IR 05000352/2012004

From kanterella
Jump to navigation Jump to search
Reply to Notice of Violation, IR 05000352-12-004 and 05000353-12-004
ML12345A177
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/10/2012
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Dougherty T
Exelon Generation Co
KROHN, PG
References
IR-12-004
Download: ML12345A177 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 10, 2012

SUBJECT:

LIMERICK GENERATING STATION REPLY TO NOTICE OF VIOLATION -

NRC INTEGRATED INSPECTION REPORT 05000352/2012004 AND 05000353/2012004

Dear Mr. Dougherty:

Thank you for your letter of November 30, 2012 (ML12342A271) in response to our November 1, 2012, letter and Notice of Violation (ML12306A397) which cited Exelon for being in violation of Limerick Generating Station Unit 1 Technical Specification 6.8, Procedures and Programs, when Limerick operators did not adequately implement an alarm response procedure when responding to a main control room alarm on July 11, 2012. Specifically, operators failed to immediately reduce power per the alarm response procedure after the main control room received the alarm condition. The NRC will review the implementation of your corrective actions during a future inspection to verify that full compliance has been achieved and maintained.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ

Mr. Thomas Vice President, Limerick Generating Station 3146 Sanatoga Road Pottstown, PA 19464 SUBJECT: LIMERICK GENERATING STATION REPLY TO NOTICE OF VIOLATION -

NRC INTEGRATED INSPECTION REPORT 05000352/2012004 AND 05000353/2012004

Dear Mr. Dougherty:

Thank you for your letter of November 30, 2012 (ML12342A271) in response to our November 1, 2012, letter and Notice of Violation (ML12306A397) which cited Exelon for being in violation of Limerick Generating Station Unit 1 Technical Specification 6.8, Procedures and Programs, when Limerick operators did not adequately implement an alarm response procedure when responding to a main control room alarm on July 11, 2012. Specifically, operators failed to immediately reduce power per the alarm response procedure after the main control room received the alarm condition. The NRC will review the implementation of your corrective actions during a future inspection to verify that full compliance has been achieved and maintained.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ Distribution w/encl: (via E-mail)

D. Roberts, DRP D. Jackson, DRS P. Wilson, DRP E. DiPaolo, DRP, SRI M. McLaughlin, ORA P. Krohn, DRP M. Gray, DRP J. Hawkins, DRP, RI A. Rosebrook, DRP N. Esch, DRP, OA S. Ibarrola, DRP D. Holody, ORA DOCUMENT NAME: G\DRP\BRANCH4\ENFORCEMENT\LGS\LIMERICK FAILURE TO FOLLOW ARC NOV ACKNOWLEDGMENT LETTER - REV1 .DOCX ADAMS Accession No: ML12345A177 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/ AAR PKrohn/ PGK DATE 12/07/12 12/10/12