025 IP 71151 001338 Performance Indicator Verification 1,2 9/15/2025 9/19/2025 IP 71130.02 000734 Access Control 1,2 9/15/2025 9/19/2025 IP 71130.05 000737 Protective Strategy Evaluation LaSalle 2025 Biennial Licensed Operator Requalification Inspection
1,2 10/20/2025 10/24/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Radiation Protection Baseline Inspection
1,2 10/27/2025 10/31/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 10/27/2025 10/31/2025 IP 71151 000746 Performance Indicator Verification Eplan and EAL Changes Review
Prepared on 2/28/2025 12:42:21 PM 1 of 3
Site Inspection Activity Plan 1,2 11/1/2025 12/31/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Biennial Problem Identification and Resolution Inspection
1,2 11/3/2025 11/21/2025 IP 71152B 000747 Problem Identification and Resolution Corporate Security Baseline Inspection
1,2 2/2/2026 2/6/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 2/2/2026 2/6/2026 IP 71130.08 000740 Fitness-For-Duty Program Inservice Inspection - Unit 1
1 2/9/2026 2/20/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Radiation Protection Baseline Inspection
1,2 2/9/2026 2/13/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 2/9/2026 2/13/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Security Baseline Inspection
1,2 6/22/2026 6/26/2026 IP 71130.14 000743 Review of Power Reactor Target Sets Emergency Preparedness Exercise Inspection / Performance Indicator Verification
1,2 6/1/2026 7/17/2026 IP 71114.08 000723 Exercise Evaluation - Scenario Review 1,2 7/13/2026 7/17/2026 IP 71114.01 000716 Exercise Evaluation 1,2 7/13/2026 7/17/2026 IP 71151 001397 Performance Indicator Verification Cyber Security
1,2 7/13/2026 7/17/2026 IP 71130.10 000741 Cybersecurity Radiation Protection Baseline Inspection
1,2 7/27/2026 7/31/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation LaSalle September 2026 Initial License Examination
1,2 8/23/2026 8/29/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 9/27/2026 10/10/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Security Baseline Inspection
1,2 9/7/2026 9/11/2026 IP 71130.02 000734 Access Control 1,2 9/7/2026 9/11/2026 IP 71130.09 001656 Security Plan Changes 1,2 9/7/2026 9/11/2026 IP 71151 001338 Performance Indicator Verification Comprehensive Engineering Team Inspection
1,2 10/5/2026 10/23/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Radiation Protection Baseline Inspection
1,2 10/5/2026 10/9/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 10/5/2026 10/9/2026 IP 71124.04 000728 Occupational Dose Assessment 1,2 10/5/2026 10/9/2026 IP 71151 000746 Performance Indicator Verification EAL & EPlan Changes Review
1,2 11/1/2026 12/31/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Prepared on 2/28/2025 12:42:21 PM 2 of 3
Site Inspection Activity Plan Prepared on 2/28/2025 12:42:21 PM 3 of 3