Partially Withheld Insp Repts 50-361/97-14 & 50-362/97-14 on 970609-13 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Review of Testing & Maint,Plans & Procedures, Audits,Access Authorization & Protection of Safeguards Info
ML20247H116
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/14/1997
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20247H072 List:
References
50-361-97-14, 50-362-97-14, NUDOCS 9805210066
Download: ML20247H116 (2)


Text

(

.

.

!

DOCUMENT CONTAINS

! ENCLOSURE U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket Nos.: 50-361; 50-362

,

License Nos.: NPF-10; NPF-15 l

Report No.:

50-361/97-14 50-362/97-1 4

l Licensee:

Southern California Edison Co.

Facility:

San Onofre Nuclear Generating Station, Units 2 and

Location:

5000 S. Pacific Coast Hwy.

San Clemente, California Dates:

June 9-13,1997 Inspector-A. B. Earnest, Security Specialist. Plant Support Branch i

Approved By: B. Murray, Chief, Plant Support Branch ATTACHMENT: Supplemental Information l

.

m32gg gpg1

,

DOCUMENT CONTAINS ENCLOSURE (S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED

_ _ _ ___________ - ________ - ____ - _____________________

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _.. _ _.

.

..

-2-DOCUMENT CONTAINS EXECUTIVE SUMMARY San Onofre Nuclear Generating Station, Units 2 and 3 NRC Inspection Report 50-361/97-14; 50-362/97-14 This routine, announced inspection focused on the licensee's physical security i

program. The areas inspected included review of testing and maintenance, plans and.

'

procedures, audits, access authorization, protection of safeguards information, training and qualifications, and lock and key control.

Plant Sucoort A very good test and maintenance program was in effect (Section S1.1).

(Section S1.2).

In general, a good audit /self-assessment program was implemented.

  • However, two weaknesses in the 1996 security program audit were

'

identified, involving the lack of security expertise on the audit team and not including some security areas during the audit.

The access authorization program was very effectively implemented

(Section S1.4).

The safeguards information program was very effectively implemented

(Section S1.5).

The training and qualifications program was a significant program strength

(Section S1.6).

A weakness was identified in the accountability for security locks and keys

(Section S1.7).