Text
_,/
- b UNITED STATES yi NUCLEAR REGULATORY COMMISSION n
REGION V
g
.,i 3%,,,,*/
1450 MARIA LANE WALNUT CREEK, CALIFORNIA 94596-5368 JUL 2 0 is93 Docket No. 50-344 Portland General Electric Co.
121 S. W. Salmon St.
'
Portland, OR 97204
Attention:
Mr. James E. Cross
~
l Vice President and Chief Nuclear Officer Thank you for your letter of June 14, 1993, in response to our Notice of Violation and Inspection Report No. 50-344/93-06, dated May 20, 1993, informing us of the steps you have taken to correct the items which we brought to your attention.
Your corrective actions will be verified during a future inspection.
,
Your cooperation with us is appreciated.
Sincerely, C.A.VanDenburgII,d[ef
^
Reactor Projects Branch cc:
i Mr. Michael J. Sykes, Chairman, Board of County Commissioners, Columbia County Mr. David Stewart-Smith, Oregon Department of Energy
,
Mr. Tom Walt, General Manager, Technical Functions Mr. Lloyd K. Marbet l
Mr. Jerry Wilson, Do It Yourself Committee i
Mr. Eugene Rosolie, Northwest Environmental Advocates
!
r 9300030000 930720 j
PDR ADOCK 05000344:
O PDR
\\
'
'
S EDl -
.
- -
.
.I
!
!
.
Docket No. 50-344 JUL 2 01993 Portland General Electric Co.
121 S. W. Salmon St.
Portland, OR 97204 Attention:
Mr. James E. Cross Vice President and Chief Nuclear Officer
/
GentJ
'n:
y Thank you for your letter of June 14, 1993, in response to our Notice of Violation and Inspection Report No. 50-344/93-06, dated May 20, 1993, I
informing us of the steps you have taken to correct the items which we brought to your attention.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, C. A. VanDenburgh, Chief Reactor Projects Branch j
cc.
Mr. Michael J. Sykes, Chairman, Board of County Commissioners, Columbia County Mr. David Stewart-Smith, Oregon Department of Energy Mr. Tom Walt, General Manager, Technical Functions Mr. Lloyd K. Marbet Mr. Jerry Wilson, Do It Yourself Committee Mr. Eugene Rosolie, Northwest Environmental Advocates f
A'
Regio, V/ ann KJo ston JMel PS fi on RHue CVar1
> gh 1/ j/f),,
g Q q}
1/t /U 7/13A3 7 /l /'/3
/
~UESTTDTVT- '
'ST COPY]
RMIJEST V]
REQUEST COPY]
{STCOPVJ i
YE
/ N0 1 ES / N0 1 YES // N0 il YES) / NO 1 (ES / / NO 1 UU l
wou ro,og ES / N0 1 YES / N0 1 j
i i
.
..
.
._.
j
,.
. -.
A
'
--
..
.
_
!
Portland General BechicCompany
-
m James E. Cross c31 i,. ' '.'; 12 l
.
Vice President and Chief Nuclear Officer
.;
i
!
,
i June 14, 1993 Trojan Nuclear Plant Docket 50-344 i
License NPF-1
!
U.S. Nuclear Regulatory Commission
'
Attn: Document Control Desk Washington DC 20555
Dear Sir:
'
Reolv to a Notice of Violation l
Your letter of May 20, 1993 transmitted a Notice of Violation associated
.
!
with the Nuclear Regulatory Commission Inspection Report No. 50-344/93-06.
Attachment A to this letter contains Portland General Electric Company's
,
response to the violation.
,
,
Sincerely, a
- g Attachment c:/r.BobbyH.Faulkenberry M
i Regional Adminirtrator, Region V i
U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith i
State of Oregon i
Department of Energy i
Mr. J. F. Melfi NRC Resident Inspector i
Trojan Nuclear Plant i
,
I
.. =,
-
121 Sw Sa on Street. Por::and. Oregon 97204 (503)464-8897 l
-
.
- _ _ _ -. - _ _ _ _ -
.
June 14, 1993 Trojan Nuclear Plant Document Ccntrol Desk
'
-
Docket 50-344
.
License NPF-1 Attachment A Page 1 of 2 EEPLY TO NOTICE OF VIOLATION Violation 93-06-01 Title 10, Code of Federal Regulations, Part 50 (10 CFR 50), Appendix B, Criterion V states in part:
" Activities af fecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances, and shall be accomplished in accordanca with these instructions, procedures, and drawings."
Trojan Plant Procedure (TPP) 13-5, Revision 0, dated May 29, 1991,
" Control of In-Plant Unsecured Equipment / Material", requires that all unattended equipment / material which has sufficient mass and mobility to damage safety-related equipment during a seismic event and is located in an area within the scope of the procedure, includi_g the area surrounding the Spent fuel Pool, shall be properly secured. Step 4.2.8 states,
" Portable laddera shall be tied down or laid down when left unattended... "
Contrary to the above:
On Apri*. ?7. 1993, three portable ladders had been left unattended in the area rurrovtding the Spent Fuel Pool.
This.8c a Severity Level IV violation (Supplement I).
Response Portland General Electr.
'
ny (PGE) acknowledges the violation.
,
a 1.
Reason for the Violation The reason for the violation was personnel error, failure to follow the procedure as written. Trojan Plant Procedure (TPP) 13-5 required ladders to be tied down or laid down when left unattended.
2.
Corrective Steps That Have Peen Taken and the Riaults Achieved
!
The scaffold ladders were laid on the floor to comply with the a.
requirements of TPP 13-5.
b.
At a later date, the scaffolding and scaffold ladders were removed to a proper storage location outside the area of the Spent Fuel Pool.
c.
Radwaste Handlers wero sited on this violation and compliance
-
L with the requirements atw med in TPP 13-5.
-
r
--
'--
-
-
. _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
<
..
.
-
- ,
.
June 14, 1993 i
l Document Control Desk Trgjan Nuclear Plant
!
'
' Docket 50-344 f
Attachment A License NPF-1 Page 2 of 2 d.
PGE inspected the Spent Fuel Fool area to determine if the equipment / material in the area complied with the requirements of
TPP 13-5.
One other item was identified and was corrected to meet the requirements of TPP 13-5.
3.
Corrective Steps That Will Be Taken to Avoid Further Violations i
TPP 13-5 will be revised to better define storage locations and
'
This is equipment requirements, including ladders, within the Plant.
l scheduled to be completed by August 15, 1093.
'
i
.
4.
Date When Full Compliance Will Be Achieved
_
<
Full compliance was achieved when the inspection of the Spent Fuel
[
Pool area was completed and the equipment / material in the area was
stored to comply with the requiremants of TPP 13-5.
I i
z f
>
L k
>
.
.
.,
i i
,
!
h JGF/gdd 7529W.0693
..
>