IR 05000361/1993001
| ML20044D334 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/26/1993 |
| From: | Miller L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| References | |
| NUDOCS 9305190011 | |
| Download: ML20044D334 (3) | |
Text
.
- -.
__
i
/.#pa arcN UNrrED STATES o
[V
t NUCLEAR REGULATORY COMMISSION
.
3,h' k. $ '
REGION V
ri r
S
%'
8,f 1450 MARIA LANE
'%
WALNUT CREEK. CALIFORNLA 94596-5368 RR261933 i
h Docket No.
50-361 50-362
,
!
Southern California Edison Company
Irvine Operations Center 23 Parker Street Irvine, CA 92718 Attention:
Mr. Harold B. Ray Senior Vice President
!
Gentlemen:
j Thank you for your letter of March 26, 1993, in response to our Notice of Violation and Inspection Report No. 50-206/93-01, 50-361/93-01, and l
50-362/93-01, dated February 25, 1993, informing us of the steps you have
,
taken to correct the items which we brought to your attention.
Your l
corrective actions will be verified during a future inspection.
!:
t Your cooperation with us is appreciated.
Sincerely, q
.
. F. Miller,.
., Chief t
Reactor Safety Branch
cc
!
James A. Beoletto, Esq., Southern California Edison Company Chairman, Board of Supervisors, County of San Diego
Alan R. Watts, Esq., Rourke & Woodruff Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power Mr. Don J. Womeldorf, Chief, Environmental Management Branch
Mr. Richard J. Kosiba, Project Manager, Bechtel Power Corporation
!
Mr. Robert G. Lacy, Manager, Nuclear Department Mr. Steve Shu, Radiologic Health Branch Mayor City of San Clemente j
i
.
I 9305190011 930426 PDR ADDCK 05000361 i
G PDR
{
>\\
l Teol l
j
.,
lie 8261993 i
^^
Docket No.~
50-361-t 50-362
,
,
Southern California Edison Company I
Irvine Operations Center
{
23 Parker Street
Irvine, CA 92718 Attention:
Mr. Harold B. Ray
!
Senior Vice President j
,
Gentlemen:
l
!
Thank you for your letter of March 26, 1993, in response to our Notice of Violation and Inspection Report No. 50-206/93-01, 50-361/93-01, and
?
50-362/93-01, dated February 25, 1993, informing us of the steps you have
-!
taken to correct the items which we brought to your attention. Your l
corrective actions will be verified during a future inspection.
l
Your cooperation with us is appreciated.
!
!
Sincerely, j
i l
.
L. F. Miller, Jr., Chief l
Reactor Safety Branch i
!
CC:
.
James A. Beoletto, Esq., Southern California Edison Company i
Chairman, Board of Supervisors, County of San Diego
{
Alan R. Watts, Esq., Rourke & Woodruff
Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department l
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power
'
Mr. Don J. Womeldorf, Chief, Environmental Management Branch i
Mr. Richard J. Kosiba, Project Manager, Bechtel Power Corporation Mr. Robert G. Lacy, Manager, Nuclear Department
-
Mr. Steve Shu, Radiologic Health Branch Mayor City of San Clemente j
'
bcc w/ copy of letter dated March 26, 1993:
Docket File
,
Resident Inspector
Project Inspector j
G. Cook i
R. Huey B. Faulkenberry
J. Martin J. Zollicoffer bcc w/o copy of letter dated March 26, 1993:
M. Smith
..
{
..
}F l
Region Viann g os DAcker 7 ;
ee RHuey Wang HWong i
Hh
",
i A l >+ G I /
4/w/R3 y 12/9]
,
REQ [E3T COPY] REQUEST Y] REQUEST COPY) REQUESTEtP,YFR STCDFVJ
"
j YESi /.N0i 1 YES / N0 1 YES / N0 1 YES / / ND' 1 ES
/ N0 1
,r yu
-
v
-
v Ilier,
.
!
fly")
TO DCS)
). T PDR]
NEQUEST CeP)i]
.
YES / do 1 E
/ N0 1 (ES / N0 1
,
.
v v
v
!
i
.
a i
i
!
!
!
i
f
.
a
i
,
.
.
-
Y
.~
'
.
.
.
.
..
...
,
-
_-
,,
$
Southem Califomia Edison Company 3 ;;
.p 23 PARKER ST REET IRVINC. CALtrORNIA 92788
- A ROL D B. R AY
,E Lt ho E
{
u..c
..c.
....,
... oo
March 26, 1993 l
!
!
!
i U.
S.
Nuclear Regulatory Commission
!
Attention:
Document Control Desk
_
-
f Washington, D.C.
20555 Gentlemen:
'
Subject:
Docket Nos. 50-361 and 50-362 Reply to a Notice of Violation
San Onofre Nuclear Generating Station, Units 2 and 3 Reference:
Letter from Mr.
L. F. Miller (USNRC) to l
Harold B.
Ray (SCE), dated February 25, 1993 l
The referenced letter forwarded a Notice of Violation resulting from the NRC inspection conducted from January 11, 1993 through-January 29, 1993, at the San Onofre Nuclear' Generating Station,
!
Units 1, 2,
and 3.
This inspection was documented in NRC
!
Inspection Report Nos. 50-206/93-01, 50-361/93-01, and 50-362/93-f 01.
,
!
In accordance with 10 CFR 2.201, the enclosure to this letter j
provides the Southern California Edison -(SCE) reply to the Notice l
of Violation.
I I
If you have any questions regarding SCE's response to the Notice
-!
of Violation or require ~ additional information, please call me.
Sincerely t,, J
,
!
!
Enclosure
!
!
!
t cc:
J.
B. Martin, Regional Administrator, NRC Region V
!
M.
B.
Fields, NRC Project Manager, San Onofre Units 2 and 3 i
C.
W.
Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2,
&3
i
!
C p,, ' o?A h l
i
.
l
>
.
.
-
.
-
-
-
-
- -..-
._.
t
.-
.s
-
e
,?
.
,
l ENCLOSURE i
I
REPLY TO A NOTICE OF VIOLATION j
,
t The enclosure to Mr. Miller's letter dated February 25, 1993,
[
states in part:
"A.
10 CFR Part 50, Appendix B, Criterion XVI, ' Corrective l
Actions,' states: ' Measures shall be established to assure l
that conditions adverse to quality, such as...
deviations...
are promptly identified and corrected.'
" San Onofre Units 2 and 3 Updated Final Safety Analysis
Report (UFSAR), Section 9.5.4.1.
states: 'The diesel
!
generator fuel system is designed to ANSI standard N-195.'
,
t
" ANSI standard N-195, Appendix B,
' Alternate Calculation of
Fuel Oil Storage Capacity,' states:
'A minimum of 10% is.
t added to the calculated storage requirement if this
!
I alternative calculational appro'ach is used.'
i
" Contrary to the above, on June 18, 1991, the Licensee issued Calculation M-0016-008, supplement A,
'DG n-ite Fuel Oil Requirements' which did not include the 10 percent margin required for determining minimum fuel oil storage capacity even though this error was identified in Inspection Report 50-361, 50-362/89-200, dated January 12, 1990.
Calculation M-0016-008 superseded Calculation M16.4.
Both l
calculations used ANSI standard N195, Appendix B, methods.
'
The licensee did not correct the 10% margin omission until January 25, 1993.
"This is a severity Level IV violation (Supplement'I)."
1 i
l
.,-
-
-
,--
.
.
-
-
,
_
.-
.-
--.. ~_ -
.. - - -. -.
..
..
-.
.
.
F
}*
.'
l
-
i l
,
!*
l
.
-
REPLY TO NOTICE OF VIOLATION-2-
!
d l
i l
RESPONSE j
,
I
,
I.
REASON FOR THE VIOLATION l
!
'
Failure to Document Discrepancy (
i
,
Contrary to procedures and training, SCE individuals j
were aware of the error in the calculation but failed to l
'
initiate a corrective action document when the omission was l
-
identified.
A Nonconformance Report (NCR) or other-
!
corrective action document should have been generated to f
"
document the deficiency.
l r
II.
CORRECTIVE STEPS THAT HAVE BEEN TAKEN
-
I
,
l Calculation Revised l
I-l
i In January 1993, prior to the NRC inspection, SCE was j
'
preparing Interin Calculation Change Notices (ICCNs) for j
calculation M-0016-008 (which superseded M16.4) to j
incorporate additional loads on the diesel resulting from i
on-going design tasks.
During the process, SCE discovered l
the omission of the 10% margin in the calculation and
'l documented it on an NCR on January 12, 1993, in accordance
[
i with corrective action procedures.
Revision 2 to M-0016-008
!
"
was issued on January 25, 1993, to correct the 10% margin i
'
j omission.
The revision also incorporated the design changes-
!
in lieu of the ICCNs.
$
!
Previous Corrective Action and Procram Enhancements
,
Subsequent to 'the time personnel failed to document the
,
.
deficiency, Engineering instituted substantial program and j
i training improvements.
In 1990 as part of this improvement t
l effort, SCE instituted an enhanced training program titled i
i
" Technical Training for Nuclear Engineering and Design f
'
Organization - (NEDO) Personnel."
The training program j
includes training modules on " Problem Reporting Mechanisms,"
'
>
" Drawings, Codes and Standards," and "Nonconformance Reports
{
(NCRs)."
The training is required for all NEDO system l
j.
engineers and supervisors.
i
!
This enhanced training program educates engineers to f
"
promptly initiate appropriate corrective action documents t
when errors and other deficiencies are identified in design l
documents, including calculations.
l l
i
!
t III. CORRECTIVE STEPS THAT WILL BE TAKEN i
,
!
No further corrective actions are required.
,
i
,
-.
.
.
- -. -
-
-
-
_ _ _.
_ _..
._ _ _._.
.. _.
_
.. _. _...
__
.. _ _ _.
_
,
-
_
'.-
-
,
,
!
.
f.
.
REPLY TO NOTICE OF VIDIATION-3-
'
.
'
,
IV.
DATE WHEN FULL COMPLIANCE WAS ACHIEVED l
l Full compliance was achieved on January 25, 1993, when l
the calculation was revised to include the 10% margin in the
'
-
Diesel Generator fuel oil calculation.
,
i i
't
'
!
!
t
,
- b
.)
!
i i
i i
!
-1
A s
,
,
'f
'
I i
i l
i U
i
!
h
!
l
i t
<
.
,
J l
i
!
I
i
!
l
'
n f
,
'
'
.
.
)
l
,
4'
i l
i a
)
i'
i i
.I q
-
i
--
-
.
-.
.
.
-