June 24, 1988 Docket Nos.:
50- 361 and 50-362 Mr. Kenneth P. Baskin Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations 2244 Walnut Grove Avenue San Diego Gas and Electric Company Post Office Box 800 101 Ash Street Rosemead, California 91770 Post Office Box 1831 San Diego, California 92112 Gentlemen:
SUBJECT:
SER FOR GENERIC LETTER 83.28 ITEM 4.2 (PARTS 1 AND 2)
(TAC NOS. 53149 AND 53150)
Enclosed is the staff's safety evaluation for the subject issue.
The staff requests that you confirm in writing that your procedures specify that the armature of the undervoltage trip attachment be down in the energized position when measuring the roller rivet armature clearance. When this confirmation is received, this issue will be closed. If you have any questions concerning this action please contact me.
Sincerely, original signed by Donald E. Hickman, Project Manager Project Directorate V Division of Reactor Projects -
- III, IV, V and Special Projects
Enclosure:
As stated cc:
See next page DISTRIBUTION Docket File DHickman Local PDRs OGC PDV Reading EJordan GMHolahan JPartlow ACRS (10)
CTrammell WHodges
&elw D
DEHickman:dr ton 6/3/88 6
88 OFFICIAL RECORD COPY PDR ADOCK 5000
June 24, 1988 Docket Nos.:
50- 361 and 50-362 Mr. Kenneth P. Baskin Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations 2244 Walnut Grove Avenue San Diego Gas and Electric Company Post Office Box 800 101 Ash Street Rosemead, California 91770 Post Office Box 1831 San Diego, California 92112 Gentlemen:
SUBJECT:
SER FOR GENERIC LETTER 83.28 ITEM 4.2 (PARTS 1 AND 2)
(TAC NOS. 53149 AND 53150)
Enclosed is the staff's safety evaluation for the subject issue. The staff requests that you confirm in writing that your procedures specify that the armature of the undervoltage trip attachment be down in the energized position when measuring the roller rivet armature clearance. When this confirmation is received, this issue will be closed. If you have any questions concerning this action please contact me.
Sincerely, original signed by Donald E. Hickman, Project Manager Project Directorate V Division of Reactor Projects -
- III, IV, V and Special Projects
Enclosure:
As stated cc:
See next page DISTRIBUTION Docket File DHickman Local PDRs OGC PDV Reading EJordan GMHolahan JPartlow ACRS (10)
CTrammell WHodges D
DEHickman:dr ton 6/73/88 64/188 OFFICIAL RECORD COPY
AS REG& k UNITED STATES 0
NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D. C. 20555 June 24, 1988 Docket Nos.:
50- 361 and 50-362 Mr. Kenneth P. Baskin Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations 2244 Walnut Grove Avenue San Diego Gas and Electric Company Post Office Box 800 101 Ash Street Rosemead, California 91770 Post Office Box 1831 San Diego, California 92112 Gentlemen:
SUBJECT:
SER FOR GENERIC LETTER 83.28 ITEM 4.2 (PARTS 1 AND 2)
(TAC NOS. 53149 AND 53150)
Enclosed is the staff's safety evaluation for the subject issue. The staff requests that you confirm in writing that your procedures specify that the armature of the undervoltage trip attachment be down in the energized position when measuring the roller rivet armature clearance. When this confirmation is received, this issue will be closed. If you have any questions concerning this action please contact me.
Sincerely, Donald E. Hickman, Project Manager Project Directorate V Division of Reactor Projects -
- III, IV, V and Special Projects
Enclosure:
As stated cc: See next page
Mr. Kenneth P. Baskin San Onofre Nuclear Generating Southern California Edison Company Station, Units 2 and 3 cc:
Mr. Gary D. Cotton Mr. Hans Kaspar, Executive Director Senior Vice President Marine Review Comittee, Inc.
Engineering and Operations 531 Encinitas Boulevard, Suite 105 San Diego Gas & Electric Company Encinitas, California 92024 101 Ash Street Post Office Box 1831 San Diego, California 92112 Mr. Mark Medford Southern California Edison Comipany Charles R. Kocher, Esq.
2244 Walnut Grove Avenue James A. Beoletto, Esq.
P. 0. Box 800 Southern California Edison Company Rosemead, California 91770 2244 Walnut Grove Avenue P. 0. Box 800 Mr. Robert G. Lacy Rosemead, California 91770 Manager, Nuclear Department San Diego Gas & Electric Company Orrick, Herrington & Sutcliffe P. 0. Box 1831 ATTN: David R. Pigott, Esq.
San Diego, California 92112 600 Montgomery Street San Francisco, California 94111 Richard J. Wharton, Esq.
University of San.Diego School of Alan R. Watts, Esq.
Law Rourke & Woodruff Environmental Law Clinic 701 S. Parker St. No. 7000 San Diego, California 92110 Orange, California 92668-4702 Charles E. McClung, Or., Esq.
Attorney at Law Mr. S. McClusky 24012 Calle de la Plaza/Suite 330 Bechtel Power Corporation Laguna Hills, California 92653 P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. C. B. Brinkman 1450 Maria Lane/Suite 210 Combustion Engineering, Inc.
Walnut Creek, California 94596 7910 Woodmont Avenue, Suite 1310 Bethesda, Maryland 20814 Resident Inspector, San Onofre NPS c/o U. S. Nuclear Regulatory Commission Mr. Dennis F. Kirsh Post Office Box 4329 U.S. Nuclear Regulatory Commission San Clemente, California 92672 Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Dennis M. Smith, Chief Radiological Programs Division Governor's Office of Emergency Services 2800 Meadowview Road Sacramento, California 95832