Insp Rept 50-362/88-13 on 880502-0603.No Violations Noted. Major Areas Inspected:Inservice Insp Activities & Insp Procedures 30703,73051,73052,73753,73755,92701 & 92703 Covered
ML20150D631
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/24/1988
From: Clark C, Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20150D629 List:
References
50-362-88-13, NUDOCS 8807140082
Download: ML20150D631 (6)


Text

p '(a '

g~ , .

' ! j, ~t' 1 l ' ' h .i ,e

'

,

.

JJ

'

-

c U. S.- NUCLEAR REGULATORY COP 911SSIO .1 REGION V y-

. ,

'

Report'No. 50'-362/88-13 Docket No. 50-362-License No. NPF-15

.

s Licensee: Southern California ~ Edison Comphny P. O. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770

, Facility Name: San-Onofre Nuclear Generating Station Unit 3 Inspection at: San Clemente, California Inspection Conducted: 'Mr.y 2 - June 3, 1988 Inspector: 8/ -

8 [

, C.gark,ReactrIspector Date Signed Approved by: M/s '

S. Richards', Chi'ef

  1. d Mr 4 1 /

Dnte signed Engineering-Section

/

Inspection Summary:

-Inspection Durina the Period May 2 - June 3, 1988 (Report No. 50-362/88-13)

Areas Inspected: A routine. announced inspection of Unit 3 Inservice Inspection (ISI) activitie Inspection procedures 30703, 73051, 73052, 73753,_73755, 92701 and 92703 were covered during this inspectio Results:

General Conclusions and Specific Findinas: The licensee ISI program appeared to be adequate in the areas reviewed.

i Stanificant Safety Matters: None Summary of Violations: None

,

Open Item Summary: Five items closed, none ope .-

8807140082 880 62 PDR ADOCK O 0 PNV

,

O

'

,

..

.

3EYAILS 1. Persons Qonta_cted Licensee

  • H. Wharton, Assistant Technical Manager
  • C. Couser, Lead Compliance Engineer
  • J. Hundis, Nuclear Services Supervisor
  • J. Boardman, ISI Engineer
  • R. Retana, QA Engineer Contractor Personnel P. Lenz, ISI Engineer - Combustion Engineering J. Westphall, Authorized Nuclear Inservice Inspector (ANII) -

Kemper Group D. Manning, Authorized Nuclear Inservice Inspector (ANII) - Kemper Group

  • Denotes those personnel in attendance at the exit meeting on May 20, 198 The inspector also held discussions with other licensee and contractor personnel involved with Inservice Inspection activitie . Inservice Inspection - Review of Program (73051) Program Approval In a letter dated July 5, 1983 from K. P. Baskin (SCE) to Miraglia (NRC), the licensee submitted the first 10 year Inservice Inspection (ISI) program for San Onofre Unit There has been additional correspondence and meetings between the licensee and NRC on the Unit 3 ISI progra At the date of this inspection, NRC had not yet completed its review and issued a Safety Evaluation Report (SER) on this progra . Program Organization The Unit 3 ISI program is based on the requirements of the ASME code,Section XI, 1977 edition, through the 1979 summer addend The ISI program examination area summary sheets from manual M38219, list the areas to be examined, the method and extent of the examination, calibration blocks required and other useful information. The ISI program is established by Operations and Maintenance (0&M) support order 50123-IN-1, "Inservice Inspection Program, Revision 1 of July 30, 1987. The ISI program is implemented by O&M support procedure 50123-XVII-1, "Inservice Inspection Program Implementation", Revision 3 of November 21, 198 ,Je

.

J The ISI program is updated and revised by the licensee, per O&M y support procedure 50123-XVII-1.1, "Inservice Inspection Program Maintenance", Revision 1 of January 26, 198 '

~

The licensee's repair and replacement program is addi nsed in 0&M support procedure 50123-XVII-3,:"ASME Section XI Repair and Replacement Program Administration", Revision 0, TCN No. 0-4 of April 27, 1988. This procedure meets the requirements of the ASME code, section XI, for both a repair program (as specified in article IWA-4000) and a replacement program (as specified in article

.IWA-7000), Quality Assurance Program Topical Report SCE-1A, Quality Assurance Program, Amendment 10 dated July 1987, addressed QA involvement in the ISI program. Discussions with the QA audit group and the surveillance group, identified that there had been no recent audits or surveillances performed in the ISI are Around the first of 1988, the licensee created a special projects group in the surveillance group. This group elected to minimize the surveillances of ISI activities, since there was no history of major problems in this area at the licensee facility, or other facilities checke No violations or deviations were identified in the areas reviewe . Inservice Inspection - Review of Procedures (73052)

A sample of the latest revisions of applicable ISI procedures, issued since the last ISI review, were reviewed by the inspector to assure compliance with the ISI program. All procedures specified qualification and certification of NDE personnel, where applicable. The methods of recording, evaluating, and dispositioning findings and reporting requirements were addressed in the applicable procedures in accordance with the applicable code requirements. The technical content, such as, method of examination, extent, and technique, were adequately described in conformance with the requirements and guidance of the ASME Code, Section No violations or deviations were identified in the areas reviewe . Inservice Inspection - Observation of Work and Work Activities (73753)

This was the licensee's cycle 4, third refueling outage, and the second ISI period of the first ten year ISI interval. The contractor ISI examiners were provided by combustion engineerin The inspector reviewed the qualifications and certification records for the ISI examiners. The inspector observed available ultrasonic (UT),

liquid penetrant (PT) and visual (VT) examinations performed on steam generator no. 2 continuous blowdown piping and associated support i

L

_ ._ _ _ _ _ _ ____ _ . l

- -

p

.l

...

3 1

.

.

members, cold leg loop 1A steam generator to pump and pump to reactor .l vessel pipin l No violations or deviations were identified in the areas reviewe . Inservice Inspection Data Review and Evaluation (73755)

The inspector reviewed all-the available NDE ISI data sheets generated ,

prior to and during this. inspectio l No violations or deviations were identified in the areas reviewe . Followup of Previously Identified Items (92701 and 92703) (Closed) Open Item (50-362/87-03-01) ISI Procedure Changes to Ensure Timely Responses for ISI Items Found on an Operating Unit (Unit 3)

During a previous inspection, the inspector found that contractor ISI Visual (UT) examinations had identified potentially missing support items on an operating unit. The unit operated for an additional three weeks, prior to shutdown for a refueling outage, without receiving any operability assessments of the ISI examination results. The inspector concluded that the existing licensee ISI procedures did not incorporate the same timely Quality Assurance / licensee responses in all cases, for potential or actual nonconforming, rejected or missing items found during ISI examinations, that other non-ISI licensee procedures di The licensee issued Temporary Change Notice (TCN) No. 1-2 to 0&M support procedure 50123-XVII-1,0, "Inservice Inspection Program Implementation", Revision 1 on March 4, 1987, to correct the identified weakness. This item is closed, (Closed) Open Item (50-362/87-03-02) ISI Personnel Understanding of Drawing Updates During a previous inspection, the inspector identified that it appeared that both licensee and contractor personnel had different understandings of where the latest information on changes to plant configurations were recorded. These same people, also did not agree on how soon after changes occurred, that they would appear on the applicable diagrams / drawing As a result of this identified confusion, the licensee issued a memorandum to file on May 22, 1987, entitled "sources to consult to confirm the existence and location of piping, components, and supports, San Onofre Nuclear Generating Station, Units 2 and 3". It appears that if all the applicable personnel are aware of this memorandum and its contents, this should reduce the confusio This item is close . . _ ~. -

-

, , .

4 i

- . - Sc

- .

\

~

l

.

- (Closed) 0 pen Item (50-362/86-14-P) Part 21 - Autematic Sprinkler Model C Deluge Valves Failed to Open Certain 6 inch Model "C" deluge valves were reported to be vulnerable to repeated failures by Automatic Sprinkler Corporatio :This Part 21 report was issued to apprise licensee of cor.tinuing problemsLwith~the Model "C" deluge valve The licensee identified that the Model "C"' automatic sprinkler deluge valves utilized at SONGS are' included in the serial numbers

-

identified in the Automatic Sprinkler Corporation notic Therefore, the licensee implemented the recommended lubricant maintenance program for the valves and according to the licensee's Independant Safety Engineering Group Document,No. IEN 84-16, dated April 16,1984, no failure of the valves to actuate has been observed during biannual surveillance test This item is closed, (Closed) Open Item (50-362/86-14-P1) Part 21 - Automatic Sprinkler Corp Mercury Check Device Leakage and Update on Model C Valves A November 5,1986 letter from Automatic Sprinkler Corporation of America (ASC0A) forwarded the final solution to the model C delute-valve problem identified in the December 12, 1985 ASC0A letter (0 pen Item 50-362/86-14-P) and identified a new mercury check device proble This letter identified that in addition to ASCOA first option of the application of special lubricant to both the clapper and latch surfaces after smoothing and cleaning, a second option was to retrofit the valves with a new clapper latch assembly and latch arm. The mercury check devices which are a component of rate-of-rise sprinkler systems, are made up' of two molded plastic parts which are bonded together, and over a period of' time have developed leaks in the bond are In response this November 5, 1986 ASC0A lotter, the licensee issued an independent safety engineering group (ISEG) operating experience evaluation form (ISEG Log Number 86-ISEG-222) dated April 22, 1987. In this evaluation reply, the licensee identified the following:

.

(1) The licensee had already issued a new revision to maintenance procedure S 123-I-8.155, in September of 1986, to adopt the option of applying lubricant to the applicable valve part (2) The licensee was not interested in retrofit of the valve (3) Review of the licensee fire protection (FP) systems, confirmed that the' subject mercury check device is nci used at the licensee facilit Based on review of applicable licensee documents, it appears appropriate action was taken on this ite This item is close (Closed) Open Item (50-362/GL-85-22) Generic Letter - Potential for Loss of Post-LOCA Recirculation Capability Dte to Insulation Debris Blockage

'

. : ;v 5 .

..

,.

4 I

..

The licensee performed an engineering evaluation of this generic

'

safety concern for Units 2 and 3,'and issued a memorandum to file from F. M. Badwan, dated July 7, 1986. This memorandum stated that full size sump model testing was performed,. using blockage of up to 90%, without experiencing vortexin It appears the licensee has taken appropriate action on this ite This item is close . Exit Meetina

' The inspector met with licensee management-representative denoted in paragraph 1 an May 20, 1988. The scope of the inspection and the inspector's finding up to the time of the meeting, were discusse At this meeting the_ inspector identified that he had obtained some information on open items, that would be reviewed later and the findings documented in this report. The open item information was reviewed and the finding included in paragraph 6 of this report.

.,