IR 05000352/1993028

From kanterella
Jump to navigation Jump to search
Errata to Forwarding Insp Repts 50-352/93-28 & 50-353/93-28.Replaces Date of 930103 w/940103
ML20059L046
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/03/1994
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20059L045 List:
References
NUDOCS 9402030073
Download: ML20059L046 (3)


Text

- ,

.-

.

.

-JAN 3 l994 Docket Nos. 50-352 50-353 Mr. D. Senior Vice President - Nuclear Philadelphia Electric Company Nuclear Group Headquarters .

Correspondence Control Desk P. O. Box 195 Wayne, PA 19087-0195

Dear Mr. Smith:

SUBJECT: MOTOR-OPERATED VALVE INSPECTION AT LIMERICK GENERATING STATION, REPORT NOS. 50-352/93-28 AND 50-353/93-28 This letter refers to the announced inspection conducted by Mr. Thomas J. Kenny, Ms. Beth Korona. and Mr. Mark Holbrook on November 15-19, 1993, at the Limerick Generating Station, to address the status of improvement items discussed in Table 1 of NRC Inspection Report Nos. 50-352/92-80 and 50-353/92-80. The results o' f this inspection were discussed with Mr. David R. Helwig, Vice President Limerick Generating Station, on November 22,1993.

The inspectors reviewed procedures, representative records, interviewed personnel,'and-overall observed areas important to public health and safety. The inspection focused on the ;

motor-operated valve (MOV) program and the implementation of program enhancements ,

developed in response to previous NRC team inspections in this area. This program implementation inspection was used to determine progress toward the scheduled program completion date and to assure satisfactory implementation of your commitments to regulatory requirements. The inspectors noted substantial improvements to your GL 89-10 program as well as improved communications betiveen the on and off site engineering departments.

,

9402030073 940114-PDR ADOCK 05000352 O PDR

. -. . _. - . _ - . . . -- . .- . . .

...

,- JAN 3 1994

'

..:

>

. .

,

Philadelphia Electric Company No reply to this letter is required. Your cooperation in this matter is appreciated.

Sincerely, d

Jac

% Vc )

P. Durr, Chief Engineering Branch Division of Reactor Safety Enclosure: NRC Region I Inspenion Report Nos. 50-352/93-28 and 50-353/93-28 cc w/ encl:

J. Doering, Chairman, Nuclear Review Board D. R. Helwig, Vice President - Limerick Generating Station >

G. A. Hunger, Jr., Manager - Licensing Section J. L. Kantner, Regulatory Engineer - Limerick Generating Station Secretary, Nuclear Committee of the Board

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector Commonwealth of Pennsylvania

!

i

.,

i l

.

}

l

!

. , . . - . - - _ . _ _ - _ .

...

_JAN 3 1994 Philadelphia Electric Company. 3 .

bec w/ encl: 1-Region I Docket Room (with concurrences)

bec w/ encl: (Via E-Mail)

V. McCree, OEDO F. Rinaldi, NRR L. Nicholson, Acting PDI-2, NRR

,

P

?

,

't LJA )' /

. RI:DRS RI:DRS R DRS Kenny Eapen Durr t

////93 - ) //[93 ?f/f3

'

OFFICIAL RECORD COPY A: LIM 9328. INS

,

4 --