IR 05000344/1982011

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-344/82-11 on 820428-29.No Noncompliance Noted.Major Areas Inspected:Ad Hoc IAEA Insp to Audit Licensee Records & Repts & Svc Surveillance Cameras.Details Withheld (Ref 10CFR2.790 & 10CFR73.21)
ML20053D154
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/24/1982
From: Nelson G, Norderhaug L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20053D144 List:
References
50-344-82-11, NUDOCS 8206040131
Download: ML20053D154 (1)


Text

.

.

.

-

-

-

The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790.

U. S. NUCLEAR REGULATORY COMMISSION

REGION V

Report No. 50-344/82-11 (SG) (IE-V-495)

Docket No. 50-344 License No.

NPF-1 Safeguards Group 4 Licensee:

Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Facility Name: Trojan Nuclear Power Plant Inspection at: Trojan NPP, Rainier and PGE Company Corp. Hdgrs., Portland, Oregon Inspection Conducted: April 28-29, 1982 Date of Last Material Control and Accounting Inspection: November 18-20, 1981 Type of Inspection: Announced, Special Safeguards Inspectors:

_q

NY8~

G. B. Ne

, Chemist Date Signed

  1. f!fi Approved by: 4A

/

<

%

/L. R. Nortierhaugh Chiersaf Branch

' Date' Signed

' ' '

Inspection Summary:

Areas Inspected: Observation of an ad hoc inspection by the IAEA to audit the licensee's records and reports, to service the Agency's surveillance cameras in the SFP Bay, to install and initiate a camera surveillance in the containment building, and to conduct an annual physical inventory taking.

The inspection involved 17 inspector-hours onsite.

Results:

Within the scope of this inspection no items of noncompliance were observed.

8206040131 820526 PDR ADOCK 05000344 G

PDR